| Province | Subbasin | % |
|---|---|---|
| Lower Columbia | Willamette | 100.00% |
| Previous: | Next: |
|---|---|
| n/a |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Kyt Bergstrom | Long Tom Watershed Council | Yes | Contract Manager | fiscal@longtom.org | (541) 654-8965 |
| Dana Dedrick | Long Tom Watershed Council | No | Supervisor | coordinator@longtom.org | (541) 338-7055 |
| Steven Gagnon | Bonneville Power Administration | Yes | COR | skgagnon@bpa.gov | (503) 230-3375 |
| Jed Kaul | Long Tom Watershed Council | Yes | Technical Contact | jkaul@longtom.org | (541) 654-8965x102 |
| Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
| Solomonn Marsh | Bonneville Power Administration | Yes | Contracting Officer | spmarsh@bpa.gov | (503) 230-3943 |
| Justin Moffett | Bonneville Power Administration | Yes | Env. Compliance Lead | jtmoffett@bpa.gov | (503) 230-3233 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| All administrative tasks fulfilled with timely quality products | A: 119. Contractor management of project | 08/14/2016 | 08/14/2016 | |
| Environmental permits and final designs | B: 165. Procurement of all required environmental permits; compliance with all permit and BPA requirements | 08/15/2015 | 08/15/2015 | |
| Completed restoration of inlet to side channel. | C: 30. Re-grading of inlet of side channel at Sam Daws Landing (SDL-1) | 03/31/2016 | 03/31/2016 | |
| Successful construction of apex log jam at side channel inlet. | D: 29. Installation of apex log jam at inlet to side channel at Sam Daws Landing (site SDL-1) | 03/31/2016 | 03/31/2016 | |
| Removal of rock dam and filling of excavated pool. | E: 85. Removal of rock dam in side channel at Sam Daws Landing (SDL-2) | 03/31/2016 | 03/31/2016 | |
| Successful replacement of two rocked crossings. | F: 184. Re-build two rocked, low-water crossings at Sam Daws Landing (SDL-4, SDL-5) | 03/31/2016 | 03/31/2016 | |
| Completion of six log jam structures at Sam Daws Landing to improve habitat complexity. | G: 29. Sam Daws Landing log jam installations (site SDL-6) | 03/31/2016 | 03/31/2016 | |
| Reforestation of nine acres of floodplain at Sam Daws Landing. | H: 47. Reforestation at Sam Daws Landing (9 acres) | 03/31/2016 | 03/31/2016 | |
| Successful implementation of berm removals at two sites. | I: 180. Snag Boat Bend trail and road berm removals (sites SBB-1 and SBB-2) | 03/31/2016 | 03/31/2016 | |
| Implementation of side channel barrier removals at 6 sites at Snag Boat Bend. | J: 85. Removal of passage barriers at 6 sites at Snag Boat Bend (SBB-3a, b, & c, SBB-4, SBB-5, and SBB-6) | 03/31/2016 | 03/31/2016 | |
| Successful construction of box culvert at SBB-7 | K: 184. Replacement of barrier crossing with box culvert at Snag Boat Bend (SBB-7) | 03/31/2016 | 03/31/2016 | |
| Reforestation of 26 acres of floodplain at Snag Boat Bend. | L: 47. Reforestation at Snag Boat Bend (26 acres) | 03/31/2016 | 03/31/2016 | |
| Completed Annual Report | N: 132. Submit Progress Report for the period (Aug 2015) to (Aug 2016) | 08/14/2016 | 08/14/2016 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Willamette River ESU (Threatened) |
|
| Lamprey, Pacific (Entosphenus tridentata) |
|
| Cutthroat Trout, Coastal (O. clarkii clarkii)- Resident Populations |
|
| Trout, Rainbow (Oncorhynchus mykiss) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Contractor management of project | 06/01/2015 | ||||||
| B | 165 | Procurement of all required environmental permits; compliance with all permit and BPA requirements | 06/01/2015 | ||||||
| C | 30 | Re-grading of inlet of side channel at Sam Daws Landing (SDL-1) | 08/15/2015 | ||||||
| D | 29 | Installation of apex log jam at inlet to side channel at Sam Daws Landing (site SDL-1) | |||||||
| E | 85 | Removal of rock dam in side channel at Sam Daws Landing (SDL-2) | |||||||
| F | 184 | Re-build two rocked, low-water crossings at Sam Daws Landing (SDL-4, SDL-5) | |||||||
| G | 29 | Sam Daws Landing log jam installations (site SDL-6) | |||||||
| H | 47 | Reforestation at Sam Daws Landing (9 acres) | |||||||
| I | 180 | Snag Boat Bend trail and road berm removals (sites SBB-1 and SBB-2) | 08/15/2015 | ||||||
| J | 85 | Removal of passage barriers at 6 sites at Snag Boat Bend (SBB-3a, b, & c, SBB-4, SBB-5, and SBB-6) | 08/15/2015 | ||||||
| K | 184 | Replacement of barrier crossing with box culvert at Snag Boat Bend (SBB-7) | 08/15/2015 | ||||||
| L | 47 | Reforestation at Snag Boat Bend (26 acres) | 08/15/2015 | ||||||
| M | 185 | Periodic Status Reports for BPA | 06/01/2015 | ||||||
| N | 132 | Submit Progress Report for the period (Aug 2015) to (Aug 2016) | 06/01/2015 |