Contract 71969: PROJECT ACTION EFFECTIVENESS MONITORING
Project Number:
Title:
BPA Project Action Effectiveness Monitoring (AEM) Programmatic
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
71969
Contract Title:
PROJECT ACTION EFFECTIVENESS MONITORING
Contract Continuation:
Previous: Next:
n/a
  • 74809: 2016-001-00 EXP PROJECT ACTION EFFECTIVENESS MONITORING
Contract Status:
Closed
Contract Description:
This contract provides technical support and implementation assistance for BPA's Programmatic Approach for Action Effectiveness Monitoring (AEM).  The contractor will collect, analyze, and interpret data under the Extensive Post Treatment (EPT) protocol, work collaboratively with other BPA Fish and Wildlife Program sponsors to select control and treatment sites, and produce annual reports to disseminate the results for BPA funded projects that participate in the AEM Program.  This professional analysis and collaboration will guide and provide continuous adaptive management for habitat restoration actions that address habitat impairments with the objective of improving the productivity, abundance, and distribution of ESA listed anadromous fish species throughout the Columbia River Basin (ESU/DPSs).

Under this contract Cramer Fish Sciences will:

1. Identify and conduct site visits to confirm LWD sites to be monitored in the 2016 field season
2. Monitor and collect fish and habitat data for up to 15 LWD projects funded by BPA
3. Summarize, analyze, and report on the effectiveness of LWD projects evaluated in the 2016 field season
4. Begin site reconnaissance for instream projects to be evaluated in 2017
5. Participate in meetings to coordinate AEM activities and assure consistency of monitoring protocols
Account Type(s):
Expense
Contract Start Date:
01/15/2016
Contract End Date:
12/31/2016
Current Contract Value:
$328,000
Expenditures:
$328,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract
Pricing Method:
Firm Fixed Price
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
EC requirements complete A: 165. Produce Environmental Compliance for Monitoring of Fish and Habitat 06/30/2016 06/30/2016
2016 LWD Sites Confirmed B: 114. Identify LWD Sites to be Monitored in 2016 06/30/2016 06/30/2016
Fish and Habitat Data C: 157. Conduct Monitoring and Collect Field Data 12/31/2016 12/29/2016
Data Analysis and Interpretation D: 162. Analyze and Summarize Data Collected for LWD Projects 11/30/2016 11/30/2016
FY 2017 Contract Package and FY 2016 Accrual Estimate E: 119. Project Management for CFS Team 09/22/2016 09/21/2016
2015 Annual Report for MBACI and EPT AEM F: 132. Progress Report for 1/1/15 - 12/31/15 02/29/2016 02/29/2016
RM&E Synthesis, Habitat Restoration Prioritization Tool Manuscript, Proposed Action Development H: 122. RM&E Synthesis, Habitat Restoration Prioritization Tool Manuscript, Proposed Action Development 12/31/2016 12/24/2016

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance for Monitoring of Fish and Habitat 01/01/2016
B 114 Identify LWD Sites to be Monitored in 2016 01/01/2016
C 157 Conduct Monitoring and Collect Field Data 01/01/2016
D 162 Analyze and Summarize Data Collected for LWD Projects 01/01/2016
E 119 Project Management for CFS Team 01/01/2016
F 132 Progress Report for 1/1/15 - 12/31/15 01/01/2016
G 185 Periodic Status Reports for BPA 01/01/2016
H 122 RM&E Synthesis, Habitat Restoration Prioritization Tool Manuscript, Proposed Action Development 01/15/2016