Ensure environmental compliance requirements are complete |
A: 165. Deschutes, Fifteenmile, Hood - Complete Environmental Compliance Requirements |
|
09/30/2017 |
09/28/2017 |
DR: Collect water temperature data |
B: 157. Deschutes River (DR): 2016-2017 Record tributary water temperatures for lamprey life-history |
|
09/30/2017 |
09/28/2017 |
Manage and summarize water temperature data (2016-2017) to characterize lamprey habitats |
C: 162. DR: Manage and summarize water temperature data (2016-2017) to characterize lamprey habitats |
|
09/30/2017 |
09/28/2017 |
Tag adult lamprey at Sherars Falls |
D: 158. DR: 2017 Tag lamprey to estimate abundance at Sherars Falls |
|
09/30/2017 |
09/28/2017 |
Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2017 |
E: 157. DR: Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2017 |
|
09/30/2017 |
09/28/2017 |
Estimate adult lamprey escapement for 2016 |
F: 162. DR: 2016 Estimate Pacific lamprey escapement upstream of Sherars Falls |
|
09/30/2017 |
09/28/2017 |
Re-Install antenna arrays in Warm Springs River and Shitike Creek |
G: 70. UPDATE DR: Re-Install dual reader antenna arrays in Reservation streams |
|
09/30/2017 |
09/28/2017 |
Operate HDX arrays in Warm Springs River and Shitike Creek |
H: 157. UPDATE LOCATIONS DR: Collect data from HDX sites on CTWSRO reservation |
|
09/30/2017 |
09/28/2017 |
Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
I: 156. DR: Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
|
09/30/2017 |
09/28/2017 |
Effective population size (Ne) and age at migration of larval lamprey in Warm Springs River |
J: 156. DR: Study feasibility of Ne and age of migration of larval lamprey in Warm Springs River |
|
09/30/2017 |
09/28/2017 |
Record, store, summarize water temperature data collected in 2016-17 for limiting factors anal |
K: 162. Fifteenmile (FM): Manage and summarize water temperature data (2016-2017) |
|
09/30/2017 |
09/28/2017 |
Conduct mark-recapture and creel surveys to estimate escapement upstream of Cushing Falls |
L: 157. FM: 2017 Field activities to estimate Pacific lamprey escapement estimate upstream of Cushing |
|
09/30/2017 |
09/28/2017 |
Fifteenmile Creek adult Pacific lamprey escapement estimate for summer 2016 |
M: 162. FM: 2016 Calculate lamprey escapement upstream of Cushing Falls |
|
09/30/2017 |
03/30/2017 |
Tag lamprey |
N: 158. FM: Tag lamprey at Cushing Falls for escapement estimates |
|
09/30/2017 |
09/28/2017 |
Tag lamprey at Bonneville Dam |
O: 158. Bonneville Dam: PIT tag lamprey for escapement estimates in Fifteenmile Creek |
|
09/30/2017 |
09/28/2017 |
Effective population size (Ne) and age at migration of larval lamprey in Warm Springs River |
P: 156. FM: Study feasibility of Ne and age of migration of larval lamprey in Fifteenmile Creek |
|
09/30/2017 |
09/28/2017 |
Operation of HDX PIT Tag Arrays In Fifteenmile Creek Subbasin |
R: 157. FM: Record PIT tagged lamprey in Fifteenmile Creeek |
|
09/30/2017 |
09/28/2017 |
Install, operate, maintain and collect data from HDX arrays in the Hood River Subbasin |
S: 157. Hood River (HR): Collect data from half-duplex site in Hood River |
|
09/30/2017 |
09/28/2017 |
Determine current end of distribution for Pacific lamprey within the Hood River Subbasin |
T: 157. HR: Document presence/absence and end of distribution of lamprey in Hood River Subbasin |
|
09/30/2017 |
09/28/2017 |
Analyze distribution & density data in the Deschutes, Fifteenmile, and Hood subbasins |
U: 162. DR, FM, & HR: Analyze 2016 larval lamprey surveys (end of distribution and densities) |
|
09/30/2017 |
09/28/2017 |
Enter HDX Tag information into CTWSRO database |
V: 159. DR, FM, & HR: Enter HDX PIT tag information into CTWSRO database |
|
09/30/2017 |
09/28/2017 |
Lamprey migration timing and movement patterns in Deschutes, Fifteenmile and Hood subbasins |
W: 162. DR, FM & HR: Summarize data collected from HDX Arrays |
|
09/30/2017 |
09/28/2017 |
Participate in regional lamprey research and recovery forums |
X: 189. DR, FM, & HR: Participate in regional planning and recovery actions for Pacific lamprey |
|
09/30/2017 |
09/28/2017 |
All administrative tasks fulfilled with timely quality products |
Y: 119. Manage Project |
|
09/30/2017 |
09/28/2017 |
Completed CY2016 Annual Report |
Z: 132. Submit Progress Report for the period 1/1/2016 to 12/31/2016 |
|
09/30/2017 |
09/28/2017 |