Contract 73255: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Project Number:
Title:
Restore Salmon Creek Anadromous Fish
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
73255
Contract Title:
1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Continuation:
Previous: Next:
69697: 1996-042-00 EXP RESTORE SALMON CREEK ANADROMOUS FISH
  • 73548 REL 14: 1996-042-00 EXP RESTORE SALMON CR ANADROMOUS FISH
Contract Status:
Closed
Contract Description:
Since 1910, water from Salmon Creek has been stored in Conconully Reservoir, which is delivered to agricultural fields within the Okanogan Irrigation District, via ~ 12 miles of Salmon Creek.  In addition,  the North Fork of Salmon Creek is diverted into Salmon Lake, an off-channel storage reservoir, via a feeder canal.  Water is then released from Salmon Lake to augment storage of Conconully Reservoir.   Both reservoirs are near the town of Conconully, about 17 miles northwest of Okanogan. Two pumping plants supplement the water supply during water-short years.  Shell Rock Pump Station lifts water from the Okanogan River, and Duck Lake Pumping Plant withdraws water from Duck Lake.

Salmon Creek, a tributary to the Okanogan River, is considered to be one of the most significant opportunities to restore summer steelhead in the Okanogan Basin.  This project reconnects the Okanogan River with approximately 11 miles of habitat conducive for spawning and rearing of summer steelhead.  During controlled water releases in 2003, approximately 25 cfs was required for fish migration downstream of the diversion dam.  During 2008 a "low-flow" channel was constructed downstream of the diversion dam which provided suitable fish passage conditions at approximately 10 cfs.  The low flow channel extended the duration of water available through a 12-year water lease program.  During 2011, uncontrolled spill exceeded 500 cfs resulting in an undistinguishable low flow channel.  The low flow channel was re-established after the irrigation season of 2012.  This included re-shaping the outlet of Salmon Creek as well as fortifying the stream bank in two reaches, one of which where a structure was in jeopardy of falling into the channel.  

Evaluation of the migration conditions and the stability of the low-flow channel will continue during the extent of the current water lease (2017).  Minor modifications of the low-flow channel are expected during normal run-off years.
Account Type(s):
Expense
Contract Start Date:
08/01/2016
Contract End Date:
07/31/2017
Current Contract Value:
$112,801
Expenditures:
$112,801

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Roy Beaty Bonneville Power Administration Yes F&W Approver rebeaty@bpa.gov (503) 230-5213
Joseph Connor Bonneville Power Administration Yes COR jwconnor@bpa.gov (503) 230-3172
Chris Fisher Colville Confederated Tribes Yes Technical Contact chris.fisher@colvilletribes.com (509) 422-7427
Randy Friedlander Colville Confederated Tribes No Administrative Contact randall.friedlander@colvilletribes.com (509) 634-2110
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Billy Gunn Colville Confederated Tribes Yes Contract Manager billy.gunn@colvilletribes.com (509) 422-7740
Keith Kistler Colville Confederated Tribes Yes Technical Contact keith.kistler@colvilletribes.com (509) 422-7429
Peter Lofy Bonneville Power Administration No Interested Party ptlofy@bpa.gov (503) 230-4193
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Kary Nichols Colville Confederated Tribes No Administrative Contact kary.nichols@colvilletribes.com (509) 422-4782
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
John Stensgar, Jr Colville Confederated Tribes Yes Administrative Contact lj.stensgar.fnw@colvilletribes.com (509) 634-2109
Kirk Truscott Colville Confederated Tribes No Supervisor kirk.truscott@colvilletribes.com (509) 978-8031
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Requirements Complete B: 165. Environmental Compliance Requirements 07/31/2017 06/23/2017
All administrative tasks fulfilled with timely quality products C: 119. Fulfill all administrative tasks with quality products in a timely manner 07/31/2017 06/23/2017
Coordinate annual activities with landowners, local govts., irrigation district, WDFW and UCR D: 191. Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 06/30/2017 06/30/2017
Evaluation of fish passage conditions during controlled releases. E: 186. Evaluate fish passage conditions during controlled releases 07/14/2017 06/30/2017
Develop a design to reduce sediment delivery and reestablish riparian corridor F: 175. Develop design to abate sediment and reduce risk of stream channel avulsion at private crossin 03/31/2017
Complete design for construction of a diversion dam on the North Fork of Salmon Creek G: 175. Design and oversee construction of the irrigation diversion on the N.F. Salmon Creek 12/01/2016
Construct a diversion dam on North Fork of Salmon Creek H: 84. Install diversion on N. F. Salmon Creek 11/15/2016
Completed 2014 Annual Report I: 132. Placeholder:Submit Progress Report for the period 8/1/2014 to 7/31/2015 09/30/2016 09/30/2016
Completed Annual Report J: 132. Submit Progress(Annual) Report for the period 8/1/2015 to 7/31/2016 05/31/2017 05/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 84 Remove/Install Diversion
  • 2 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 08/01/2016
B 165 Environmental Compliance Requirements 08/01/2016
C 119 Fulfill all administrative tasks with quality products in a timely manner 08/01/2016
D 191 Coordinate annual activities with landowners, local govts., OID, WDFW, and UCRSRB 08/01/2016
E 186 Evaluate fish passage conditions during controlled releases 08/01/2016
F 175 Develop design to abate sediment and reduce risk of stream channel avulsion at private crossin 08/01/2016
G 175 Design and oversee construction of the irrigation diversion on the N.F. Salmon Creek 08/01/2016
H 84 Install diversion on N. F. Salmon Creek
I 132 Placeholder:Submit Progress Report for the period 8/1/2014 to 7/31/2015 08/01/2016
J 132 Submit Progress(Annual) Report for the period 8/1/2015 to 7/31/2016 08/01/2016