Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 76148: 2002-068-00 EXP HABITAT RESTORATION RM&E
Project Number:
Title:
Evaluate Stream Habitat- Nez Perce Tribe Watershed Monitoring and Evaluation (M&E) Plan
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
76148
Contract Title:
2002-068-00 EXP HABITAT RESTORATION RM&E
Contract Continuation:
Previous: Next:
72747: 2002-068-00 EXP HABITAT RESTORATION RM&E
Contract Status:
Closed
Contract Description:
Contract Summary

The objective of this contract is to complete project-level habitat monitoring and evaluation activities in support of, and in collaboration with, a Programmatic Approach for Action Effectiveness Monitoring (AEM) developed by the Northwest Fisheries Science Center and the Bonneville Power Administration. Specifically, a multiple before-after control-impact (MBACI) experimental design will be utilized to monitor and evaluate the effectiveness of six habitat restoration actions proposed for implementation in North-Central Idaho and Northeast Oregon.  Collaboration and support will also be provided to Cramer Fish Sciences and the Natural Systems Design consulting firms to analyze and interpret the data, as well as for the completion of the associated reports for the Programmatic AEM MBACI activities.

FY 2017 Implementation Summary

The habitat restoration actions currently identified for 2017 monitoring and evaluation under this contract include:


• Newsome Creek Watershed - Newsome Creek Reach 2 floodplain restoration project
• Crooked River Watershed - Crooked River Meanders levee setback and channel reconstruction project
• Red River Watershed - Conservation Easement (Meadow) channel reconstruction project
• Lostine River Watershed - Sheep Ridge Diversion partial barrier project
• Lostine River Watershed - Tully Hill Diversion partial barrier project
• East Fork of South Fork Salmon River - Cox Creek Culvert partial barrier project
Account Type(s):
Expense
Contract Start Date:
06/01/2017
Contract End Date:
03/31/2018
Current Contract Value:
$185,257
Expenditures:
$185,257

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brenda Aguirre Bonneville Power Administration No Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Clint Chandler Nez Perce Tribe Yes Contract Manager clintc@nezperce.org (208) 621-3550
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
David Kaplowe Bonneville Power Administration Yes COR djkaplowe@bpa.gov (503) 230-5365
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Emmit Taylor, Jr. Nez Perce Tribe No Supervisor emmitt@nezperce.org (208) 621-3544
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Environmental compliance documentation submitted to BPA A: 165. Provide environmental compliance information to BPA 03/31/2018 03/26/2018
AEM MBACI Partial Barrier monitoring data B: 157. Partial Barrier AEM MBACI data collection 10/31/2017 08/31/2017
AEM MBACI Bank Stabilization monitoring data C: 157. Bank Stabilization AEM MBACI data collection 10/31/2017 09/27/2017
AEM MBACI Levee Setback, Channel Reconnection, Channel Reconstruction monitoring data. D: 157. Floodplain/Channel Restoration AEM MBACI data collection 10/31/2017 09/27/2017
FY 2018 Contract Package, FY 2017 Accrual Estimate, FY 2017 Cost Share E: 119. Management, Coordination, and Communication 11/24/2017 12/31/2017

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Provide environmental compliance information to BPA 06/01/2017
B 157 Partial Barrier AEM MBACI data collection 06/01/2017
C 157 Bank Stabilization AEM MBACI data collection 06/01/2017
D 157 Floodplain/Channel Restoration AEM MBACI data collection 06/01/2017
E 119 Management, Coordination, and Communication 06/01/2017
F 132 Collaborate to Produce Annual Report 06/01/2017
G 185 Periodic Status Reports for BPA 06/01/2017