Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 76913 REL 20: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
76913 REL 20
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Continuation:
Previous: Next:
76913 REL 12: 2008-604-00 EXP IDFG LOWER CLEARWATER/POTLATCH WATERSHED
  • 76913 REL 28: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED
Contract Status:
Closed
Contract Description:
This project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan. The Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Priority tributaries for restoration work include: East and West Fork Potlatch River, Big Bear, Little Bear, Pine, Cedar, and Corral creeks. The mainstem Potlatch River is also a priority restoration area. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load, increasing base flows, and reducing high spring run conditions. Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, reservoir flow augmentation, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

It is intended that project staff will continue to seek additional non-BPA funds to implement best management practices designed for the improvement of steelhead spawning and rearing habitat. Project staff will also continue coordination efforts with other watershed planning efforts throughout the region to improve fish habitat.

The primary objectives of this contract include:

- Identify, plan, design, fund and implement high priority habitat restoration actions to improve steelhead habitat within the Potlatch River watershed cooperatively with Pacific Coast Salmon Recovery Funds.
- Complete restoration efforts on the Stowers steelhead habitat LWD restoration project on the lower East Fork of the Potlatch River;
- Work with BPA to evaluate alternatives, develop final design, and complete consultation for fish passage at Big Bear Falls;
- Develop new projects.
Account Type(s):
Expense
Contract Start Date:
07/01/2020
Contract End Date:
06/30/2021
Current Contract Value:
$252,092
Expenditures:
$252,092

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Governor's Office of Species Conservation Yes Technical Contact ryan.banks@osc.idaho.gov (208) 791-3014
Art Butts Idaho Department of Fish and Game (IDFG) Yes Technical Contact art.butts@idfg.idaho.gov (208) 287-2798
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Technical Contact gary.byrne@idfg.idaho.gov (208) 287-2778
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Supervisor mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) Yes Interested Party berhardt@latahswcd.org (208) 874-3821
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Mike Greiner Idaho Department of Fish and Game (IDFG) Yes Technical Contact michael.greiner@idfg.idaho.gov (208) 799-5010
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
Dave Huggins Latah Soil and Water Conservation District (SWCD) No Interested Party lswcd@latahsoil.org (509) 338-2549
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Paul Kline Idaho Department of Fish and Game (IDFG) No Interested Party paul.kline@idfg.idaho.gov (208) 287-2788
Eric Leitzinger Bonneville Power Administration Yes Interested Party ejleitzinger@bpa.gov (503) 230-3534
Jason Marchinek Latah Soil and Water Conservation District (SWCD) Yes Interested Party jmarchinek@latahswcd.org (208) 874-3788
Matthew Schwartz Bonneville Power Administration Yes COR mdschwartz@bpa.gov (503) 230-4225
Carolyn Sharp Bonneville Power Administration Yes Env. Compliance Lead casharp@bpa.gov (503) 230-5206
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Technical Contact kstinson@latahswcd.org (509) 338-2549
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance and Consultation Review A: 165. Environmental Compliance and Consultation Review 06/30/2021 06/30/2021
Effective implementation management and timely contract administration B: 119. Project management and administration 06/30/2021 06/30/2021
Future Project Identification C: 114. IDFG: Lower Clearwater/Potlatch Project Identification 06/30/2021 06/30/2021
EF Potlatch-Stowers: Install LWD D: 29. EF Potlatch-Stowers - LWD 05/28/2021 05/26/2021
Final design complete E: 175. Big Bear Falls Passage Design 06/30/2021
Annual progress report submitted G: 132. IDFG: Annual report for Contract 76913 REL 5 (July 2019-June 2020) 06/30/2021 03/15/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance and Consultation Review
B 119 Project management and administration
C 114 IDFG: Lower Clearwater/Potlatch Project Identification
D 29 EF Potlatch-Stowers - LWD 04/29/2020
E 175 Big Bear Falls Passage Design 06/03/2020
F 185 Periodic Status Reports for BPA
G 132 IDFG: Annual report for Contract 76913 REL 5 (July 2019-June 2020)