Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75330: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER/SLATE CREEK WATERSHED
Project Number:
Title:
Lower South Fork Clearwater/Slate Creek Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
75330
Contract Title:
2010-003-00 EXP LOWER SOUTH FORK CLEARWATER/SLATE CREEK WATERSHED
Contract Continuation:
Previous: Next:
71445: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RESTORATION 2016
  • 74017 REL 20: 2010-003-00 EXP LOWER SOUTH FORK CLEARWATER RIVER WATERSHED
Contract Status:
Closed
Contract Description:
Contract History:

This project is implemented as part of the Nez Perce-Clearwater National Forests (NPCNF)/Nez Perce Tribe (NPT) restoration partnership.  This project represents a merger of three ongoing Bonneville Power Administration (BPA) and NPT restoration projects: #1996-077-05, Meadow Creek Watershed Restoration; #2000-036-00, Mill Creek Watershed Restoration; #2007-064-00, Protect and Restore Slate Creek,#2007-064-00; combined with the expansion of the project area to include all of the NPCNF lands in the lower South Fork Clearwater River Basin rather than just selected watersheds.  The restoration partnership has been ongoing in the basin since 1996 and this project unification greatly increases the geographic area covered, and enhances the administrative and financial efficiency in order to maximize the direct benefit to fish and wildlife.

The goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  The South Fork Clearwater River/ Slate Creek watersheds contain proposed critical habitat for listed species Steelhead trout, potential critical habitat for bull Trout, and has moderate habitat potential for Spring Chinook salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plants.  The cost share for this project has been contributed by the NPCNF who provides at least a 20% match including cash and in-kind contributions for environmental compliance, contract preparation, administration, and technical oversight.  

FY 17 implementation includes 2 culvert replacement (to improve fish passage and hydrologic capacity, reduce potential sediment delivery and provide connectivity), design and installation of Beaver Dam Analogs (BDAs) to reconnect the floodplain and encourage beaver reintroduction, fence replacement to maintain riparian meadow exclosures, riparian planting (to decrease water temperatures and reduce potential sediment delivery), fence maintenance (to protect riparian plants), and continued planning and coordination for next year's projects and out-year habitat improvements.  NPT Watershed personnel will also continue an inventory of roads and stream crossings throughout the Lower South Fork Clearwater River/Slate Creek watersheds in order to identify fish passage barriers and road associated risks to aquatic species.
Account Type(s):
Expense
Contract Start Date:
03/01/2017
Contract End Date:
01/31/2018
Current Contract Value:
$861,524
Expenditures:
$861,524

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anthony Broncheau Nez Perce Tribe No Interested Party anthonyb@nezperce.org (208) 843-7317
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Miranda Gordon Nez Perce Tribe Yes Technical Contact mirandag@nezperce.org (208) 621-3547
Jenifer Harris Nez Perce Tribe No Interested Party jeniferh@nezperce.org (208) 983-1290
Arleen Henry Nez Perce Tribe No Administrative Contact arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Contract Manager markj@nezperce.org (208) 621-3561
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Heidi McRoberts Nez Perce Tribe Yes Interested Party heidim@nezperce.org (208) 621-3548
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Interested Party emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA for projects 01/31/2018 01/31/2018
Culvert replaced B: 184. Replace Peasley Creek Culvert 11/01/2017 10/04/2017
Culvert replaced C: 184. Replace Turnbull Creek Culvert 11/01/2017 08/21/2017
Fence Replaced- McComas Meadows E: 40. Replace Fence - McComas Meadows 10/01/2017 09/25/2017
Riparian Vegetation Planted F: 47. Plant Riparian Vegetation - Previous Restoration Projects 01/31/2018 06/01/2017
Exclosure Fence Maintained G: 186. Maintain Exclosure Fences - Mill Creek 07/01/2017 06/12/2017
Exclosure fence maintained H: 186. Maintain Exclosure Fences - McComas Meadows 07/01/2017 06/12/2017
Potential Passage Barrier Inventory I: 115. Assess and Inventory Potential Passage Barriers 01/31/2018 12/31/2017
Road Inventory J: 115. Assess Condition of Roads to Identify Aquatic Impacts 01/31/2018 12/17/2017
Manage Projects and Administrative duties K: 119. Management, Coordination, and Communication 01/31/2018 01/31/2018
Upload 2017 Annual Report to Pisces L: 132. 2017 Annual Report - 3/1/2017 - 1/31/2018 01/31/2018 01/31/2018
Completed Phase II MP 28 Fish Passage Study N: 115. Produce Fish Passage Assessment of S. Fork Clearwater River at SH 14, MP 28, Phase II 01/01/2018 01/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 184 Install Fish Passage Structure
  • 3 instances of WE 115 Produce Inventory or Assessment
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 184 Install Fish Passage Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA for projects 03/01/2017
B 184 Replace Peasley Creek Culvert 05/26/2017
C 184 Replace Turnbull Creek Culvert 01/18/2017
D 29 Reconnect Floodplain and Create Aquatic Complexity - Mill Creek
E 40 Replace Fence - McComas Meadows 01/18/2017
F 47 Plant Riparian Vegetation - Previous Restoration Projects 03/01/2017
G 186 Maintain Exclosure Fences - Mill Creek 01/12/2017
H 186 Maintain Exclosure Fences - McComas Meadows 01/12/2017
I 115 Assess and Inventory Potential Passage Barriers 03/01/2017
J 115 Assess Condition of Roads to Identify Aquatic Impacts 01/12/2017
K 119 Management, Coordination, and Communication 03/01/2017
L 132 2017 Annual Report - 3/1/2017 - 1/31/2018 03/01/2017
M 185 Periodic Status Reports for BPA 03/01/2017
N 115 Produce Fish Passage Assessment of S. Fork Clearwater River at SH 14, MP 28, Phase II 10/17/2017