| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | John Day | 100.00% |
| Previous: | Next: |
|---|---|
| 74313 REL 68: 1993-066-00 EXP OREGON FISH SCREENS PROJECTS |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | A: 119. Routine Administration of BPA Contract | 12/31/2021 | 12/15/2021 | |
| Complete Environmental Clearance Documentation or Prepare Biological Assessment | B: 165. Complete Environmental Clearance Documentation | 12/31/2021 | 12/16/2021 | |
| New projects identified for future funding and added to prioritized list of potential projects. | C: 114. Identify and prioritize new projects for future funding. | 12/31/2021 | 12/15/2021 | |
| Designs and specifications for planned projects. | D: 175. Produce designs for specific projects. | 12/31/2021 | 12/15/2021 | |
| Culvert Removed and replaced with a culvert arch on Tinker Creek. | G: 184. Replace Culvert on Tinker Creek (Rd 3620) | 12/31/2021 | 08/31/2021 | |
| Existing culverts and roadbed removed on Tinker Creek. | H: 184. Remove Culverts on Tinker Creek | 12/31/2021 | 08/31/2021 | |
| Projects installed. | N: 208. Indian Creek (Winegar) Project | 12/31/2021 | 06/30/2021 | |
| Projects installed. | O: 208. Indian Creek (Holliday) Project | 12/31/2021 | 06/30/2021 | |
| Projects installed. | P: 208. Fox Creek (McGirr) Project | 12/31/2021 | 12/15/2021 | |
| Project installed. | V: 208. John Day River (Ricco) #24 Screen Project | 12/31/2021 | 12/15/2021 | |
| Project installed. | W: 208. John Day River (Ricco) #26 Screen Project | 12/31/2021 | 06/30/2021 | |
| Projects installed. | X: 208. Flat Creek Project | 12/31/2021 | 09/30/2021 | |
| Pump fish screens and water measuring devices installed | AD: 208. Install Pump Fish Screens the Lower Mainstem John Day River Basin (downstream of the North Fork confluence). | 12/31/2021 | 12/16/2021 | |
| Pump fish screens and water measuring devices installed | AE: 208. Install Pump Fish Screens in the North Fork John Day River Drainage. | 12/31/2021 | 12/16/2021 | |
| Pump fish screens and water measuring devices installed | AF: 208. Install Pump Fish Screens in the South Fork of the John Day River Basin. | 12/31/2021 | 12/16/2021 | |
| Pump fish screens and water measuring devices installed | AG: 208. Install Pump Fish Screens in the Upper Mainstem John Day River Basin. | 12/31/2021 | 12/16/2021 | |
| Pump fish screens and water measuring devices installed | AH: 208. Install Pump Fish Screens in the Umatilla River Basin. | 12/31/2021 | 12/16/2021 | |
| Large wood placed on Tinker Creek. | AL: 29. Improve instream habitat on Tinker Creek | 12/31/2021 | 08/31/2021 | |
| Projects Installed (No ground disturbance). | AR: 186. Screen Component Replacement on oldest Screens; Install water control devices (Upper John Day) | 12/31/2021 | 12/16/2021 | |
| Projects installed (no ground disturbance). | AS: 186. Screen Component Replacement on oldest Screens; Install water control devices (Umatilla River) | 12/31/2021 | 12/16/2021 | |
| Completed Annual Report | AU: 132. Submit Progress Report for the period 1/1/2020 - 12/31/2020 | 07/26/2021 | 07/26/2021 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Routine Administration of BPA Contract | |||||||
| B | 165 | Complete Environmental Clearance Documentation | |||||||
| C | 114 | Identify and prioritize new projects for future funding. | |||||||
| D | 175 | Produce designs for specific projects. | |||||||
| E | 184 | Remove Culvert on Junkens Creek and install ATV bridge. | |||||||
| F | 184 | Replace Culvert on Pine Hollow. | |||||||
| G | 184 | Replace Culvert on Tinker Creek (Rd 3620) | 06/28/2021 | ||||||
| H | 184 | Remove Culverts on Tinker Creek | 06/28/2021 | ||||||
| I | 184 | Replace Culvert on East Fork Beech Creek (Rd 3600-052) | |||||||
| J | 208 | Install Fish Exclusion Barriers on the Enterprise Ditch on the John Day River. | |||||||
| K | 208 | Install Fish Exclusion Barriers on the Enterprise Ditch on the John Day River. | |||||||
| L | 208 | Pine Creek (Anderson) Project | |||||||
| M | 208 | Bridge Creek (Middle Fork John Day River) Project | |||||||
| N | 208 | Indian Creek (Winegar) Project | 03/15/2021 | ||||||
| O | 208 | Indian Creek (Holliday) Project | 03/15/2021 | ||||||
| P | 208 | Fox Creek (McGirr) Project | 07/01/2021 | ||||||
| Q | 208 | Wiwaanyatt Creek (Middle Fork John Day River) Project | |||||||
| R | 208 | Wiwaanyatt Creek (Middle Fork John Day River) Project | |||||||
| S | 208 | John Day River (Voigt) #11 Screen Project | |||||||
| T | 208 | John Day River (Voigt) #12 Screen Project | |||||||
| U | 208 | John Day River (Voigt) #15 Screen Project | |||||||
| V | 208 | John Day River (Ricco) #24 Screen Project | 03/15/2021 | ||||||
| W | 208 | John Day River (Ricco) #26 Screen Project | 03/15/2021 | ||||||
| X | 208 | Flat Creek Project | 03/15/2021 | ||||||
| Y | 208 | Bear Creek Project | |||||||
| Z | 208 | Johnson Creek Project | |||||||
| AA | 208 | Beech Creek Project | |||||||
| AB | 208 | John Day River #59 Headgate Project | |||||||
| AC | 208 | Install Pump Fish Screens in the Middle Fork of the John Day River Basin. | 03/20/2020 | ||||||
| AD | 208 | Install Pump Fish Screens the Lower Mainstem John Day River Basin (downstream of the North Fork confluence). | 02/10/2021 | ||||||
| AE | 208 | Install Pump Fish Screens in the North Fork John Day River Drainage. | 03/20/2020 | ||||||
| AF | 208 | Install Pump Fish Screens in the South Fork of the John Day River Basin. | 02/10/2021 | ||||||
| AG | 208 | Install Pump Fish Screens in the Upper Mainstem John Day River Basin. | 02/10/2021 | ||||||
| AH | 208 | Install Pump Fish Screens in the Umatilla River Basin. | 03/20/2020 | ||||||
| AI | 29 | Improve instream habitat on Junkens Creek | |||||||
| AJ | 29 | Improve instream habitat in Pine Hollow | |||||||
| AK | 29 | Improve instream habitat on Murderers Creek | |||||||
| AL | 29 | Improve instream habitat on Tinker Creek | 06/28/2021 | ||||||
| AM | 29 | Improve instream habitat on East Fork Beech Creek | |||||||
| AN | 186 | Screen Component Replacement on oldest Screens; Install water control devices (Lower John Day) | 02/10/2021 | ||||||
| AO | 186 | Screen Component Replacement on oldest Screens; Install water control devices (South Fork John Day) | 02/10/2021 | ||||||
| AP | 186 | Screen Component Replacement on oldest Screens; Install water control devices (Middle Fork John Day) | 02/10/2021 | ||||||
| AQ | 186 | Screen Component Replacement on oldest Screens; Install water control devices (North Fork John Day) | 02/10/2021 | ||||||
| AR | 186 | Screen Component Replacement on oldest Screens; Install water control devices (Upper John Day) | 02/10/2021 | ||||||
| AS | 186 | Screen Component Replacement on oldest Screens; Install water control devices (Umatilla River) | 02/10/2021 | ||||||
| AT | 185 | Periodic Status Reports for BPA | |||||||
| AU | 132 | Submit Progress Report for the period 1/1/2020 - 12/31/2020 |