Contract 73982 REL 101: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2020
Project Number:
Title:
CTUIR Grand Ronde Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
73982 REL 101
Contract Title:
1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2020
Contract Continuation:
Previous: Next:
73982 REL 75: 1996-083-00 EXP BIOP CTUIR GRANDE RONDE SUBBASIN RESTORATION 2019
  • 73982 REL 135: 1996-083-00 EXP CTUIR GRAND RONDE SUBBASIN RESTORATION 2021
Contract Status:
Closed
Contract Description:
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) Grande Ronde Subbasin Restoration Project (199608300) was initiated in 1996 to develop and implement a fish habitat program that contributes to the mitigation of Snake River Basin salmon and steelhead losses associated with the Federal Columbia River Hydropower System (FCRPS) and recovery of ESA anadromous fish. The project works collaboratively with multiple agencies, organizations, and private landowners to identify, prioritize, plan, design, implement, maintain, and monitor tributary fish habitat restoration and enhancement projects. The Project embraces the goals of the CTUIR established in its’ Columbia Basin Salmon Policy (CTUIR, 1995) River Vision (Jones, et. al., 2008), Wykan-Ush-Me Wa Kush, Spirit of the Salmon (CRITFC, 1995), and is tiered to the Northwest Power Planning Council Fish and Wildlife Program as amended(NPPC, 2009), Grande Ronde Subbasin Plan (NPPC, 2004), Draft Recovery Plan For Oregon Spring/Summer Chinook Salmon And Steelhead Populations In The Snake River Chinook Salmon Evolutionary Significant Unit And Snake River Steelhead Distinct Population Segment (NMFS, 2010), and the Federal Columbia River Power System Biological Opinion (FCRPS BiOP), (NMFS, 2008).

The CTUIR propose ongoing fish habitat protection, enhancement, maintenance, and monitoring under the CTUIR-BPA Accord to protect, restore and enhancement watershed and habitat conditions for focal species. Project staff participate in basin project planning and prioritization and collaboration through the Grande Ronde Model Watershed on the technical implementation team and the project leader is a GRMW Board Member.

In FY 2020, the project will be focused on construction of the Longley Meadow Project along the Grande Ronde River and planning/design on additional phases of the Middle Upper Grande Ronde River.  Additionally, CTUIR is planning on initiating planning/design on the Catherine Creek Rivermile 42 fish collection facility to evaluate passage and infrastructure, development of project prospectus' for future projects, including Lookingglass Conservation Property and McCoy Meadows, and participate on planning teams for Hall Ranch and Buffalo Flats projects.
Project staff will continue to work on development of new land acquisition opportunities to protect important habitat.
Account Type(s):
Expense
Contract Start Date:
05/01/2020
Contract End Date:
04/30/2021
Current Contract Value:
$823,579
Expenditures:
$823,579

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Receipt of environmental compliance clearance from BPA. A: 165. Complete/initiate Environmental Permitting for Project Activities 04/30/2021 04/30/2021
Complete cultural resource investigations on Rock Creek. B: 165. Complete/initiate Section 106 Process for Rock Creek Water Developments, Fences, and Planting 04/30/2021
Develop Project Design Drawings and Specifications C: 174. Develop project designs and produce plans (Middle Upper Grande Ronde Phases 2 and 3) 04/30/2021 04/30/2021
Effective implementation management and timely contract administration D: 119. Middle Upper Grande Ronde River Fish Habitat Enhancement Project Administration 04/30/2021
Develop Project Design Drawings and Specifications E: 174. Develop project designs and produce plans (Longley Meadows) 04/30/2021 08/03/2020
Effective implementation management and timely contract administration F: 119. Longley Meadows Fish Habitat Enhancement Project Administration 04/30/2021 04/30/2021
Conduct Fish Salvage Operations G: 28. Conduct Fish Salvage Operations (Longley Meadows) 10/15/2020 10/30/2020
Maintain vegetation and control weeds on conservation projects H: 198. Maintain Vegetation and Control Weeds on conservation projects 04/30/2021 04/30/2021
Completed Corral System I: 40. Construct Livestock Corral (Relocated from Floodplain) 11/20/2020 11/20/2020
Conduct maintenance on McCoy, Dark Canyon, Meadow, Willow, Rock, Catherine Creek, and Grande Ronde River Projects J: 186. Maintain instream structures, fences, and off-channel water developments 04/30/2021 04/30/2021
Conduct ongoing project development and coordination activities K: 114. CTUIR Grande Ronde Subbasin Restoration Projects Coordination 04/30/2021 04/30/2021
BiOp Fish Habitat Project Opportunity Development and Review L: 114. Solicit, review &select BiOp expense & capital projects - Implementation Team & Technical Input 04/30/2021 04/30/2021
Administer Project M: 119. Manage and Administer CTUIR GR Subbasin Restoration Project 04/30/2021 04/30/2021
Complete outreach & education activities N: 99. Public Outreach and Education 04/30/2021 04/30/2021
Pre-project and post evaluations O: 186. Pre & post project evaluations 04/30/2021 04/30/2021
Upload Completion Report P: 141. Habitat Completion Reports 04/30/2021 05/29/2020
Upload 2020 Annual Report Q: 132. 2020 Annual Report - May 2020 - April 2021 04/30/2021 04/30/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 28 Trap and Haul
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 198 Maintain Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 28 Trap and Haul
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 2 instances of WE 114 Identify and Select Projects
  • 2 instances of WE 174 Produce Plan

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete/initiate Environmental Permitting for Project Activities
B 165 Complete/initiate Section 106 Process for Rock Creek Water Developments, Fences, and Planting
C 174 Develop project designs and produce plans (Middle Upper Grande Ronde Phases 2 and 3)
D 119 Middle Upper Grande Ronde River Fish Habitat Enhancement Project Administration
E 174 Develop project designs and produce plans (Longley Meadows) 02/19/2020
F 119 Longley Meadows Fish Habitat Enhancement Project Administration
G 28 Conduct Fish Salvage Operations (Longley Meadows) 02/19/2020
H 198 Maintain Vegetation and Control Weeds on conservation projects 03/09/2021
I 40 Construct Livestock Corral (Relocated from Floodplain) 03/09/2021
J 186 Maintain instream structures, fences, and off-channel water developments 03/09/2021
K 114 CTUIR Grande Ronde Subbasin Restoration Projects Coordination
L 114 Solicit, review &select BiOp expense & capital projects - Implementation Team & Technical Input
M 119 Manage and Administer CTUIR GR Subbasin Restoration Project
N 99 Public Outreach and Education
O 186 Pre & post project evaluations 02/19/2020
P 141 Habitat Completion Reports
Q 132 2020 Annual Report - May 2020 - April 2021
R 185 Quarterly Status Reports