Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75011: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Project Number:
Title:
Protect and Restore the Crooked and American River Watersheds
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
75011
Contract Title:
2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
70571: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
  • 74017 REL 9: 2010-086-00 EXP CROOKED/AMERICAN RIVER WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:

This project was originally proposed during the 2007 NPCC/BPA Provincial Review.  Although it did not receive funding during that process, it was recommended for funding as an FCRPS BiOp project.  This comprehensive watershed restoration effort focuses on mitigating and restoring limiting factors to fisheries production.  The primary limiting factors are excessive sedimentation in the spawning and rearing areas of streams, and the lack of available habitat and habitat connectivity.  These limiting factors are the result of past land management activities, including road construction, logging, and mining.  

The Nez Perce-Clearwater National Forest (NPCNF) has completed several surveys, assessments, and NEPA decision documents.  The first assessment, the South Fork Landscape Assessment, was completed in 1999.  This document provided the baseline conditions for each subwatershed as well as general recommendations for future restoration efforts.  The Crooked/American Environmental Impact Statement (EIS) evaluated a complex system of watersheds using a multidisciplinary approach.  The final product included a proposed list of specific watershed restoration projects, including the Crooked/American Watershed Restoration project.

This project is a part of the BPA, NPCNF, and Nez Perce Tribe (NPT) Watershed Restoration Partnership.  Since the NPT program’s inception, we have shared project planning and development, costs, and implementation responsibilities.  


Summary of FY 2017 Contract Implementation:
                                                                                                                                                                                                                                              
FY 2017 contract implementation will include the construction of the second phase of a temporary bypass channel, mine tailings pile removal from the floodplain, stream channel reconstruction, floodplain restoration, and large wood installation under Phase I of the Crooked River Rehabilitation Project.  Periodic reports will be provided to BPA on the status of the contract and an annual report on accomplishments will be completed.
Account Type(s):
Expense
Contract Start Date:
02/01/2017
Contract End Date:
01/31/2018
Current Contract Value:
$692,532
Expenditures:
$692,532

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Jenifer Harris Nez Perce Tribe Yes Contract Manager jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Emmit Taylor, Jr. Nez Perce Tribe No Interested Party emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental Compliance Documentation Submitted to BPA A: 165. Submit Environmental Compliance Documentation to BPA 11/30/2017 12/29/2017
Temporary Bypass Channel B: 84. Crooked River Valley Rehabilitation - Bypass Channel 11/30/2017 09/29/2017
Remove or re-grade approximately 20,000 cubic yards of tailings piles C: 52. Crooked River Valley Rehabilitation - Remove Mine Tailings 10/27/2017 08/31/2017
Floodplain Restoration D: 180. Crooked River Valley Rehabilitation - Floodplain Restoration 11/30/2017 08/31/2017
10 Large Wood Structures E: 29. Crooked River Valley Rehabilitation - Install Large Wood Structures 08/18/2017 08/31/2017
Riparian Vegetation along Elk Creek F: 47. Plant Riparian Vegetation on Elk Creek 10/27/2017 09/27/2017
FY 2018 SOW package and FY 2017 accrual estimate G: 119. Management, Coordination, and Communication 01/31/2018 12/29/2017
Final FY 2017 annual report attached to this contract H: 132. Submit Annual Report for 2/1/2017 - 1/31/18 01/31/2018 12/29/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 52 Remove Mine Tailings
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 84 Remove/Install Diversion

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Submit Environmental Compliance Documentation to BPA 12/01/2016
B 84 Crooked River Valley Rehabilitation - Bypass Channel 02/01/2017
C 52 Crooked River Valley Rehabilitation - Remove Mine Tailings 02/01/2017
D 180 Crooked River Valley Rehabilitation - Floodplain Restoration 02/01/2017
E 29 Crooked River Valley Rehabilitation - Install Large Wood Structures 02/01/2017
F 47 Plant Riparian Vegetation on Elk Creek 04/27/2017
G 119 Management, Coordination, and Communication 12/01/2016
H 132 Submit Annual Report for 2/1/2017 - 1/31/18 12/01/2016
I 185 Periodic Status Reports for BPA 12/01/2016