Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 76992: 2010-077-00 EXP TUCANNON (PA-28) PHASE III: FUNCTION & COMPLEXITY
Project Number:
Title:
Tucannon River Programmatic Habitat Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
76992
Contract Title:
2010-077-00 EXP TUCANNON (PA-28) PHASE III: FUNCTION & COMPLEXITY
Contract Continuation:
Previous: Next:
72405: 2010-077-00 TUCANNON (PA-28) PHASE 1-A: ADD FUNCTION & COMPLEXITY
Contract Status:
Closed
Contract Description:
Background:  The Tucannon River basin is located in Southeast Washington State in Columbia and Garfield counties.  The system-wide restoration objective for the Tucannon River is to improve habitat conditions for Endangered Species Act (ESA) listed species (Snake River Spring Chinook and Steelhead) for all life history stages. It is expected that improved habitat conditions will lead to an increase in the abundance of listed species returning to the river.  Increasing abundance will lead to de-listing of the species, which is the overall recovery goal for the system.  Previous efforts (CCD 2004; SRSRB 2006) have identified the habitat-limiting factors associated with the decline of ESA-listed populations throughout the Watershed.

Under prior contracts, the Columbia Conservation District (CCD) completed the Tucannon River Geomorphic Assessment & Habitat Restoration Study (Anchor QEA, April 2011), to identify and prioritize stream reaches and restoration actions which would best improve habitat for salmonids.  Focusing on the high priority areas for Tucannon spring Chinook, the Columbia Conservation District (CCD) coordinated the development of a habitat restoration plan for the Tucannon River from RM-20 upstream to RM-50; the District continued to work with the Snake River Salmon Recovery Board (SRSRB), through the Tucannon River Programmatic Habitat project, and extended the restoration plan from RM-20 downstream to the confluence of the Snake River. This Conceptual Restoration Plan (Anchor QEA, Nov 2011) has prioritized projects into three Tiers (1-3) based on the projected effects of implementation as a benefit to Snake River spring Chinook, cost-efficiency relative to those benefits, and the feasibility of construction.
___________________________________________________________
Overview:  Project Area 28 (PA-28) is a large scale/scope salmon habitat restoration project identified in previous assessment plans completed by Anchor QEA (2011).  The project reach is >2 miles in length, located within the active river channel and floodplain of the Tucannon River, on private land from ~RM-21.5 to approximately RM-19.35.  Restoration recommendations include the placement of Large Wood in the plane-bed sections of the side-channel, modification of existing floodplain restrictions, and installation  of an offset levee to improve floodplain connectivity and function. These identified restoration actions in the project area address limiting factor 6.2, channel structure and form; they are directly associated with the analysis of critical Limiting Factors (Floodplain Confinement) identified in the Expert Panel process; and they are targeted for implementation as a credit toward BPA's BiOp commitments.

The overall project goal is to increase/maintain proper floodplain structure and connectivity by increasing channel complexity and reconnecting historic channels. Objectives for the project are to: a) place LWD for habitat complexity and to improve stream channel form and function; b) increase proper floodplain structure/connectivity through additional wood placements; c) remove cobbled berms/spoil piles to reconnect existing historic flow paths; and d) construct an offset floodplain dike/levee to reactivate historic floodplain capacity and connect otherwise isolated habitats, while providing protection for agricultural production fields and associated landowner infrastructure.  The Columbia Conservation District (CCD) working with Kris Buelow, Snake River Salmon Recovery Board (SRSRB), the BPA Tucannon Programmatic Habitat project manager, will be implementing PA-28 in phases due to annual fiscal-year funding limitations and the constraints of instream work window periods.  

In FY16, the CCD implemented Phase I (A & B), including: (A)  (0.42 miles) of wood placement to improve channel and floodplain connectivity/ function; and (B) a (3,500') levee setback to provide landowner security while the newly emergent river channel conditions mature, and as floodplain connectivity adjusts, augmented by LWD placements and the modification and breaching of the existing cobbled-berm. Construction oversight encompassed both the Phase 1-A work in this contract, and the Phase 1-B component identified in the separate CCD contract for FY16 (#71864).  In FY17, the CCD completed Phase II in the upper main channel using a combination of CCD district funds (Project 1994-018-06, contract #75465) to construct 44 LWD structures to be placed on, or anchored in the river bed or bank for the purpose of developing habitat complexity in the form of pools, side channels or bars.  During this Phase II, ~1.8 miles of stream channel will be treated to bring the number of key log pieces up to a minimum 1 piece (>6m long and 0.30 cm dia.) per bank-full width. In FY18, the District will continue work in this channel segment; the overall Phase III reach restoration goals are to increase floodplain connectivity and channel complexity, through channel shape modification driven by wood placement.  The design construction will place 44 anchored complex log jam structures to the river bed or bank within the ~1.8 miles of the main and side channel project reach.  It is anticipated that ~30-35 pools will be formed as a result of project implementation.

Purpose: Address high priority restoration actions including: improved channel complexity (LWD), floodplain connectivity, increased perennial channel length, and improved channel morphology. Immediate biological benefits will include decreased instream velocities during high-flows, and better connectivity with the floodplain.  Over time, channel processes will establish and maintain a variety of habitat elements and improved hydraulic conditions. The availability of ample and diverse habitats will increase the carrying capacity for juvenile salmonids and support habitat needs throughout the salmon lifecycle.
___________________________________________________________

Current Emphasis:  Programmatic (BPA) funding (FYs17/18) will be utilized for PA-28 Phase III-is to place ~10-12 log jams in ~0.5 miles of the main channel and ~ 50 logs in side channel adjacent to the planned (Phase II) LWD structures placed under  #75465.  The purpose of this work is to place structure in the remaining channel length (identified in the Phase I design), and place LWD in areas of the floodplain where either/both perennial and ephemeral flows are expected following implementation (Phase III), and as a result of the prior Phase I & II installed design features.

Status:  This 24-month contract is to complete the implementation of the engineered design during the construction of Phase III; including:  
  -- any subsequent design modifications that may be required (following review), or as an adaptation in response to changes in channel geomorphology or site conditions (since completion of the design), and as adjusted during the initial construction phase
  -- modifications to or renewal of existing permits; or additional required permitting
  -- revised or amended environmental and cultural resource clearances
  -- adjustments to implementation strategies or approaches, including scheduling and logistics, that facilitate the construction of improved habitat features, in-channel structures, and other actions to restore ecological function
  -- vegetative plantings that are an integral component of the restoration design, to improve habitat function and connectivity; and
--  the remediation of construction impacts that includes the clean-up and restoration of construction access points and materials or equipment storage and mobilization areas.

In Phase I (A&B) Phase II, the CCD will have placed ~68 log jams in ~1.92 miles of the main stem of the Tucannon and side channel adjacent to planned setback levee.  Structures placed in the main channel will be placed to enhance flow into side channel and maintain the channel over time.  Wood placed in the side channel is primarily for channel shaping (W/D, bed aggradation, and pool forming) and complexity cover.

Future Considerations: Project spans a minimum of two contract periods (24 - 36 month duration) covering Phase I (Year-1); and the subsequent implementation of the complete restoration design. It is anticipated future phases of this project area will follow in 2017-18, depending on available funding, including the construction of engineered structures and other features (Phase II- IV).  Additional, upcoming phases will:  
  --  place an additional 12 LWD structures and 50 single logs in the main channel and side channels;  
  --  re-water disconnected historic channels increasing perennial stream length up to a mile within the reach.
____________________________________________________________________________________
Geomorphic Implications:  Setting back infrastructure will allow a wider corridor for channel migration and accessible floodplain area. Increased connectivity with the low-lying floodplain will lead to decreased channel velocities during high flows and dispersion of sediment across the floodplain.  Addition of LWD will initiate a geomorphic response resulting in bed scour and sorting of sediment, which forms critical habitat features (e.g., pools, cover, and spawning gravels).  Because the channel profile is controlled by man-made features and bedrock, the wood placements are not expected to significantly affect the channel grade. However, the ELJs will influence the development of additional pools and depositional areas in the plane-bed sections of the channel. In addition, large wood structures will promote development of a more complex channel network by splitting flow, initiating gravel bar and island development, and promoting channel migration within the reconnected floodplain area.

Biological Benefits:  Immediate biological benefits of the project include decreased instream velocities during high flows from better connectivity with the floodplain, and pool development and cover provided by the LWD placements. As the channel is able to establish a more complex plane-form through the reconnected floodplain, more diverse habitat areas will be available to increase the carrying capacity for juvenile salmonids. Deposition of sediment and formation of side channels will create additional spawning area. Over time, greater floodplain connectivity will also lead to a healthier riparian zone and, in turn, promote improved ecosystem processes and habitat function.
Account Type(s):
Expense
Contract Start Date:
09/01/2017
Contract End Date:
03/31/2020
Current Contract Value:
$679,060
Expenditures:
$679,060

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Terry Bruegman Columbia Conservation District (SWCD) No Supervisor tb-ccd@daytonwa.net (509) 382-4273x102
Kris Buelow Snake River Salmon Recovery Board Yes Technical Contact kris@snakeriverboard.org (509) 392-3858
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
John Foltz Snake River Salmon Recovery Board No Supervisor john@snakeriverboard.org (509) 382-4115
Daniel Gambetta Bonneville Power Administration Yes Env. Compliance Lead dagambetta@bpa.gov (503) 230-3493
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Andre L'Heureux Bonneville Power Administration Yes COR allheureux@bpa.gov (503) 230-4482
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Debra Nordheim Columbia Conservation District (SWCD) Yes Contract Manager dn-ccd@daytonwa.net (509) 382-4273x101


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Habitat Project Implementation Management and Contract administration A: 119. Habitat Project Implementation Management and Contract Administration 03/31/2020 03/31/2020
Environmental and Cultural Resource compliance assistance and clearance documentation B: 165. Environmental Compliance Documentation & Clearance for habitat protection, restoration & enhancements 11/30/2019 11/30/2019
Review and adjustment to design specifications and engineering; produce revised/final construction or site plan C: 175. Finalize Design Specifications and Engineering (Completion & Adjustments): PA-28 06/30/2018 06/04/2018
Placement of Log Structures in stream to create habitat complexity & function D: 29. Install structures and place wood to form pools and promote side-channel development & complexity 10/01/2018 09/12/2018
Activate and realign historic flow paths & side channels to connect floodplain habitat E: 30. Reactivate side channel meanders and historic flow-paths to encourage floodplain connectivity 10/01/2018 09/12/2018
Develop side channel crossings (rocked-ford) for farm access F: 38. Construct rocked ford channel crossings 12/31/2018 09/12/2018
Re-establish PA-28 riparian and floodplain plant community. G: 47. Support or Establish Riparian and Floodplain Plant Community 06/30/2019 03/27/2019
Provide pre-construction project management activities; supervise the design build-out (Phase III) H: 100. Site Preparation, Materials Management, Field Engineering, Quality Assurance, Construction Ovesight 03/31/2020 03/31/2020
Conceptual Restoration Strategy Update and Revised Implementation Planning Framework K: 174. Conceptual Habitat Restoration Strategy: Tucannon Plan Update (2019) 03/31/2020 03/31/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 38 Improve Road for Instream Habitat Benefits
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Habitat Project Implementation Management and Contract Administration 07/01/2017
B 165 Environmental Compliance Documentation & Clearance for habitat protection, restoration & enhancements 07/01/2017
C 175 Finalize Design Specifications and Engineering (Completion & Adjustments): PA-28 07/01/2017
D 29 Install structures and place wood to form pools and promote side-channel development & complexity 01/29/2018
E 30 Reactivate side channel meanders and historic flow-paths to encourage floodplain connectivity 01/29/2018
F 38 Construct rocked ford channel crossings 01/29/2018
G 47 Support or Establish Riparian and Floodplain Plant Community 01/29/2018
H 100 Site Preparation, Materials Management, Field Engineering, Quality Assurance, Construction Ovesight 07/01/2017
I 185 Periodic Status Reports for BPA 07/01/2017
J 132 Report encompassed in yearly Programmatic Habitat reporting for the Tucannon (#2010-077-00) 07/01/2017
K 174 Conceptual Habitat Restoration Strategy: Tucannon Plan Update (2019) 01/02/2018