| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 25.00% |
| Methow | 25.00% | |
| Okanogan | 25.00% | |
| Wenatchee | 25.00% |
| Previous: | Next: |
|---|---|
| n/a |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Environmental Compliance | A: 165. Environmental Compliance | 08/31/2018 | 08/31/2018 | |
| Project management | B: 119. Project Management | 08/31/2018 | 08/31/2018 | |
| Final design documents | C: 175. Final Design and Specifications | 04/20/2018 | 04/12/2018 | |
| Culvert installation | D: 184. Culvert Installation | 08/31/2018 | ||
| Floodplain connection | E: 30. Floodplain Connection | 08/31/2018 | ||
| Construction Management | F: 100. Construction Management | 08/31/2018 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Environmental Compliance | 07/01/2017 | ||||||
| B | 119 | Project Management | 07/01/2017 | ||||||
| C | 175 | Final Design and Specifications | 07/01/2017 | ||||||
| D | 184 | Culvert Installation | 06/30/2018 | ||||||
| E | 30 | Floodplain Connection | 06/30/2018 | ||||||
| F | 100 | Construction Management | 07/01/2017 | ||||||
| G | 185 | Periodic Status Reports for BPA | 07/01/2017 | ||||||
| H | 132 | (no report is required per COTR) | 09/01/2017 |