| Grande Ronde Fish Habitat Program Project Management |
A: 119. Manage and Administer GRFH Program and Projects |
|
05/31/2018 |
02/28/2018 |
| Local, state and federal permits |
B: 165. Environmental Compliance for Construction Activities |
|
05/31/2018 |
02/28/2018 |
| Conduct Fish Salvage on Wallowa River-Baker and Hall Ranch Projects |
C: 28. Conduct Fish Salvage on Wallowa River-Baker and Hall Ranch Projects |
|
08/15/2017 |
08/15/2017 |
| Native Upland Grass Seeding on Wallowa River-Baker Project |
E: 47. Seed Wallowa River-Baker Project with Native Upland Grass Seed Mix |
|
12/31/2017 |
11/30/2017 |
| Plant Riparian Vegetation on Wallowa River-Baker Project |
F: 47. Plant Riparian Vegetation on Wallowa River-Baker Project |
|
12/31/2017 |
11/30/2017 |
| Native Vegetation Maintenance on Projects with ODFW Easements |
G: 198. Maintain Vegetation on Projects with ODFW Easements |
|
05/31/2018 |
02/28/2018 |
| Maintain Riparian Habitat Projects With ODFW Easements |
H: 186. Maintain Projects With ODFW Easements |
|
05/31/2018 |
02/28/2018 |
| Inspect Current ODFW Grande Ronde Fish Habitat Projects with Easements for Livestock Trespass |
I: 26. Monitor Current Projects with ODFW Easements for Livestock Trespass |
|
05/31/2018 |
02/28/2018 |
| Stream Channel and Instream Structure Maintenance |
J: 186. Maintain Reconstructed Stream Channels and Instream Structures |
|
05/31/2018 |
02/28/2018 |
| Collect Stream Temperatures at Representative Restoration Projects |
K: 186. Collect and Analyze Stream Temperatures at Represenative Restoration Projects |
|
05/31/2018 |
02/28/2018 |
| Documentation of Project Changes Using Photo Points |
L: 186. Document Representative Restoration Project Changes Using Photo Points |
|
05/31/2018 |
02/28/2018 |
| Participation in BPA Atlas Process for Catherine Creek and the Upper Grande Ronde |
M: 122. Participation in BPA Catherine Creek and Upper Grande Ronde Atlas Process |
|
05/31/2018 |
02/28/2018 |
| Participation in Atlas Development for Wallowa, Joseph Creek, and Imnaha |
N: 122. Participate in Wallowa, Joseph Creek, and Imnaha Atlas Development |
|
05/31/2018 |
02/28/2018 |
| Identify and Assess Potential Projects in the Grande Ronde Basin |
O: 114. Identify and Assess Potential Projects in the Grande Ronde Basin |
|
05/31/2018 |
02/28/2018 |
| Watershed Coordination |
P: 191. Coordinate Project Activities with Regional Partners |
|
05/31/2018 |
02/28/2018 |
| Off-Site Water Systems on Crow Creek-Krebs Project |
Q: 34. Install Off-Site Water Systems on Crow Creek-Krebs Project |
|
05/31/2018 |
|
| Regrading of exposed, vertical banks on West Fork Pine Creek. |
R: 55. Improve Floodplain Connectivity on Crow Creek-Krebs Project |
|
05/31/2018 |
|
| Riparian Vegetation Planting on Crow Creek-Krebs Project |
S: 47. Plant Riparian Vegetation on Crow Creek-Krebs Project |
|
02/28/2018 |
|
| Hall Ranch Habitat Improvement Project Design |
T: 175. Develop Detailed Designs for Hall Ranch Habitat Improvement Project |
|
04/30/2017 |
04/30/2017 |
| Detailed Designs for the Upper Grande Ronde-Bowman Project |
U: 175. Develop Detailed Designs for Upper Grande Ronde - Bowman Project |
|
05/31/2018 |
|
| Completed Annual Report |
W: 132. Submit Progress Report for the Period January 1, 2016 to December 31, 2016 |
|
08/15/2017 |
08/15/2017 |