| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Columbia Lower Middle | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| All administrative tasks fulfilled with timely quality products | B: 119. Contract Development and Direction | 04/30/2015 | 04/30/2015 | |
| CRITFC Master Plan | C: 174. STEP 1: Hatchery Master Plan Step I through BPA & NPCC acceptance | 06/30/2015 | 06/30/2015 | |
| Step 2: Preliminary design, 30% cost estimate & EC completed & submitted to NPCC | D: 196. STEPS 1 & 2: Initiate Master Plan Step 2 Tasks | 06/30/2015 | 12/31/2014 | |
| Submit drawings and/or specifications to BPA | E: 175. STEP 2: Facility Preliminary design & 30% cost estimate | 06/30/2015 | 12/31/2014 | |
| Step 2 Environmental Compliance Documents | F: 165. STEP 2: Assist with NEPA process contracted by BPA | 06/30/2015 | 12/31/2014 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | 07/01/2014 | ||||||
| B | 119 | Contract Development and Direction | 07/01/2014 | ||||||
| C | 174 | STEP 1: Hatchery Master Plan Step I through BPA & NPCC acceptance | 07/01/2014 | ||||||
| D | 196 | STEPS 1 & 2: Initiate Master Plan Step 2 Tasks | |||||||
| E | 175 | STEP 2: Facility Preliminary design & 30% cost estimate | 07/01/2014 | ||||||
| F | 165 | STEP 2: Assist with NEPA process contracted by BPA | 07/01/2014 | ||||||
| G | 132 | Master Plan will suffice for annual report | 07/01/2014 |