Contract 66156: 2007-399-00 CAP UP SALMON SCREEN TRIB PASS FOR OSC
Project Number:
Title:
Upper Salmon Screen Tributary Passage
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
66156
Contract Title:
2007-399-00 CAP UP SALMON SCREEN TRIB PASS FOR OSC
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract will be used to purchase capital equipment for the Carmen, Bay Horse, and Hawley creek projects.  This contract covers work to be completed by the Lemhi Soil and Water Conservation District.

Deliverables under the contract include 1. Purchase of four pivots, pump, and appurtenances for the Carmen Creek Project.  Installation of 3-phase power to irrigation system;  2.  Purchase of pipeline needed for the Carmen Creek Project; this project is in conjunction with BPA project number 2010-072-00, contract number 63697 under work element 150 Install Sprinkler.  This funding is being utilized for this project in order to purchase capitol supplies and installation of power that is not being included by other funding sources. The Natural Resource Conservation Center (NRCS) is providing $134,260 towards this project through their Environmental Quality Incentive Program (EQIP).

3. Purchase of a bridge for Bay Horse Creek; This project is in conjunction with funding from the Pacific Coastal Salmon Recovery Fund (PCSRF)  in the amount of $112,000.00 funding from BPA for this project will be utilized  to purchase a portion of the structure and no ground disturbance and as match for the PCSRF.  

4. Purchase of a pivot for the Hawley Creek Project; This project is in conjunction with BPA project number 2010-072-00, contract number 63697 under work element 149 install pipeline. Funds from this project will be utilized to purchase a pivot due to increased costs of pipe, additional funding for the Hawley project is from the NRCS in the amount of $100,000 from the EQIP program. An additional $517,699.00 is being provided by the PCSRF program.

5. Excavation of bedrock for the fish screen installation on Hawley creek. This project is in conjunction with BPA project number 2007-399-00, contract number 63734 under work element 69 install fish screen. Funding from this project will be utilized because of the discovery of bedrock during test pit activities completed by the IDFG which were not anticipated initially.m
Account Type(s):
Capital
Contract Start Date:
08/01/2014
Contract End Date:
07/31/2015
Current Contract Value:
$400,000
Expenditures:
$400,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Install power and purchase irrigation system A: 150. Install 3-phase power and purchase sprinkler system for Carmen Creek 07/31/2015 01/21/2015
PSI plastic irrigation pipe with fittings B: 149. Purchase pipeline for Carmen Creek 07/31/2015 05/15/2015
Bridge for Bay Horse Creek C: 85. Purchase bridge for Bay Horse Creek 07/31/2015 12/17/2014
Pivot for Hawley Creek D: 150. Purchase pivot for Hawley Creek 07/31/2015 01/08/2015
Excavation of bedrock for fish screen E: 69. Excavation of bedrock for fish screen on Hawley Creek 09/30/2014 09/30/2014
All administrative tasks fulfilled with timely quality products F: 119. Manage and Administer Project 07/31/2015 07/31/2015
Completion of EC documentation to BPA I: 165. Completion of EC documentation to BPA 08/31/2014 09/16/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 150 Install Sprinkler
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 69 Install Fish Screen
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 149 Install Pipeline
  • 2 instances of WE 150 Install Sprinkler

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 150 Install 3-phase power and purchase sprinkler system for Carmen Creek 08/29/2014
B 149 Purchase pipeline for Carmen Creek 08/01/2014
C 85 Purchase bridge for Bay Horse Creek 09/16/2014
D 150 Purchase pivot for Hawley Creek 08/01/2014
E 69 Excavation of bedrock for fish screen on Hawley Creek 08/01/2014
F 119 Manage and Administer Project 08/01/2014
G 132 Report not required. Wk in this contract reported in other BPA projects. 08/01/2014
H 185 Periodic Status Reports for BPA 08/01/2014
I 165 Completion of EC documentation to BPA 08/01/2014