| Upload SOW, budget, property inventory for upcoming contract period to Pisces. |
A: 119. Manage and Administer Project |
|
01/31/2017 |
01/31/2017 |
| Receipt of environmental compliance clearance on project work elements from BPA |
B: 165. Produce Environmental Compliance Documentation |
|
01/31/2017 |
01/31/2014 |
| Final (100%) Birch Creek Geomorphic Assessment and Action Plan |
C: 115. Birch Creek Assessment and Action Plan |
|
01/31/2017 |
01/30/2017 |
| List of final projects |
D: 114. CTUIR Umatilla Subbasin Restoration Coordination |
|
01/31/2017 |
01/31/2017 |
| Provide technical input and summaries to enhance or protect natural resources in the subbasin. |
E: 122. Review and provide technical input on issues and topics that affect the areas natural resource |
|
01/31/2017 |
01/31/2017 |
| Coordinate watershed association activities |
F: 191. Umatilla River Watershed coordination duties |
|
01/31/2017 |
01/31/2017 |
| Complete outreach and education activities |
G: 99. Public Outreach and Education |
|
01/31/2017 |
01/31/2017 |
| Maintain proper operation of instream habitat structures |
H: 186. Inspect and maintain function of instream improvement structures |
|
01/31/2017 |
12/30/2016 |
| Maintenance of habitat features associated with project conservation easements. |
I: 186. Maintenance of habitat features associated with project conservation easements |
|
01/31/2017 |
01/31/2017 |
| Maximize survival of native vegetation in enhancement project areas. |
J: 198. Enhance native vegetation by noxious weed control within Umatilla River Subbasin project areas |
|
01/31/2017 |
12/30/2016 |
| Complete scheduled tree and shrub plantings in project areas |
K: 47. Meacham Creek Floodplain Restoration and In-stream Enhancement, RM's 4.9-6.1 Planting |
|
01/31/2017 |
12/15/2016 |
| Incorporate project effectiveness and regional data into project activities and annual BPA rep |
L: 115. Field Data Collection |
|
01/31/2017 |
12/30/2016 |
| Upload project effectiveness photo point photos to CTUIR data depository. |
M: 157. Project Effectiveness Photo Point Monitoring |
|
01/31/2017 |
12/30/2016 |
| Meacham Creek - Bonifer Instream Restoration Design Project |
N: 175. Meacham Creek - Bonifer instream Restoration design project |
|
01/31/2017 |
12/31/2016 |
| Complete channel reconstruction and in-stream enhancement on about 0.9 mile of stream |
O: 180. Meacham Creek - Bonifer Floodplain Restoration and In-stream Enhancement (RM 1.9 - 5.7)- Year 1 |
|
01/13/2017 |
|
| Completed channel construction |
P: 30. Meacham Creek - Bonifer Floodplain Restoration and Off-Channel Habitat Complexity (RM 1.9 - 5.7)- Y1 |
|
01/31/2017 |
|
| Meacham Creek Weed Treatment, Riparian Planting and Coordination |
Q: 198. Meacham Creek Riparian Vegetation Maintenance |
|
01/31/2017 |
01/31/2017 |
| Upper Umatilla and Meacham Creek LiDAR Flight Data Acquisition |
R: 115. 2016 Upper Umatilla River / Meacham LiDAR Flight Acquistion |
|
01/31/2017 |
12/30/2016 |
| Wildhorse Creek - Athena Bridge Replacement Project |
S: 175. Wildhorse Creek- Athena Fish Passage Project Design |
|
01/31/2017 |
|
| Dillon Dam Fish Passage Improvement Project Design |
T: 175. Dillon Dam Fish Passage Project Design |
|
01/31/2017 |
01/31/2017 |
| Completed Annual Report |
V: 132. Produce Annual Progress Report CY15 (Jan. 1, 2015 thru Dec. 31, 2015) |
|
11/15/2016 |
11/14/2016 |