Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 65820: 1996-042-00 EXP RESTORE SALMON CR ANAD FISH
Project Number:
Title:
Restore Salmon Creek Anadromous Fish
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
65820
Contract Title:
1996-042-00 EXP RESTORE SALMON CR ANAD FISH
Contract Continuation:
Previous: Next:
61640: 1996-042-00 EXP RESTORE SALMON CR ANAD FISH
  • 69697: 1996-042-00 EXP RESTORE SALMON CREEK ANADROMOUS FISH
Contract Status:
Closed
Contract Description:
Since 1910, water from Salmon Creek has been stored in Conconully Reservoir, which is delivered to agricultural fields within the Okanogan Irrigation District, via ~ 12 miles of Salmon Creek.  In addition,  the North Fork of Salmon Creek is diverted into Salmon Lake, an off-channel storage reservoir, via a feeder canal.  Water is then released from Salmon Lake to augment storage of Conconully Reservoir.   Both reservoirs are near the town of Conconully, about 17 miles northwest of Okanogan. Two pumping plants supplement the water supply during water-short years.  Shell Rock Pump Station lifts water from the Okanogan River, and Duck Lake Pumping Plant withdraws water from Duck Lake.

Salmon Creek, a tributary to the Okanogan River, is considered to be one of the most significant opportunities to restore summer steelhead in the Okanogan Basin.  This project reconnects the Okanogan River with approximately 11 miles of habitat conducive for spawning and rearing of summer steelhead.  During controlled water releases in 2003, approximately 25 cfs was required for fish migration downstream of the diversion dam.  During 2008 a "low-flow" channel was constructed downstream of the diversion dam which provided suitable fish passage conditions at approximately 10 cfs.  The low flow channel extended the duration of water available through a 12-year water lease program.  During 2011, uncontrolled spill exceeded 500 cfs resulting in an undistinguishable low flow channel.  The low flow channel was re-established after the irrigation season of 2012.  This included re-shaping the outlet of Salmon Creek as well as fortifying the stream bank in two reaches, one of which where a structure was in jeopardy of falling into the channel.  

Evaluation of the migration conditions and the stability of the low-flow channel will continue during the extent of the current water lease (2017).  Minor modifications of the low-flow channel are expected during normal run-off years.
Account Type(s):
Expense
Contract Start Date:
08/01/2014
Contract End Date:
07/31/2015
Current Contract Value:
$215,350
Expenditures:
$215,350

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chris Fisher Colville Confederated Tribes Yes Contract Manager chris.fisher@colvilletribes.com (509) 422-7427
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Keith Kistler Colville Confederated Tribes Yes Interested Party keith.kistler@colvilletribes.com (509) 422-7429
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Kary Nichols Colville Confederated Tribes No Administrative Contact kary.nichols@colvilletribes.com (509) 422-4782
David Roberts Bonneville Power Administration Yes COR daroberts@bpa.gov (503) 230-4511
Paul G. Wagner Colville Confederated Tribes No Interested Party paul.wagner@colvilletribes.com (509) 380-3747


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Requirements B: 165. Environmental Compliance Requirements 04/30/2015 04/30/2015
All administrative tasks fulfilled with timely quality products C: 119. Fulfill all administrative tasks with quality products in a timely manner 05/01/2015 05/01/2015
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR D: 191. Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 06/30/2015 06/30/2015
Evaluation of fish passage conditions during controlled releases. E: 186. Evaluate fish passage conditions during controlled releases 06/01/2015 06/05/2015
Engineered design for bank stabilization structures F: 175. Design of instream structures to stabilize streambank 05/15/2015 05/15/2015
install 2 to 3 instream structures G: 29. Install 2 - 3 instream structures to stabilize stream bank 07/31/2015 03/31/2015
Attach Progress Report in Pisces H: 132. Submit Progress(Annual) Report for the period 8/1/2013 to 7/31/2014 05/31/2015 06/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 08/01/2014
B 165 Environmental Compliance Requirements 08/01/2014
C 119 Fulfill all administrative tasks with quality products in a timely manner 08/01/2014
D 191 Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 08/01/2014
E 186 Evaluate fish passage conditions during controlled releases 08/01/2014
F 175 Design of instream structures to stabilize streambank 08/01/2014
G 29 Install 2 - 3 instream structures to stabilize stream bank 03/13/2015
H 132 Submit Progress(Annual) Report for the period 8/1/2013 to 7/31/2014 08/01/2014