Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 72327: 1992-026-01 EXP BIOP CATHERINE CREEK S. CROSS SHOEMAKER KINSLEY
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
72327
Contract Title:
1992-026-01 EXP BIOP CATHERINE CREEK S. CROSS SHOEMAKER KINSLEY
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The overall project goal is to restore natural channel functions and processes that provide increased capacity to spawn and rear ESA listed Salmon and Steelhead while protecting and maintaining the utility and economic viability of working ranches.  The project objectives are to protect habitat, enhance floodplain connectivity, in-stream structural diversity and complexity, and riparian habitat conditions assisting Salmon/Steelhead recovery.  Project activities reduce excessive bank erosion, heavy sediment loads, and high summer water temperatures, while creating and or enhancing complex fish habitat, especially large wood structures, and increasing riparian vegetation. Consequently, these limiting factors for Spring/Summer Chinook, Steelhead, and Bull trout in the Upper Grande Ronde/Catherine Creek Subbasin will be addressed.
  
The project area is located within Reach UGS10A (Summer Steelhead) and Reach CCC3 (Spring-Summer Chinook) (Northeast Oregon Snake River Recovery Plan, Draft (NOAA, March 2012) and BiOp Expert Panel Draft Reach Delineations (BPA/BOR, April 2012). Geographically, these reaches encompass Middle Catherine Creek from the confluence of Pyles Creek upstream to the North and South Forks of Catherine Creek.  The Project Area is also located within Reach 4 of the Bureau of Reclamation Tributary Assessment (BOR, February 2012) and has been identified as one of the highest priority reaches for restoration actions.  BOR and ODFW assessments found Catherine Creek within this project area to include stream bank instability, high channel width/depth ratios, poor riparian vegetation, lack of side channel habitat and floodplain connectivity, and poor in-channel diversity and complexity within individual reaches. Additionally, the project reach is affected by winter icing, high summer water temperatures, and low summer base flow.

Phase IV - Habitat enhancement efforts will take place over 3 connecting properties and  include:

•   Installation of 55 LWM structures, 220 LF of edge roughness, 335 ft of brush mattress,  49 single logs with rootwad, 7 channel spanning logs,  67 two-log floodplain roughness structures, and166 floodplain/side channel tree tops with branches.

•  Activation of 4200 LF of new main channel with 15 riffles, 1380 LF of side channel, 1425 LF of alcoves and spring channels, and 9200 LF wetland swales/beaver complexes to provide juvenile Salmonid refuge and connection to an adjacent spring supplying colder water during low flow season. Project will also activate 142 main channel wood structure components installed during Phase III.  

•   Construction of 795 LF of new side channel.

•   Boulder placement to induce ice break-up during winter months, increase channel complexity, and provide increased resiliency to wood structures.

•   Installation of 1 hardened livestock crossing.

•   Using a combination of live stakes, plugs, and containerized plants all disturbed areas during construction will be re-seeded using native seed mixes and plants.  520 LF of Live stake trenches will be installed in channel to re-establish native plant communities on constructed gravel bars.100 large willow/cottonwood poles will also be installed with heavy machinery into rip-rap banks.    


The completed project area will further sustain steelhead, Chinook and bull trout, as well as other species.  Specific project benefits include:

•   Potential increased summer base flow conditions and decreased summer high water temperatures.

•   Increased winter temperatures with increased hyporheic connectivity and improved riparian and floodplain conditions.

•   Improved/restored floodplain connectivity and natural channel morphology with stable channel form.

•   Increased juvenile refugia with creation of side channel/swale complexes.
Account Type(s):
Expense
Contract Start Date:
05/01/2016
Contract End Date:
12/31/2017
Current Contract Value:
$1,115,074
Expenditures:
$1,115,074

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mason Bailie Grande Ronde Model Watershed Foundation No Interested Party mason@grmw.org (541) 663-0570
Aaron Bliesner Union County Soil and Water Conservation District (SWCD) Yes Technical Contact abliesner@unionswcd.org (541) 963-1313
Mary Estes Grande Ronde Model Watershed Foundation No Interested Party mary@grmw.org (541) 663-0570
Daniel Gambetta Bonneville Power Administration No Interested Party dagambetta@bpa.gov (503) 230-3493
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Rachel Kulak Bonneville Power Administration Yes Contracting Officer rakulak@bpa.gov (503) 230-5091
Lacey Moore Grande Ronde Model Watershed Foundation No Interested Party lacey@grmw.org (541) 663-0570
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration No Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation Yes Interested Party alex@grmw.org (541) 663-0570
Jim Webster Union County Soil and Water Conservation District (SWCD) Yes Contract Manager jwebster@unionswcd.org (541) 963-1313
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation A: 165. Environmental Compliance 09/30/2017 09/30/2017
Salvage, trap and haul fish from construction zones B: 28. Salvage and Transport fish from CC44 Construction Project 08/15/2016 08/15/2016
Install Large Wood Structures & Boulder Complexes on Shoemaker Property C: 29. Install Large Wood Structures & Boulder Complexes - Parcel I (Shoemaker) 08/15/2016 08/15/2016
Install LWM Structures & Boulder Complexes D: 29. Install Large Wood Structures & Boulder Complexes - Parcel II (Kinsley) 08/15/2016 08/15/2016
Install Large Wood Structures & Boulders E: 29. Install Large Wood Structures & Boulders - Parcel III (Southern Cross) 08/15/2016 08/15/2016
Completed channel construction F: 30. Construct Side Channel - Parcel II (Kinsley) 08/15/2016 08/15/2016
Connect Main Channel, Construct Side Channels/Swales G: 30. Connect Main Channel, Construct Side Channels/Swales - Parcel III (Southern Cross) 08/15/2016 08/15/2016
Connect/Create Wetland Habitat H: 181. Create/Connect Wetland Complexes 08/15/2016 08/15/2016
Install Riparian Easement Fence I: 40. Install Riparian Easement Fence 12/31/2016 12/31/2016
Plant native species of trees and shrubs in riparian zone, seed and mulch disturbed areas J: 47. Conduct Post-Project Planting and Seeding 01/31/2017 01/31/2017
Construction Management and Contract oversight K: 100. Provide Construction Oversight and Management 12/31/2016 12/31/2016
Project/Contract Administration L: 119. Project and Contraction Administration 12/31/2017 12/31/2017
Catherine Creek 44 Phase IV Completion Report M: 132. Project Completion Report - August 2013 - December 2017 12/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 05/01/2016
B 28 Salvage and Transport fish from CC44 Construction Project 06/23/2016
C 29 Install Large Wood Structures & Boulder Complexes - Parcel I (Shoemaker) 06/23/2016
D 29 Install Large Wood Structures & Boulder Complexes - Parcel II (Kinsley) 06/23/2016
E 29 Install Large Wood Structures & Boulders - Parcel III (Southern Cross) 06/23/2016
F 30 Construct Side Channel - Parcel II (Kinsley) 06/23/2016
G 30 Connect Main Channel, Construct Side Channels/Swales - Parcel III (Southern Cross) 06/23/2016
H 181 Create/Connect Wetland Complexes 06/23/2016
I 40 Install Riparian Easement Fence 06/23/2016
J 47 Conduct Post-Project Planting and Seeding 06/23/2016
K 100 Provide Construction Oversight and Management 05/01/2016
L 119 Project and Contraction Administration 05/01/2016
M 132 Project Completion Report - August 2013 - December 2017 05/01/2016
N 185 Periodic Status Reports for BPA 05/01/2016