NEPA Compliance and Other Requirements Complete For Habitat Restoration Projects To Be Implemented |
B: 165. Obtain Environmental Compliance |
|
01/31/2017 |
01/31/2017 |
Manage & Administer Project |
C: 119. Manage & Administer Project |
|
01/31/2017 |
01/31/2017 |
Viable Restoration Projects Developed To Assist In The Attainment Of Project Goal |
D: 114. Habitat Restoration Project Development |
|
01/31/2017 |
01/31/2017 |
Remove Noxious Weeds & Revegetate project areas within Trout Creek |
E: 47. Revegetate Exclosure Area Within The Trout Creek Project Area |
|
01/31/2017 |
01/31/2017 |
Removal Of Under Sized And/Or Partial Fish Barrier Culverts In Upper Trout Creek Basin |
F: 184. Replace Undersized Culverts In Upper Trout Creek Basin |
|
12/16/2016 |
12/15/2016 |
Co-develop Specifications Trout Creek berm removal and channel alignment work. |
G: 175. Co-Develop Design Specifications For Trout Creek Berm removal and Little Trout habitat project |
|
01/31/2017 |
01/31/2017 |
Relocation and removal of Existing Road in the Upper Trout Creek Basin |
H: 38. Remove and Relocate Road from Floodplain In Upper Trout Creek Basin |
|
10/31/2016 |
10/31/2016 |
Monitor Trout Creek Basin Riparian Exclosures |
I: 26. Monitor Exclosures |
|
01/31/2017 |
01/31/2017 |
Maintained Fences & Water Gaps |
J: 186. Maintain Riparian Corridor Fence |
|
01/31/2017 |
01/31/2017 |
Maintained Instream and Floodplain Structures |
K: 186. Maintain Instream and Floodplain Structures |
|
01/31/2017 |
01/31/2017 |
Repaired/Maintained Off Channel Water Development Sites |
L: 186. Repair/Maintain Off Channel Water Development Sites |
|
01/31/2017 |
01/31/2017 |
Off site water development |
M: 34. Develp Off channel water development sites |
|
01/31/2017 |
12/15/2016 |
Basin Wide Redd Counts |
N: 157. Adult Redd Counts |
|
01/31/2017 |
01/31/2017 |
Technical Assistance Provided |
O: 122. Provide Technical Assistance & Input |
|
01/31/2017 |
01/31/2017 |
Monitor past channel realignment instream design work and floodplain shaping actions. |
P: 157. Monitor past channel realignment and floodplain restoration work to refine future designs |
|
01/31/2017 |
01/31/2017 |
Stream Water Temperature Monitored |
Q: 157. Monitor Stream Water Temperature In The Trout Creek Basin |
|
01/31/2017 |
01/31/2017 |
Data Captured In Two Data Bases (One For Adults & One For Juveniles) |
R: 157. Monitor Smolt Production & Adult Escapement |
|
01/31/2017 |
01/31/2017 |
Summer Steelhead Smolts PIT Tagged |
S: 158. PIT Tag Out-Migrant Summer Steelhead Smolts |
|
09/30/2016 |
09/30/2016 |
PIT Tag Data Submitted To PTAGIS |
T: 159. Submit & Acquire PIT Tag Data To/From PTAGIS |
|
06/30/2016 |
06/30/2016 |
ESA Listed Mid Columbia Summer Steelhead Monitored |
U: 162. Analyze Adult Summer Steelhead Escapement & Summer Steelhead Smolt Out-Migrant Estimates |
|
01/31/2017 |
01/31/2017 |
Final annual report for calendar year 2015 |
V: 132. Produce Annual For 1/1/2015 to 12/31/2015 |
|
01/27/2017 |
01/03/2017 |