Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 75444: 1996-077-02 EXP LOLO/SELWAY RIVER WATERSHED RESTORATION
Project Number:
Title:
Lolo/Selway River Watershed Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
75444
Contract Title:
1996-077-02 EXP LOLO/SELWAY RIVER WATERSHED RESTORATION
Contract Continuation:
Previous: Next:
71402: 1996-077-02 EXP LOLO CREEK WATERSHED RESTORATION 2016
  • 74017 REL 18: 1996-077-02 EXP LOLO CREEK WATERSHED RESTORATION
Contract Status:
Closed
Contract Description:
Contract History:  

The Lolo Creek Watershed Restoration project (1996-077-02) has been an on-going project of the Nez Perce Tribe Fisheries Watershed Program and BPA since 1996.  This unique and successful restoration partnership is implemented through agreements between the Nez Perce - Clearwater National Forests (NPCNFs), Nez Perce Tribe (NPT), and Bonneville Power Administration (BPA). The ultimate goal of the project is to restore the physical and biological characteristics of the watershed to provide quality habitat for anadromous and resident fish species that support the historical, cultural, and economic practices of the Nez Perce Tribe.  In 2016,  the Lolo Creek project was combined with the Selway River project, a newly funded BiOp effort initiated in 2011 to perform high priority watershed restoration actions in the Selway River watershed.

The Lolo Creek watershed contains proposed critical habitat for listed species Steelhead trout, potential critical habitat for Bull Trout, and has moderate habitat potential for Spring Chinook Salmon.  Restoration in this watershed focuses on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing affects, fish passage barriers, and noxious weed infestations.  Fish passage and habitat connectivity actions are prioritized primarily at road/stream crossings on both private and federal land, and native riparian revegetation and continuous riparian protection are also high priority actions.

The Selway River Watershed contains critical habitat for listed species Steelhead Trout, potential critical habitat for Bull Trout, and has moderate habitat potential for Spring Chinook Salmon.  Restoration follows a ridge top to ridge top approach with implementation focused on restoring riparian processes by addressing increased water temperatures, increased sedimentation, cattle grazing effects, aquatic habitat connectivity, and exotic, invasive plant encroachment.  The cost share for this project has been contributed by the Nez Perce - Clearwater National Forests who provides approximately 20% match including cash and in-kind contributions. Project planning and implementation responsibilities are also shared with the Nez Perce - Clearwater National Forests.



Completed contract work in the Lolo Watershed  includes culvert prioritization and assessment, installation of an off-site water source, 29 culvert replacements, 11 culvert removals, 1600 ft. of stream bank stabilization, 101.5 miles of road decommissioning, 21 miles of fence installation and maintenance, and over 24,000 native riparian trees and shrubs planted.  

Completed contract work in the Selway Watershed includes culvert prioritization and assessment, installation of 10 culvert replacements, 41 miles road decommissioning surveys.

                                                                                                                                                                                                                                    
Summary of FY 2016 contract implementation:

This project is part of the Nez Perce Tribe, BPA, and Nez Perce - Clearwater National Forests Watershed Restoration Partnership with in kind contributions from the Nez Perce - Clearwater National Forests.  

B) Road Decommissioning
Several miles of roads in Lolo Creek have previously been identified as excess to the needs of the Forest, and pose a threat of sediment delivery to anadromous fish bearing streams.  Up to 10 miles of roads will therefore be decommissioned.
  
C) Fence Maintenance
From 1998 to 2006 fence has been constructed of wooden posts and four-strand barbed wire.  21 miles of previously constructed fence will be thoroughly inspected for loose or weakened posts, and repaired as necessary.

D) Riparian Planting
The Lolo Creek watershed has historically experienced significant grazing and road construction which has destroyed riparian areas.  Re-vegetation efforts have been ongoing since 2000 and over 16,000 trees have been planted to date.  Approximately 1,200 native riparian trees and shrubs will be planted in a pattern that emulates the natural conditions.

E) Culvert Designs
NPT, NP-CNF, and selected Architecture and Engineering firms will work collaboratively to design up to two culvert replacement projects under this contract for implementation in future years, one of which will be the design of the Alder Creek AOP.

F) Increase Instream Habitat Complexity
Assist partners complete stream enhancement project on Dan Lee Creek.  Restoration to include installation of wood and beaver dam analogs (Post Assisted Log Structures) to improve floodplain connectivity and instream complexity.

G) Improve Road
Work with partner agencies to design the Lolo Creek Road improvement.  The final product will be a final design or implementation of the project depending on availability of outside funding.

H) Exotic, Invasive Species Treatment
The USFS Environmental Assessment completed in 2004 identifies the Musselshell Meadows as a highly used, culturally sensitive area of particular concern to the Nez Perce Tribe.  During the 2007 and 2014  field season, NPT and the NPCNFs completed a non-native, invasive plant inventory in Musselshell Meadows which was utilized to develop a treatment plan for the highest priority areas of the 190 acre meadow area and surrounding areas.  The focus will include corridors of invasion, such as roads, trails, and disturbed areas.
Account Type(s):
Expense
Contract Start Date:
02/01/2017
Contract End Date:
01/31/2018
Current Contract Value:
$661,244
Expenditures:
$661,244

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Anthony Broncheau Nez Perce Tribe No Interested Party anthonyb@nezperce.org (208) 843-7317
Marcie Carter Nez Perce Tribe Yes Supervisor marciec@nezperce.org (208) 621-3534
Anne Connor US Forest Service (USFS) Yes Interested Party aconnor@fs.fed.us (208) 476-8235
Elizabeth Eastman Nez Perce Tribe No Technical Contact elizabethe@nezperce.org (208) 621-3558
Sandra Fife Bonneville Power Administration Yes COR safife@bpa.gov (503) 230-3678
Arleen Henry Nez Perce Tribe No Interested Party arleenh@nezperce.org (208) 621-3833
Mark Johnson Nez Perce Tribe Yes Interested Party markj@nezperce.org (208) 621-3561
Ed Main Nez Perce Tribe No Technical Contact edwardm@nezperce.org (208) 621-3539
Heidi McRoberts Nez Perce Tribe No Interested Party heidim@nezperce.org (208) 621-3548
Justin Peterson Nez Perce Tribe Yes Contract Manager justinp@nezperce.org (208) 621-3545
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Emmit Taylor, Jr. Nez Perce Tribe No Interested Party emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation Submitted to BPA A: 165. Environmental Compliance for Projects on Forest Service Lands 01/31/2018 01/31/2018
Collette Mine Phase II Floodplain Reconnection B: 180. Collette Mine Phase II, Floodplain Reconnection 10/31/2017 09/14/2017
Large Wood and Instream Complexity C: 29. Collette Mine Phase II, LW and Instream Complexity 10/31/2017 09/14/2017
Completed Channel Construction D: 30. Collette Mine Phase II, Increase Sinuosity, Reconnect Historic Channel 10/31/2017 09/14/2017
Collette Mine Phase II, Construct Riparian Fencing E: 40. Collette Mine Phase II, Construct Riparian Fencing 11/30/2017 11/30/2017
Fence Maintained F: 186. Maintain Fence 11/30/2017 06/29/2017
Road Decommissioning Surveys G: 115. Road Decomissioning Surveys 10/31/2017
Riparian Planting Complete H: 47. Plant Riparian Vegetation 11/30/2017 11/30/2017
Dan Lee Creek Stream Improvement I: 29. Dan Lee stream Improvement 11/30/2017
Lolo Creek Road Improvement Design J: 38. Lolo Creek Road Improvement 01/31/2018 01/31/2018
Treat Exotic Invasive Species K: 199. Treat Exotic Invasive Species 10/31/2017 10/31/2017
Manage Projects and Administrative duties L: 119. Management, Coordination, and Communication 01/31/2018 01/31/2018
Attach 2016 Annual Report M: 132. Annual Report - February 2017 - January 2018 01/31/2018 01/31/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 40 Install Fence
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 199 Remove Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance for Projects on Forest Service Lands 02/01/2017
B 180 Collette Mine Phase II, Floodplain Reconnection 12/30/2016
C 29 Collette Mine Phase II, LW and Instream Complexity 01/06/2017
D 30 Collette Mine Phase II, Increase Sinuosity, Reconnect Historic Channel 01/06/2017
E 40 Collette Mine Phase II, Construct Riparian Fencing 01/11/2017
F 186 Maintain Fence 02/01/2017
G 115 Road Decomissioning Surveys 01/06/2017
H 47 Plant Riparian Vegetation 01/06/2017
I 29 Dan Lee stream Improvement
J 38 Lolo Creek Road Improvement 02/01/2017
K 199 Treat Exotic Invasive Species 01/10/2017
L 119 Management, Coordination, and Communication 02/01/2017
M 132 Annual Report - February 2017 - January 2018 02/01/2017
N 185 Periodic Status Reports for BPA 02/01/2017