| Province | Subbasin | % |
|---|---|---|
| Mountain Snake | Salmon | 100.00% |
| Previous: | Next: |
|---|---|
| 76913 REL 13: 2007-394-00 EXP ID WATERSHED HAB RESTOR LEMHI - USBWP |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | A: 119. Routine administration of contract | 08/31/2021 | 08/31/2021 | |
| Completed Annual Report | C: 132. Submit Progress Report for the period (Sept 2019 ) to (Aug 2020) | 04/08/2021 | 04/08/2021 | |
| Coordination of the Upper Salmon Basin Watershed | D: 191. Watershed Coordination of the Upper Salmon Basin | 08/31/2021 | 08/31/2021 | |
| Projects identified, proposals ranked and submitted | E: 114. Identify and Select Projects in the Upper Salmon Basin | 08/31/2021 | 08/31/2021 | |
| Complete Section 7 ESA Consultation and IDWR/ACOE permitting | F: 165. Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA | 08/31/2021 | 08/31/2021 | |
| Provide tech review of designs and draft documents | G: 122. Provide design technical review | 08/31/2021 | 08/31/2021 | |
| Produce engineering designs for Lemhi conservation projects. | H: 175. Produce engineering designs for Lemhi conservation actions | 08/31/2021 | 08/31/2021 | |
| Conduct outreach and education on USBWP mission, projects, and fish habitat | I: 99. Outreach and education | 08/31/2021 | 08/31/2021 | |
| Unscheduled maintenance/repairs completed as needed | J: 186. Perform Unscheduled Maintenance of Habitat Project Sites | 08/31/2021 | 08/31/2021 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
| Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Routine administration of contract | |||||||
| B | 185 | Periodic Status Reports for BPA | |||||||
| C | 132 | Submit Progress Report for the period (Sept 2019 ) to (Aug 2020) | |||||||
| D | 191 | Watershed Coordination of the Upper Salmon Basin | |||||||
| E | 114 | Identify and Select Projects in the Upper Salmon Basin | |||||||
| F | 165 | Section 7 ESA consultation, permitting, Section 106 cultural consultation, NEPA | |||||||
| G | 122 | Provide design technical review | |||||||
| H | 175 | Produce engineering designs for Lemhi conservation actions | 07/29/2020 | ||||||
| I | 99 | Outreach and education | |||||||
| J | 186 | Perform Unscheduled Maintenance of Habitat Project Sites | 09/30/2020 |