| 73139: 2007-224-00 EXP CCT METHOW RESTORATION |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance Documentation | A: 165. Produce Compliance Documentation | 06/30/2018 | 06/30/2018 | |
| Methow Restoration Project Management | B: 119. Project Management | 06/30/2018 | 06/30/2018 | |
| Watershed coordination | C: 191. Methow Subbasin Coordination | 06/30/2018 | 06/30/2018 | |
| Projects selected for implementation | D: 114. Project Identification and Selection Process | 02/28/2018 | 02/28/2018 | |
| Large wood instream structure | F: 29. Devany Aquatic Complexity | 06/30/2018 | ||
| Side Channel Re-connection | G: 30. Devany Side Channel | 06/30/2018 | ||
| Silver Reach Instream Structures | H: 29. Silver Reach Instream Enhancements Phase 2 | 06/30/2018 | ||
| Irrigation Well | I: 82. Runyan Irrigation Well | 06/30/2018 | 06/11/2018 | |
| Beaver Dam Analogs | J: 29. Mission Beaver Dam Analogs | 06/30/2018 | ||
| Beavers relocated to the Methow basin. | K: 190. Beaver Relocation Project | 06/30/2018 | 06/30/2018 | |
| Livestock Exclusion Fencing | L: 40. Mission Livestock Exclusion | 06/30/2018 | ||
| Barkley Irrigation System Upgrade | M: 203. Barkley Irrigation System Improvements | 06/30/2018 | 06/30/2018 | |
| Progress Report for the period 7/1/16 - 6/30/17 | N: 132. Submit Progress Report for the period 7/1/16 to 6/30/17 | 06/30/2018 | ||
| Hydrogeologic Memo | O: 141. Fort Production Well Phase 1 | 06/30/2018 | ||
| Outreach and Education in the Methow Valley | P: 99. Methow Valley Public Outreach | 06/30/2018 | 06/30/2018 | |
| Acquisition Appraisal | Q: 172. Acquisition Appraisal | 06/30/2018 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
| Coho (O. kisutch) - Unspecified Population |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Produce Compliance Documentation | 07/01/2017 | ||||||
| B | 119 | Project Management | 07/01/2017 | ||||||
| C | 191 | Methow Subbasin Coordination | 07/01/2017 | ||||||
| D | 114 | Project Identification and Selection Process | 07/01/2017 | ||||||
| E | 185 | Periodic Status Reports for BPA | 07/01/2017 | ||||||
| F | 29 | Devany Aquatic Complexity | |||||||
| G | 30 | Devany Side Channel | |||||||
| H | 29 | Silver Reach Instream Enhancements Phase 2 | |||||||
| I | 82 | Runyan Irrigation Well | 01/05/2018 | ||||||
| J | 29 | Mission Beaver Dam Analogs | 09/28/2017 | ||||||
| K | 190 | Beaver Relocation Project | 01/05/2018 | ||||||
| L | 40 | Mission Livestock Exclusion | 10/31/2017 | ||||||
| M | 203 | Barkley Irrigation System Improvements | 07/01/2017 | ||||||
| N | 132 | Submit Progress Report for the period 7/1/16 to 6/30/17 | 07/01/2017 | ||||||
| O | 141 | Fort Production Well Phase 1 | 07/01/2017 | ||||||
| P | 99 | Methow Valley Public Outreach | 07/01/2017 | ||||||
| Q | 172 | Acquisition Appraisal | 07/01/2017 |