SOW Report
Contract 67556: 1989-098-00 EXP SALMON STUDIES IN IDAHO RIVERS - NEZ PERCE 2015
Project Number:
Title:
Salmon Studies in Idaho Rivers
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
67556
Contract Title:
1989-098-00 EXP SALMON STUDIES IN IDAHO RIVERS - NEZ PERCE 2015
Contract Continuation:
Previous: Next:
63738: 1989-098-00 EXP SALMON STUDIES IDAHO RIVERS - NEZ PERCE 2014
Contract Status:
Closed
Contract Description:
2015 is planned as the last year of the implementation of this project.  Primary objectives for all contracts under this project will be to complete all data analysis and cooperate in development and writing of finals reports.

The ISS program began in 1992.  In 2005, to respond to ISRP recommendations, the program’s data sets were assessed, and the original ISS study design was updated.  The data set review indicated the data would be sufficient to address the program’s two main goals and that the ANOVA technique proposed in the original study design would be appropriate for much of the analysis.  Alternatively, regression and graphical techniques were also developed for some data sets as recommended by the ISRP.  The effect of general production hatchery strays into ISS study streams was also addressed in the updated study design.  Additional carcass collections were initiated to better quantify the magnitude of this unintended supplementation and will be continued throughout the remainder of the program.  We also developed a supplemental proposal to use microsatellite DNA parentage analyses to address the relative reproductive success of natural, supplementation, and general production fish in a subset of study streams.  However, this would represent a large and costly commitment by the region, and would require additional funds.

Of the 30 streams involved in the ISS program, the NPT portion of the project encompasses nine (9) streams; 5 in the Clearwater River sub-basin (Lolo Creek, Eldorado Creek, Newsome Creek, Fishing Creek, and Legendary Bear Creek) and 4 in the Salmon River sub-basin (Slate Creek, Secesh River, Lake Creek, and Johnson Creek).  Treatment streams include Lolo Creek, Newsome Creek, Fishing Creek, Legendary Bear Creek, and Johnson Creek.  The remainder are control streams (Eldorado Creek, Slate Creek, Secesh River, and Lake Creek).  The Nez Perce Tribal Hatchery program (NPTH) (BPA Project No. 1983-350-03) collects all carcass and redd survey data required by the ISS program in Eldorado Creek, Lolo Creek, and Newsome Creek, and operates adult weirs and juvenile traps on Lolo Creek and Newsome Creek.  All data that is collected is provided to the cooperative ISS project as needed.  The Johnson Creek Artificial Propagation Enhancement program (JCAPE) (BPA Project No. 1996-043-00) collects all data required by the ISS program and operates an adult weir and juvenile trap on Johnson Creek.  All data that is collected is provided to the cooperative ISS project as needed.  The Chinook Salmon Adult Abundance Monitoring in Secesh River, Idaho program (BPA Contract No. 1997-030-00) operates a DIDSON weir in Secesh River for adult abundance estimates.  All data that is collected is provided to the cooperative ISS project as needed.  The NPT ISS project (BPA Project No. 1989-098-02) collects all ISS data in Fishing Creek, Legendary Bear Creek, Slate Creek, Lake Creek, and Secesh River and operates juvenile traps in Lake Creek and Secesh River.  NPT ISS also operates a video weir on Lake Creek.  This weir is a passive weir and allows an adult count into Lake Creek without handling the fish.  All data that is collected is provided to the cooperative ISS project as needed.  Coordination between all projects is required to maintain standardization of all data collected by all factions involved within ISS.  When personnel or equipment shortages might occur within cooperating agencies, NPT ISS personnel and equipment are available for temporary use to install or operate equipment or to collect other data as needed to maintain consistent operations and data for the entire cooperative ISS program.  

Since the streams involved in the ISS program are encompassed within numerous National Forests, National Forest Ranger Districts, State, and private lands, coordination amongst numerous Federal, State, Local, and private organizations and individual land owners is required.  Additionally, whether taken directly or indirectly, listed species are taken and coordination with the Federal agencies that are responsible for recovery is necessary (NOAA, USFWS, and State).  A core group of project leaders from each cooperative agency collects and assembles all the data for evaluation and report writing.  Annual reports (based on brood year) are assembled by cooperators, routed to cooperator agencies for approval, and sent to BPA for posting on their website.  As with all cooperators, NPT ISS is available to assist other ISS cooperators install or maintain equipment, collect data, or coordinate activities as needed.

For the majority of the tasks for this contract (January 1, 2015 to December 31, 2015), the project is completing work in the third and final phase of the design.  During the 2015 contract year, the ISS project will move into an analysis phase and will complete final analyses and produce draft versions of the completion report.  All other tasks described in the 2015 SOW and the work elements are simply a continuation of the project's coordination, analysis and reporting requirements.
Account Type(s):
Expense
Contract Start Date:
01/01/2015
Contract End Date:
12/31/2015
Current Contract Value:
$123,326
Expenditures:
$123,326

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Arleen Henry Nez Perce Tribe Yes Administrative Contact arleenh@nezperce.org (208) 621-3833
Jay Hesse Nez Perce Tribe Yes Supervisor jayh@nezperce.org (208) 621-3552
Ryan Kinzer Nez Perce Tribe Yes Contract Manager ryank@nezperce.org (208) 634-5290x3312
Peter Lofy Bonneville Power Administration Yes COR ptlofy@bpa.gov (503) 230-4193
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Daniel Stone Shoshone-Bannock Tribes No Interested Party dstone@sbtribes.com (208) 239-4555
Doug Taki Shoshone-Bannock Tribes No Interested Party dtaki@sbtribes.com (208) 239-4568
David Venditti Idaho Department of Fish and Game (IDFG) No Interested Party david.venditti@idfg.idaho.gov (208) 465-8404x231
Jason Vogel Nez Perce Tribe No Interested Party jasonv@nezperce.org (208) 621-3602
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance B: 165. Ensure program environmental compliance 04/30/2015 03/31/2015
Attendance at Professional Meetings C: 98. Attend Professional Meetings 12/31/2015 03/06/2015
Draft funding package D: 119. Produce CY2016 SOW, budgets, and inventories 12/31/2015
Program coordination F: 191. Coordination with agencies and public 12/31/2015 12/31/2015
Inventory NPT data collection methods and available datasets. G: 115. Develop and inventory NPT research division data collection efforts and available datasets. 12/31/2015 12/31/2015
Summary report of NPT RPA's and Summarized Performance Measures H: 122. Summary report of NPT RPA Results 12/31/2015 12/31/2015
Attend Coordinated Assessment Workshops I: 189. Attend Coordinated Assessment Workshops 12/01/2015 12/01/2015
Prepare a draft manuscript of a comprehensive ISS supplementation analysis. J: 183. Prepare draft ISS comprehensive analysis publication. 12/31/2015 12/31/2015
Analyze and interpret comprehensive ISS supplementation data. K: 162. Analyze and interpret comprehensive ISS supplementation data. 06/30/2015 06/30/2015
Data and analysis products submitted to IDFG as needed for BiOp reporting L: 202. BiOp RPA Report for CY 2014 03/05/2015 03/05/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 98 Other
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 183 Produce Journal Article
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 01/01/2015
B 165 Ensure program environmental compliance 01/01/2015
C 98 Attend Professional Meetings 01/01/2015
D 119 Produce CY2016 SOW, budgets, and inventories 01/01/2015
E 132 Finalize ISS Cooperative Report for BY12 (period Aug 2012 to June 2014) 01/01/2015
F 191 Coordination with agencies and public 01/01/2015
G 115 Develop and inventory NPT research division data collection efforts and available datasets. 01/01/2015
H 122 Summary report of NPT RPA Results 01/01/2015
I 189 Attend Coordinated Assessment Workshops 01/01/2015
J 183 Prepare draft ISS comprehensive analysis publication. 01/01/2015
K 162 Analyze and interpret comprehensive ISS supplementation data. 01/01/2015
L 202 BiOp RPA Report for CY 2014