Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 73982 REL 202: 2000-038-02 EXP IMTWAHA HATCHERY O&M
Project Number:
Title:
Imtwaha Hatchery Operations and Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
73982 REL 202
Contract Title:
2000-038-02 EXP IMTWAHA HATCHERY O&M
Contract Continuation:
Previous: Next:
73982 REL 175: 2000-038-02 EXP WALLA WALLA RIVER HATCHERY O&M
Contract Status:
Issued
Contract Description:
Imtwaha Fish Hatchery Operations and Maintenance (formally Walla Walla Hatchery)
FY 2024

Performance/Budget Period: January 1, 2024 - December 31, 2024

Background:

Walla Walla Hatchery underwent a name change in October of 2023. The new name is Imtwaha Fish Hatchery. This name holds cultural and historical significance to the Cayuse, Umatilla and Walla Walla. It is a Cayuse and Nez Perce place name of the location of the hatchery facility on the South Fork Walla Walla River. The meaning of Imtwaha is: “This river provided fishing for salmon and lamprey used by Cayuse and Walla Walla people. Spears and dip nets were used (Hunn, 2015).”

The purpose and goal of operations at Imtwaha Hatchery is to release 500,000 Spring Chinook smolts annually with all phases of production including: adult holding, incubation, early rearing, final grow-out and release (on site and off). Fish are produced to help restore spring Chinook to the Walla Walla River basin after their extirpation in the early 1900s. The project is part of the Northwest Power and Conservation Council (NPCC)s Fish &Wildlife program, and is a component of the Fish Accord between BPA and CTUIR.

The property is located approximately 9 miles southeast of Milton-Freewater. The facility is bordered by the South Fork Walla Walla River Road on the northeast and by the South Fork Walla Walla River on the southwest. The site is approximately 12 acres and contains the existing adult holding, spawning building, intake, pump building, shop building, generator building, pollution abatement pond and an outfall. The hatchery includes 16 vertical incubation stacks, 16 early rearing tanks, 10 grow-out tanks, a research room, feed storage room, an isolated chemical storage room, offices and administrative facilities, a conference room and a visitors center.    
Account Type(s):
Expense
Contract Start Date:
01/01/2024
Contract End Date:
12/31/2024
Current Contract Value:
$1,373,706
Expenditures:
$298,075

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Produce all Required Environmental Compliance Documentation B: 165. Assurance of Environmental Compliance 12/31/2024
Release BY22 juveniles C: 176. Spring Chinook Production BY22 (final rearing and release) 04/30/2024
Spring Chinook Production BY23 (rearing) D: 176. Spring Chinook Production BY23 (rearing) 12/31/2024
Hold BY2024 Broodstock E: 66. Trap, collect, transport and hold BY24 spring Chinook broodstock 09/15/2024
Mass-mark all BY23 spring Chinook juveniles including 150K CWT F: 158. Mass-mark all BY23 spring Chinook juveniles including 150K CWT 07/31/2024
Spring Chinook Production BY24 (spawn/egg incubation G: 176. Spring Chinook Production BY24 (spawn/egg incubation) 12/31/2024
Maintain Fish Health H: 60. Assist in collection of samples from adult and juvenile fish for disease analysis 12/31/2024
Maintain the Imtwaha Hatchery I: 61. Maintain all Imtwaha Hatchery Facilities 12/31/2024
Produce status reports for every month of 2024 J: 141. Other Reports for BPA 12/15/2024
Produce Annual Operation Plan K: 174. Produce an Annual Operation Plan 12/31/2024
Effective implementation management and timely contract administration L: 119. Manage and Administer Projects 12/31/2024
Completed Annual Report M: 132. Submit Progress Report for the period (1 Jan 2023) to (31 Dec 2023) 03/29/2024 03/29/2024

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 3 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Assurance of Environmental Compliance
C 176 Spring Chinook Production BY22 (final rearing and release) 11/20/2023
D 176 Spring Chinook Production BY23 (rearing) 11/20/2023
E 66 Trap, collect, transport and hold BY24 spring Chinook broodstock 11/20/2023
F 158 Mass-mark all BY23 spring Chinook juveniles including 150K CWT 11/20/2023
G 176 Spring Chinook Production BY24 (spawn/egg incubation) 11/20/2023
H 60 Assist in collection of samples from adult and juvenile fish for disease analysis 11/20/2023
I 61 Maintain all Imtwaha Hatchery Facilities 11/20/2023
J 141 Other Reports for BPA
K 174 Produce an Annual Operation Plan 11/20/2023
L 119 Manage and Administer Projects
M 132 Submit Progress Report for the period (1 Jan 2023) to (31 Dec 2023)