Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71132: 2003-017-00 EXP ISEMP - SO FORK RESEARCH
Project Number:
Title:
Integrated Status and Effectiveness Monitoring Program (ISEMP)
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
71132
Contract Title:
2003-017-00 EXP ISEMP - SO FORK RESEARCH
Contract Continuation:
Previous: Next:
67443: 2003-017-00 EXP ISEMP - SO FORK RESEARCH
  • 74634: 2003-017-00 EXP ISEMP - SO FORK RESEARCH
Contract Status:
Closed
Contract Description:
CR-292282:

Note: This contract has no inventory, nothing carried over, and no equipment purchases planned.
Note2: All EC issues are covered by NMFS Section 7,  on the overall Bridge Creek Restoration and Monitoring Project, Wheeler County, OR.
_______________________________________________________________________________________________________________

SFR facilitates data flow, work flow and management (protocol development, data entry, data qa/qc, data delivery, GIS data management and database output) for the ISEMP pilot projects. SFR  also has a field monitoring component within ISEMP and works within the Bridge Creek IMW collecting monitoring information on groundwater, climate, and riparian vegetation. SFR also participates as a project coordinator and data analyst within ISEMP.

This contract is one of several contracts that will implement this project.  Each contract is responsible for an end of contract progress report.  Additionally, a project level "synthesis report" will also be produced under this project and data and analysis from this contract will be utilized in the production of that project level report.  The synthesis report is a deliverable under the Terraqua contract (not this contract) under this project;  currentFY15  contract# 69875 and FY16 CR-293052.
________________________________________________________________________________________________________________

Contract Description: The Integrated Status and Effectiveness Monitoring Program (ISEMP, 2003-017-00) is an ongoing collaborative effort to design, test, implement and evaluate Status and Trends Monitoring for salmon and steelhead populations and their habitat, and watershed-scale Effectiveness Monitoring for management actions impacting salmon and steelhead populations and habitat in the Interior Columbia River Basin.

ISEMP explicitly addresses work requirements of many 2008 FCRPS Biological Opinion RPAs (56.1, 56.2, 56.3, 57.1, 57.2, 57.3, 57.4, 57.5) and is directly related to additional 2008 FCRPS Biological Opinion implementation strategy requirements and recommendations. ISEMP takes a pilot-project approach to the research and development of monitoring by implementing experimental programs in several major subbasins of the Interior Columbia: the Wenatchee, Entiat, Methow, John Day, South Fork Salmon and Lemhi River basins. The overall goal of the project is to provide regional salmon management agencies with the data, information and tools necessary to design efficient and effective monitoring programs.

Specifically, ISEMP generates quantitative guidance on and examples of: the robustness and limitations of population and habitat monitoring protocols, indicators and metrics; sampling design approaches for the distribution of monitoring effort in time and space; analytical approaches to the evaluation of monitoring data, information and programs; effective data management and communication designs that support the use, standardization and compilation of implementation, compliance, status, trends and effectiveness monitoring data by regional data generators and decision makers; and finally the design and implementation of watershed-scale restoration actions to maximize both the biological impact and associated learning opportunities resulting from the design and implementation strategy.

Through its work to date, ISEMP has developed expertise in the coordination and implementation of large-scale monitoring data collection programs. Applying this experience, ISEMP coordinates the installation, maintenance and calibration of in-stream PIT tag arrays across the Snake River basin and is designing and coordinating the implementation of a Columbia River basin-wide stream habitat status and trends monitoring. These programmatic implementation facets of ISEMP leverage previous experience with logistics and social factors to effectively implement comprehensive, standardized monitoring research and development at an unprecedented scale.
Account Type(s):
Expense
Contract Start Date:
12/01/2015
Contract End Date:
11/30/2016
Current Contract Value:
$504,997
Expenditures:
$504,997

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Time and Materials
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Richard Golden Jr Bonneville Power Administration Yes COR rlgolden@bpa.gov (503) 230-5119
Stephanie Green Bonneville Power Administration Yes Contracting Officer sagreen@bpa.gov (360) 418-2710
Chris Jordan National Oceanic and Atmospheric Administration No Supervisor chris.jordan@noaa.gov (541) 754-4629
Peter Lofy Bonneville Power Administration No Interested Party ptlofy@bpa.gov (503) 230-4193
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Gregory Smith Bonneville Power Administration Yes Env. Compliance Lead gmsmith@bpa.gov (503) 230-5049
Carol Volk South Fork Research, Inc. Yes Contract Manager carol@southforkresearch.org (206) 240-0301


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Completed EC documentation for FY 2016 A: 165. Provide EC documentation for WE C and D monitoring 11/30/2016 11/30/2016
All administrative tasks fulfilled with timely quality products B: 119. Manage and Administer ISEMP tasks, contracts, and subcontracts for SFR 11/30/2016 11/30/2016
Review documents produced by ISEMP personnel and meeting participation C: 174. Participate in RME planning process for ISEMP basins 11/30/2016 11/30/2016
Field data in electronic format D: 157. Collect monitoring field data in Bridge Creek 10/01/2016 11/30/2016
Analytical product summaries produced for the ISEMP-CHaMP annual report E: 162. Modeling and analysis of Bridge Creek data 11/30/2016 11/30/2016
Model and analytical summaries for the ISEMP-CHaMP annual report F: 162. Modeling and analysis of regional ISEMP data 11/30/2016 11/30/2016
Publicly consumable GIS project metadata and general ISEMP information via website. G: 161. Sharing ISEMP modeling and GIS project information 11/30/2016 11/30/2016
Submit BiOp RPA Report in Taurus H: 202. BiOp RPA Report for CY 2015 03/31/2016 03/31/2016
Updated life cycle model code, updated user manual, example outputs, and planning document K: 162. Production improvements to ISEMP Life Cycle Model 11/30/2016 11/30/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 174 Produce Plan
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 174 Produce Plan
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide EC documentation for WE C and D monitoring 12/01/2015
B 119 Manage and Administer ISEMP tasks, contracts, and subcontracts for SFR 12/01/2015
C 174 Participate in RME planning process for ISEMP basins 12/01/2015
D 157 Collect monitoring field data in Bridge Creek 12/01/2015
E 162 Modeling and analysis of Bridge Creek data 12/01/2015
F 162 Modeling and analysis of regional ISEMP data 12/01/2015
G 161 Sharing ISEMP modeling and GIS project information 12/01/2015
H 202 BiOp RPA Report for CY 2015
I 185 Periodic Status Reports for BPA 12/01/2015
J 132 Contribute ISEMP RM&E Tech. Report (Lessons Learned Report) 12/01/2015
K 162 Production improvements to ISEMP Life Cycle Model 12/01/2015