SOW Report
Contract 70698: 2002-011-00 EXP KOOTENAI RIVER OPS MITIGATION AND EVALUATION
Project Number:
Title:
Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation Project
Stage:
Implementation
Area:
Province Subbasin %
Mountain Columbia Kootenai 100.00%
Contract Number:
70698
Contract Title:
2002-011-00 EXP KOOTENAI RIVER OPS MITIGATION AND EVALUATION
Contract Continuation:
Previous: Next:
66918: 2002-011-00 EXP KOOTENAI RIVER OPERATIONAL LOSS IMPLEMENTATION
  • 74469: 2002-011-00 EXP KOOTENAI RIVER OPS MITIGATION & EVALUATION
Contract Status:
Closed
Contract Description:
This contract seeks to finish development of a Mitigation Plan, while continuing to plan and implement restoration activities.  In FY2016 the contract name was changed to “Kootenai River Ops Mitigation and Evaluation (KROME)” from the previous: “Kootenai River Operational Loss Assessment”. The original name was the “Kootenai River Floodplain Ecosystem Operational Loss Assessment, Protection, Mitigation and Rehabilitation Project”. The name changes reflect the project’s evolution over time from a planning contract to one with on-the-ground mitigation implementation. Restoration planning and implementation activities conducted by KTOI are divided between three projects: 2002-011-00, 2002-008-00, and 1992-061-00.
Account Type(s):
Expense
Contract Start Date:
12/01/2015
Contract End Date:
11/30/2016
Current Contract Value:
$735,461
Expenditures:
$735,461

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
John Barco III Bonneville Power Administration No Interested Party jwbarco@bpa.gov (503) 230-3223
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Sue Ireland Kootenai Tribe Yes Supervisor ireland@kootenai.org (208) 267-3620
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Norm Merz Kootenai Tribe Yes Contract Manager merz@kootenai.org (208) 267-3620x555
Edna Runyan Kootenai Tribe Yes Administrative Contact edna@kootenai.org (208) 267-3620
Scott Soults Kootenai Tribe Yes Contract Manager soults@kootenai.org (208) 267-3620
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance documentation B: 165. Produce Environmental Compliance Documentation 11/30/2016 06/16/2016
Reports Documenting Coordination Meetings C: 189. Planning, Design & Coordination of Existing & New Projects 11/30/2016 11/28/2016
Operational Loss Relational Database D: 160. Operational Loss Relational Database 11/30/2016 11/28/2016
Report documenting the findings of the avian point counts. E: 156. Collect data and validate model for assessing terrestrial community trophic levels 11/30/2016 11/28/2016
Produce a Protection, Mitigation, Restoration, and Monitoring plan F: 174. Develop a Management Plan for protection, mitigation, and restoration 11/30/2016 11/28/2016
Project Administration G: 119. Oversight and administer Planning and Design and new project activities 11/30/2016 11/28/2016
Annual Report H: 132. Produce annual Progress Report 2015 (11/1/14-11/30/15) 11/30/2016 11/28/2016
Completion Report I: 47. Plant riparian vegetation (FWP) 11/30/2016 11/28/2016
Feasibility and/or design of restoration projects in the canyon reach of the Kootenai River J: 175. Restoration opportunity identification and design - canyon reach (FWP) 11/30/2016 11/28/2016
Summary of project implementation and pictures K: 181. Nimz Ranch Floodplain Enhancement 11/30/2016 11/28/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 11/01/2015
B 165 Produce Environmental Compliance Documentation 11/01/2015
C 189 Planning, Design & Coordination of Existing & New Projects 11/01/2015
D 160 Operational Loss Relational Database 11/01/2015
E 156 Collect data and validate model for assessing terrestrial community trophic levels 11/01/2015
F 174 Develop a Management Plan for protection, mitigation, and restoration 11/01/2015
G 119 Oversight and administer Planning and Design and new project activities 11/01/2015
H 132 Produce annual Progress Report 2015 (11/1/14-11/30/15) 11/01/2015
I 47 Plant riparian vegetation (FWP) 12/01/2015
J 175 Restoration opportunity identification and design - canyon reach (FWP) 11/01/2015
K 181 Nimz Ranch Floodplain Enhancement 05/26/2016