Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 76913 REL 5: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED (IDFG)
Project Number:
Title:
Lower Clearwater and Potlatch Watersheds Habitat Improvements
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Clearwater 100.00%
Contract Number:
76913 REL 5
Contract Title:
2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED (IDFG)
Contract Continuation:
Previous: Next:
75798: 2008-604-00 EXP LOWER CLEARWATER/POTLATCH WATERSHED ACCORD
  • 76913 REL 12: 2008-604-00 EXP IDFG LOWER CLEARWATER/POTLATCH WATERSHED
Contract Status:
Closed
Contract Description:
This project is intended to implement habitat restoration activities in the Potlatch River Basin as identified in The Accord. The 377,776-acre Potlatch River watershed is located in north-central Idaho and is the largest tributary in the lower Clearwater River. The Potlatch River is critical to wild Snake River steelhead. This project seeks to restore wild Snake River Steelhead to a robust, self-sustaining population within the Potlatch River through coordinated implementation of best management practices on private timber, agricultural and range lands, coordination of interagency watershed planning efforts, and continuation of watershed monitoring and evaluation. This proposal is consistent with the NWPCC Fish and Wildlife Program’s goal to develop habitat-based programs designed to rebuild healthy, naturally producing fish and wildlife populations by protecting, mitigating, and restoring habitats. This project is consistent with the objectives and strategies of the Clearwater Subbasin Management Plan.

This project is intended to implement the Potlatch River Watershed Management Plan. The Plan has identified and prioritized limiting factors and restoration strategies critical to steelhead spawning and rearing within each subwatershed. Priority tributaries for restoration work include: East and West Fork Potlatch River, Big Bear, Little Bear, Pine, Cedar, and Corral creeks. The mainstem Potlatch River is also a priority restoration area. Projects will address limiting factors including removing migration barriers, increasing instream habitat complexity, reducing stream temperature and sediment load, increasing base flows, and reducing high spring run conditions. Implementation efforts will include but are not limited to repair, removal or replacement of old culverts and bridges, stream and floodplain reconnection, installation of large woody debris and other instream habitat structures, implementation of erosion/sediment control structures, riparian planting, livestock exclusion fencing, off-site water development, and protection of riparian and floodplain areas through easements or direct purchase.

It is intended that project staff will continue to seek additional non-BPA funds to implement best management practices designed for the improvement of steelhead spawning and rearing habitat. Project staff will also continue coordination efforts with other watershed planning efforts throughout the region to improve fish habitat.

The primary objectives of this contract include:

- Identify, plan, design, fund and implement high priority habitat restoration actions to improve steelhead habitat within the Potlatch River watershed cooperatively with Pacific Coast Salmon Recovery Funds.
- Develop designs and cost estimates for the Stowers steelhead habitat LWD restoration project on the lower East Fork of the Potlatch River;
- Work with BPA to evaluate alternatives for fish passage at Big Bear Falls;
- Complete restoration efforts at the Dammerman Meadow site on the East Fork Potlatch River
- Develop watershed plan for Big Meadow Creek to formalize restoration priorities for steelhead.
- Develop new projects.  
Account Type(s):
Expense
Contract Start Date:
09/01/2018
Contract End Date:
06/30/2019
Current Contract Value:
$275,359
Expenditures:
$275,359

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Ryan Banks Idaho Department of Fish and Game (IDFG) Yes Technical Contact ryan.banks@idfg.idaho.gov (208) 799-5010
Art Butts Idaho Department of Fish and Game (IDFG) Yes Supervisor art.butts@idfg.idaho.gov (208) 287-2798
Gary Byrne Idaho Department of Fish and Game (IDFG) Yes Technical Contact gary.byrne@idfg.idaho.gov (208) 287-2778
Mike Edmondson Idaho Governor's Office of Species Conservation No Contract Manager mike.edmondson@osc.idaho.gov (208) 334-2189
Brenda Erhardt Latah Soil and Water Conservation District (SWCD) No Interested Party berhardt@latahswcd.org (208) 874-3821
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
Janet Hohle Idaho Governor's Office of Species Conservation Yes Interested Party janet.hohle@osc.idaho.gov (509) 330-1249
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Paul Kline Idaho Department of Fish and Game (IDFG) Yes Technical Contact paul.kline@idfg.idaho.gov (208) 287-2788
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Claire McClory Bonneville Power Administration Yes Env. Compliance Lead cdmcclory@bpa.gov (503) 230-5922
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Ken Stinson Latah Soil and Water Conservation District (SWCD) Yes Interested Party kstinson@latahswcd.org (509) 338-2549
Tiege Ulschmid Idaho Department of Fish and Game (IDFG) Yes Technical Contact tiege.ulschmid@idfg.idaho.gov (208) 799-5010
Elham Zolmajd-Haghighi Bonneville Power Administration Yes Contracting Officer ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration A: 119. Project management and administration 06/30/2019 06/30/2019
Environmental Compliance and Consultation Review B: 165. Environmental Compliance and Consultation Review 06/30/2019 06/30/2019
Annual Completion Report for Project 75798 D: 132. IDFG: Annual report for Contract 75798 03/31/2019 01/28/2019
Future Project Identification E: 114. IDFG: Lower Clearwater/Potlatch Project Identification 06/30/2019 06/30/2019
Stower East Fork Potlatch Design--60% Design F: 175. IDFG: Stowers East Fork Potlatch - Design 06/30/2019
Dammerman Meadow: Produce bid documents, advertise and hold pre-bid meeting, and hire subcontractor. Initiate construction work as feasible. G: 29. IDFG: Dammerman Meadow - LWD 06/30/2019 03/31/2019
Produce final design and cost estimates of Dammerman Meadows restoration project. I: 175. IDFG: Finalize Dammerman Meadow Design and Hire Contractor 05/01/2019 03/31/2019
Deliverable: Determine cost estimate, including cultural surveys, permitting, construction, & M&E. J: 175. IDFG: Big Bear Falls Design & Consultation 06/30/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 3 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project management and administration 01/01/2018
B 165 Environmental Compliance and Consultation Review 01/01/2018
C 185 Periodic Status Reports for BPA 01/01/2018
D 132 IDFG: Annual report for Contract 75798 01/01/2018
E 114 IDFG: Lower Clearwater/Potlatch Project Identification 01/01/2018
F 175 IDFG: Stowers East Fork Potlatch - Design 07/17/2018
G 29 IDFG: Dammerman Meadow - LWD 04/10/2019
H 174 Big Meadow Creek Restoration Plan 09/01/2018
I 175 IDFG: Finalize Dammerman Meadow Design and Hire Contractor
J 175 IDFG: Big Bear Falls Design & Consultation