Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71106: 2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
71106
Contract Title:
2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
Contract Continuation:
Previous: Next:
67494: 2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
  • 74770: 2007-402-00 EXP SHO BAN SNAKE RIVER SOCKEYE HABITAT
Contract Status:
Closed
Contract Description:
Goal:  To assess habitat limitations as it pertains to Snake River sockeye salmon Oncorhynchus nerka preservation and recovery, to implement activities necessary to increase and\or reestablish O. nerka productivity in nursery areas in the historic range of Snake River sockeye salmon, and to investigate fish community dynamics in lake nursery areas, including interactions between resident and anadromous O. nerka in present or potential Sawtooth Valley production areas.  We will collaborate with the IDFG to determine release strategies, and assess fish performance from introduction into the lakes up through smolt migration. And provide input to the Technical Oversight Committee for annual strategies regarding the fate of returning adults.

Project objectives include: 1) monitor limnological parameters of the Sawtooth Valley lakes to assess lake productivity; 2) monitor sockeye salmon smolt migration from the production of wild/natural adults in Pettit and Alturas lakes;  3) monitor the number of mature kokanee spawning in Fishhook Creek and estimate fry recruitment in Fishhook and Alturas Lake creeks; 4) conduct sockeye and kokanee salmon population surveys; 5) evaluate potential competition and predation between stocked juvenile sockeye salmon and a variety of fish species in Pettit, and Alturas lakes; and 6) assist IDFG with captive broodstock production activities and supply IDFG with requested RM&E and RPA/BiOp data.
Account Type(s):
Expense
Contract Start Date:
12/01/2015
Contract End Date:
11/30/2016
Current Contract Value:
$456,564
Expenditures:
$456,564

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor ccolter@sbtribes.com (208) 239-4553
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Jenna Peterson Bonneville Power Administration No Interested Party jepeterson@bpa.gov (503) 230-3018
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Doug Taki Shoshone-Bannock Tribes Yes Contract Manager dtaki@sbtribes.com (208) 239-4568
Kurt Tardy Shoshone-Bannock Tribes Yes Interested Party ktardy@sbtribes.com (208) 239-4562
Shannell Ward Shoshone-Bannock Tribes No Interested Party shannell.ward@sbtribes.com (208) 478-3821
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
NEPA compliance, NOAA and IDEQ permit reports submitted A: 165. NEPA clearance, NOAA/DEQ Permits 01/31/2016 01/29/2016
Snake River sockeye RPA/BiOp data submission to IDFG project leader B: 202. Snake River sockeye RPA/BiOp Data 02/26/2016 02/26/2016
Complete collection of all limnological variables C: 157. Complete data collection for all limnological variables 11/20/2016 11/20/2016
Evaluate sockeye salmon smolt migrations D: 157. Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 06/21/2016 06/21/2016
PIT Tag sockeye smolts E: 158. PIT Tag sockeye salmon smolts 06/13/2016 06/10/2016
Complete all adult spawning and hydroacoustic surveys F: 157. Estimate O. nerka populations in three Sawtooth Valley lakes 11/13/2016 11/13/2016
Complete design and installation of PIT tag arrays in Pettit and Alturas creeks. G: 175. Design and Install PIT tag array for adult salmon monitoring 10/31/2016 10/31/2016
Complete all milestones H: 162. Provide recommendations on lake fertilization and fish stocking 11/30/2016 11/30/2016
Fertilization of selected lakes I: 44. Nutrient Enhancement 10/30/2016 09/30/2016
Attend and Participate in TOC meetings J: 189. Regional Coordination 11/30/2016 11/30/2016
Completed Annual Report K: 132. Submit Progress Report for the period 1.01.2014 to 12.31.2014 08/31/2016 08/31/2016
Completed Annual Report L: 132. Submit Progress Report for the period 1.01.2015 to 12.31.2015 10/21/2016 11/30/2016
Contract package (SOW, budget and property inventory) M: 119. Preparation of FY17 Pisces SOW 09/30/2016 09/14/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 44 Enhance Nutrients in Water Bodies
  • 1 instance of WE 175 Produce Design
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA clearance, NOAA/DEQ Permits 12/01/2015
B 202 Snake River sockeye RPA/BiOp Data
C 157 Complete data collection for all limnological variables 12/01/2015
D 157 Evaluate sockeye salmon smolt migration from Pettit and Alturas lakes 12/01/2015
E 158 PIT Tag sockeye salmon smolts 12/01/2015
F 157 Estimate O. nerka populations in three Sawtooth Valley lakes 12/01/2015
G 175 Design and Install PIT tag array for adult salmon monitoring 12/01/2015
H 162 Provide recommendations on lake fertilization and fish stocking 12/01/2015
I 44 Nutrient Enhancement 12/01/2015
J 189 Regional Coordination 12/01/2015
K 132 Submit Progress Report for the period 1.01.2014 to 12.31.2014 12/01/2015
L 132 Submit Progress Report for the period 1.01.2015 to 12.31.2015 12/01/2015
M 119 Preparation of FY17 Pisces SOW 12/01/2015
N 185 Periodic Status Reports for BPA 12/01/2015