| 68523: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Salmonid habitat improved at RM 7 of the South Fork Touchet River | A: 29. Habitat restoration of the South Fork Touchet River, RM 7.5 | 10/31/2016 | 09/15/2016 | |
| Improve riparian vegetative components and physical habitat metrics | B: 47. Enhance riparian vegetative components at select project sites | 11/30/2016 | 11/30/2016 | |
| Construction Management Complete | C: 100. Engineered construction oversight, SF Touchet River | 09/30/2016 | 09/15/2016 | |
| Projects identified and prioritize; short and long term | D: 114. Identify and select habitat projects that benefit salmonids | 01/31/2017 | 09/30/2016 | |
| Upload complete Assessment and Action Plan | E: 115. Completion of the Lower Mill Creek Assessment | 12/31/2016 | 12/30/2016 | |
| Upload results and recommendations derived from inventory | F: 115. South Fork Touchet River, RM 10 Inventory | 10/31/2016 | 09/22/2016 | |
| Upload results and recommendations derived from inventory | G: 115. South Fork Walla Walla River Inventory | 01/31/2017 | 10/12/2016 | |
| Upload results and recommendations derived from inventory | H: 115. Walla Walla River, Nursery Bridge Inventory | 01/31/2017 | 01/31/2017 | |
| Project administration activities managed effectively | I: 119. Conduct all project management activities | 01/31/2017 | 01/31/2017 | |
| Provide technical support through interagency coordination and public forum | J: 122. Provide technical support | 01/31/2017 | 01/31/2017 | |
| Completed Annual Report | K: 132. Annual Progress Report (2-1-16) to (1-31-17) | 01/31/2017 | 01/31/2017 | |
| Environmental compliance | L: 165. Produce environmental compliance for on the ground work | 07/31/2016 | 05/18/2016 | |
| Upload designs, basis of design report, and construction sequence plan | M: 175. South Fork Touchet River, RM 10 Design | 01/31/2017 | 09/22/2016 | |
| Upload designs, basis of design report, and construction sequence plan | N: 175. South Fork Walla Walla River Design | 01/31/2017 | 01/31/2017 | |
| Produce final design | O: 175. Walla Walla River, Waggoner Reach Design | 01/31/2017 | 06/22/2016 | |
| Upload designs, basis of design report, and construction sequence plan | P: 175. Walla Walla River, Nursery Bridge Design | 01/31/2017 | 01/31/2017 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Trout, Rainbow (Oncorhynchus mykiss) |
|
| Trout, Interior Redband (O. mykiss gairdnerii) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 29 | Habitat restoration of the South Fork Touchet River, RM 7.5 | 04/30/2016 | ||||||
| B | 47 | Enhance riparian vegetative components at select project sites | 04/25/2016 | ||||||
| C | 100 | Engineered construction oversight, SF Touchet River | 02/01/2016 | ||||||
| D | 114 | Identify and select habitat projects that benefit salmonids | 02/01/2016 | ||||||
| E | 115 | Completion of the Lower Mill Creek Assessment | 04/25/2016 | ||||||
| F | 115 | South Fork Touchet River, RM 10 Inventory | 04/25/2016 | ||||||
| G | 115 | South Fork Walla Walla River Inventory | 04/25/2016 | ||||||
| H | 115 | Walla Walla River, Nursery Bridge Inventory | 04/25/2016 | ||||||
| I | 119 | Conduct all project management activities | 02/01/2016 | ||||||
| J | 122 | Provide technical support | 02/01/2016 | ||||||
| K | 132 | Annual Progress Report (2-1-16) to (1-31-17) | 02/01/2016 | ||||||
| L | 165 | Produce environmental compliance for on the ground work | 02/01/2016 | ||||||
| M | 175 | South Fork Touchet River, RM 10 Design | |||||||
| N | 175 | South Fork Walla Walla River Design | |||||||
| O | 175 | Walla Walla River, Waggoner Reach Design | |||||||
| P | 175 | Walla Walla River, Nursery Bridge Design | |||||||
| Q | 185 | Periodic Status Reports for BPA | 02/01/2016 |