Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 71864: 1994-018-06 EXP COL COUNTY TUCANNON STREAM & RIPARIAN RESTORATION
Project Number:
Title:
Tucannon Stream and Riparian Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
71864
Contract Title:
1994-018-06 EXP COL COUNTY TUCANNON STREAM & RIPARIAN RESTORATION
Contract Continuation:
Previous: Next:
68607: 1994-018-06 EXP COL COUNTY TUCANNON STREAM & RIPARIAN RESTORATION
  • 75465: 1994-018-06 EXP COLUMBIA COUNTY STREAM & RIPARIAN RESTORATION
Contract Status:
Closed
Contract Description:
Background: Project goal is to implement habitat protection, enhancement and recovery strategies to restore habitat function and channel processes throughout the basin to improve species key life cycle survival and productivity.  Project focus is to assist implementation of the 45 projects prioritized into three implementation tiers throughout the 50 river miles in the completed geomorphic assessment areas.  The 45 projects are broken into three tiers of implementation priority, tier 1 being the highest priority.  There are 12-tier 1, 14-tier 2 and 19-tier 3 projects.  Individual Project Areas are designed at a sub-reach and/or reach scale.  The accumulated sub-reach and reach scale restoration actions will significantly improve natural processes and habitat conditions as well as the process utilized for identifying and prioritizing project selection and implementation.  Effectively changing river processes and habitat function requires reach-scale actions which is a goal of this project.  Conventionally, small scale or site specific actions have been the norm because of lack of reach scale geomorphic assessments and long-term funding commitments.  Long-term sufficient funding level commitment will lead to restoring channel processes and habitat function at and across the reach scale, improving species survival and productivity in the Tucannon River.

The technical basis for individual project areas was to first complete Phase I, Tucannon River Geomorphic Assessment and Habitat Restoration Study, (Anchor QEA April 2011) which includes; basin description, geomorphic conditions, fish habitat and distribution, hydrologic analysis, sediment transport and mobility analysis, sediment budget analysis and reach characteristics and delineation of 10 discrete river reaches.  This work strengthened the technical understanding of previously identified limiting factors, existing physical conditions and geomorphic processes in the basin in order to identify and prioritize habitat restoration areas.  Included in Anchor's assessment was Light Detection and Ranging (LiDAR) data and true color Orthophotography of the Tucannon River floodplain, (Watershed Sciences, 2010).  

Phase II was to complete conceptual restoration plans for river reaches 6-10 and reach 2 and then rank and prioritize them based on a restoration framework loosely following the recommendation of Roni et al. (2002).  The criteria used for this framework was focused on Spring Chinook in support, coordination and cooperation with the Snake River Salmon Recovery Board (SRSRB) in their development of the Tucannon River Programmatic Habitat Project.  It was reasonably assumed habitat improvements for spring Chinook will also greatly benefit steelhead.  This phase was completed in November 2011 (Anchor QEA, November 2011).  This phase also included 30% designs for Project Area (PA) 2 (Anchor QEA November 2011b) and PA 14 (Anchor December 2011).  

Phase III included the conceptual restoration plans for reach 3 and 4 (Anchor QEA October 2012) and the development of the Integrated Species Restoration Prioritization, Tucannon River document (Anchor QEA November 2012) covering the Tucannon River from river mile 0.7 to 50.3 as well as including all ESA listed species and life cycles.  The conceptual restoration plan for reach 5 was completed for the Snake River Salmon Recovery Board (Anchor QEA October 2012) and was included.
________________________________________________________________________
Summary: The individual reach-scale projects (Project Areas-PA) covered in this proposal have been identified and prioritized by the geomorphic and conceptual restoration plans and reviewed by the SRSRB Regional Technical Team (RTT) and Tucannon Coordinating Committee (TCC) and placed on the SRSRB 3-year habitat work schedule.  Project areas are assessed under the following elements; channel characterization, floodplain characterization, conceptual project actions, geomorphic implications, biological benefits and potential challenges.  Projects are then evaluated and placed in implementation tiers based on four criteria: expected biological response, consistency with natural processes, benefit-to-cost, and reach priority (Anchor November 2012, pages 29-44). The selection criteria that prioritizes the projects will address the limiting factors outlined for the Tucannon River in the Federal Columbia River Power System Biological Opinion.

The Columbia Conservation District (CCD) will implement actions under the Tucannon Stream and Riparian Protection, Enhancement and Restoration Project to address and improve riparian area recovery/maintenance, flood plain connectivity and function, and instream habitat quantity and diversity, the primary aquatic habitat limiting attributes identified thru EDT analysis and the Geomorphic Assessment and Habitat Restoration Study covering the Tucannon Subbasin. The District will focus implementation on Tier 1 and Tier 2 projects (26) with the core of projects (18) falling in river reaches 6-10, a critical fish (steelhead and spring Chinook) utilization overlap core area, while targeting private lands; approximately 75% of the assessed basin is in private landownership.  CCD will present project proposals to affected landowners and assess interest and willingness to participate; as priority projects planned for implementation progress through design stages, they will be reviewed by the RTT, incorporating technical input.  Depending on landowner commitment and technical merit, we will also actively pursue (8) Tier-1 and Tier-2 projects for implementation in river reaches 2-5; private landowner willingness and the District's ability to leverage BPA funding are critical drivers in successful implementation of theses additional projects.  

Objectives: Riparian recovery/maintenance, flood plain connectivity and instream habitats are critical management objectives addressing the broadest diversity of limiting attributes in identified priority restoration and protection geographic areas will be addressed.  Biological objectives of diversity, reduced embeddedness, LWD recruitment, primary pools, high flow refugia, riparian recovery and temperature will be addressed with this strategy and benefit ESA-listed and cultural significant focal species, spring and fall Chinook, steelhead and bull trout during their respective key life stages throughout the watershed.  Accumulated restoration/protection geographic areas, Pataha/Marengo thru Mountain Tucannon matches NOAA's  Major Spawning Aggregation designation, (MSA), Pataha/Marengo to Tucannon Mouth and Lower Pataha match NOAA'a Minor Spawning Aggregation designations (mSA).  

Implement habitat protection, enhancement and recovery strategies to support FCRPS BiOp habitat goals, the Snake River Salmon Recovery Plan, and the Tucannon Subbasin Plan -- including support for identified ESA-listed and culturally significant or focal, species of interest in the Tucannon Subbasin. Instream habitat quantity and diversity project focus is within priority protection/restoration geographic areas which cover the entire watershed due to species and species specific life cycle needs.  Projects, implementing identified strategies, address various biological objectives; sediment reduction, primary pools, flood plain connectivity and LWD recruitment/placement.  Project implementation will provide habitat benefits to spring/fall Chinook, steelhead and bull trout during their respective varied life stage needs throughout the watershed.
________________________________________________________________________________
Management Considerations: Full project implementation (45) to achieve the habitat restoration objectives identified in the various assessment documents remains an ambitious challenge. Prior to the establishment of the Tucannon River Programmatic Habitat Project [#2010-077-00] coordinated by the SRSRB, habitat restoration was primarily restricted to actions directed through the Tucannon Stream and Riparian Restoration program (CCD) - with a limited and leveraged funding base.  The now well-coordinated, cooperative implementation of prioritized habitat improvement projects among the CCD, WDFW, SRSRB and CTUIR (Fish Accord) will accelerate priority restoration actions addressed to identified limiting factors throughout the subbasin.  Considering the number of projects identified, still limited annual funding (although greatly improved among the programs), an abbreviated seasonal work-window, potential project phasing due to complexity and scale/scope, landowner willingness to participate, and the available capacity to implement multiple projects per year, effective planning and implementation progression require close attention.

In the interim, to track progress using project effectiveness monitoring, BPA is funding CHaMP monitoring at 15 annual sites and 30 rotating panel sites across the basin.  In addition to the randomly selected (GRITS) CHaMP sites independently funded by BPA, the Snake River Salmon Recovery Board proposes to include four "prescribed" sites to the sampling.  These four sites are at specific planned project sites so that project specific effectiveness can be tracked in addition to the watershed scale status and trends data collected by the GRITS based design.  Both of these monitoring efforts are being conducted by independent contractors.  This coordinated M&E effort was put in place to reduce duplication of effort, cost and develop consistency in the methodology and protocols on a sub-regional scale.  Regional review of monitoring data will inform management direction adaptively, as to potential shift in implementation actions to address priority habitat limiting factor response.  CCD anticipates projects implemented within this project will fall under the BPA umbrella CHaMP monitoring with oversight coordination provided by the SRSRB.
Account Type(s):
Expense
Contract Start Date:
04/01/2016
Contract End Date:
03/31/2017
Current Contract Value:
$386,354
Expenditures:
$386,354

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Terry Bruegman Columbia Conservation District (SWCD) No Supervisor tb-ccd@daytonwa.net (509) 382-4273x102
Kris Buelow Snake River Salmon Recovery Board Yes Technical Contact kris@snakeriverboard.org (509) 392-3858
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Debra Nordheim Columbia Conservation District (SWCD) Yes Contract Manager dn-ccd@daytonwa.net (509) 382-4273x101
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration A: 119. Project implementation management and contract administration 03/31/2017 03/31/2017
Documentation and assistance for environmental and cultural resource clearances. B: 165. Environmental Compliance Clearance for riparian restoration & habitat enhancement projects 03/31/2017 03/31/2017
Prioritized habitat project list C: 114. Implementation guidance: potential projects list (updated) 03/31/2017 03/31/2017
Develop projects and plan implementation D: 175. Project development and implementation planning 03/31/2017 03/31/2017
Coordinate Tucannon Watershed Program to improve habitat E: 191. Coordinate Columbia County (Tucannon) Watershed Program 03/31/2017 03/31/2017
Meetings, tours, presentations F: 99. Community Involvement in Habitat Restoration 03/31/2017 03/31/2017
Install up to 50 PALS habitat structures to promote instream habitat function & complexity G: 29. Little Tucannon: Post-Assisted Log Structures (PALS) 09/30/2016 08/31/2016
Establish 0.64 miles of off-site dike H: 180. PA 28: Dike (cobbled berm) modification or removal (breach, reduction, and offset) 09/30/2016 08/31/2016
(Re)establish streambank, riparian zone and floodplain native grass communities I: 47. PA 28: Establish Riparian and Floodplain Plant Community 12/31/2016 09/29/2016
Submit 2-year Progress (Annual) Report for 2015 & 2016 K: 132. Progress Report (2-year) for 2015 and 2016 (01/01/2015 - 12/31/2016) 03/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project implementation management and contract administration 04/01/2016
B 165 Environmental Compliance Clearance for riparian restoration & habitat enhancement projects 04/01/2016
C 114 Implementation guidance: potential projects list (updated) 04/01/2016
D 175 Project development and implementation planning 04/01/2016
E 191 Coordinate Columbia County (Tucannon) Watershed Program 04/01/2016
F 99 Community Involvement in Habitat Restoration 04/01/2016
G 29 Little Tucannon: Post-Assisted Log Structures (PALS) 07/21/2016
H 180 PA 28: Dike (cobbled berm) modification or removal (breach, reduction, and offset) 07/21/2016
I 47 PA 28: Establish Riparian and Floodplain Plant Community 07/21/2016
J 185 Periodic Status Reports for BPA 04/01/2016
K 132 Progress Report (2-year) for 2015 and 2016 (01/01/2015 - 12/31/2016) 04/01/2016