Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 77401: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Project Number:
Title:
Snake River Sockeye Captive Propagation
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
77401
Contract Title:
2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Continuation:
Previous: Next:
73979: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
  • 80550: 2007-402-00 EXP IDFG SPRINGFIELD HATCHERY SOCKEYE PRODUCTION
Contract Status:
Closed
Contract Description:
This contract period will the final ramp-up to full production levels at Springfield Fish Hatchery. Approximately 960,000 BY16 fingerlings will be in outdoor raceways at the beginning of this contract period. A representative group of these fish will be PIT tagged during fall of 2017. The smolts will be released during late April 2018 at a size of approximately 10 fish per pound (fpp). Baseline data including growth, survival, feed conversion rates, etc. will be collected, reported monthly, and used to set-up future brood year's projections and standard fish culture procedures. Springfield Fish Hatchery anticipates a full production scenario of 1.2 million BY17 Sockeye Salmon eyed eggs to be received beginning in November 2017. The resulting fry are to be incubated to the swim-up stage, then transferred to early rearing tanks in January/February 2018. When these fish reach a size of approximately 100-120 fpp, they will be adipose clipped and transferred from early rearing tanks to the outdoor raceways. This usually occurs in early July of each year. Baseline data described above will continue to be collected.

Testing and refinement of operational procedures relating to the water delivery systems for fish production activities and fish transport will continue into this contract period. this includes fixed speed and variable speed pumps, head-boxes with aeration equipment, and chiller. Research into increasing the current chilled water availability through the chiller will continue during this contract period.

Hatchery staff will update inventory as equipment is received. Annual preventative scheduled maintenance activities will be ongoing throughout this and all future contract periods.

Hatchery personnel will attend and participate in Stanley Basin Sockeye Technical Oversight Committee (SBSTOC) and program specific meetings as program needs necessitate and time allows.
Account Type(s):
Expense
Contract Start Date:
10/01/2017
Contract End Date:
09/30/2018
Current Contract Value:
$863,791
Expenditures:
$863,791

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Dan Baker Idaho Department of Fish and Game (IDFG) Yes Technical Contact dan.baker@idfg.idaho.gov (208) 939-4114
Travis Brown Idaho Department of Fish and Game (IDFG) No Technical Contact travis.brown@idfg.idaho.gov (208) 939-4114
Matthew Campbell Idaho Department of Fish and Game (IDFG) Yes Interested Party matthew.campbell@idfg.idaho.gov (208) 939-6713
Brandon Filloon Idaho Department of Fish and Game (IDFG) Yes Contract Manager brandon.filloon@idfg.idaho.gov (208) 328-9945
Bryan Grant Idaho Department of Fish and Game (IDFG) Yes Supervisor bryan.grant@idfg.idaho.gov (208) 236-1256
Heidi Haak Bonneville Power Administration No Interested Party hlhaak@bpa.gov (541) 922-6856
Paul Kline Idaho Department of Fish and Game (IDFG) Yes Interested Party paul.kline@idfg.idaho.gov (208) 287-2788
Christine Kozfkay Idaho Department of Fish and Game (IDFG) Yes Interested Party christine.kozfkay@idfg.idaho.gov (208) 287-2789
Solomonn Marsh Bonneville Power Administration Yes Contracting Officer spmarsh@bpa.gov (503) 230-3943
Jonathan McCloud Bonneville Power Administration Yes COR jmmccloud@bpa.gov (503) 230-3110
Christopher Roper Bonneville Power Administration No CO Assistant cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No CO Assistant tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration Yes Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Dan Warren D J Warren and Associates, Inc. No Interested Party dan.warren@djwassociates.com (541) 929-4639
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479
Elham Zolmajd-Haghighi Bonneville Power Administration No CO Assistant ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Permits/Authorizations Acquired A: 165. Obtain Permits and submit copies to BPA NEPA group 09/30/2018 09/28/2018
Maintain Springfield Fish Hatchery C: 61. Maintenance of grounds, buildings and related fish rearing equpiment at Springfield Fish Hatchery 09/30/2018 09/30/2018
Attendance at program essential and SBSTOC meetings. D: 189. Quarterly SBSTOC coordination meeting and program essential meetings 09/30/2018 08/15/2018
Rear BY 16 juvenile Sockeye Salmon at Springfield Fish Hatchery E: 176. Rear BY 2016 Springfield sockeye production group 04/30/2018 05/10/2018
Mark BY 2016 Springfield sockeye production group F: 158. Tag BY 2016 Springfield sockeye production group 10/31/2017 10/26/2017
Rear BY 2017 Sockeye Salmon Production Group at Springfield Hatchery G: 176. Rear BY 2017 Springfield sockeye production group 09/30/2018 09/30/2018
Mark BY 2017 Springfield sockeye production group H: 158. Mark BY 2017 Springfield sockeye production group 07/23/2018 07/12/2018
2018 Salmon River AOP I: 174. Salmon River Annual Operating Plan 07/12/2018 07/12/2018
Completed Annual Report J: 132. Submit Progress Report for the period (OCT 2016) to (SEP 2017) 03/30/2018 03/09/2018
Effective implementation management and timely contract administration K: 119. Submit FY19 funding package to BPA 09/30/2018 09/30/2018
Finished equipment storage Pole Barn M: 171. Construct Pole Barn to store hatchery equipment 04/30/2018 04/06/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 2 instances of WE 158 Mark/Tag Animals
  • 1 instance of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Permits and submit copies to BPA NEPA group 10/01/2017
B 202 CY17 Snake River sockeye RPA/BiOp Data
C 61 Maintenance of grounds, buildings and related fish rearing equpiment at Springfield Fish Hatchery 08/15/2017
D 189 Quarterly SBSTOC coordination meeting and program essential meetings 10/01/2017
E 176 Rear BY 2016 Springfield sockeye production group 08/15/2017
F 158 Tag BY 2016 Springfield sockeye production group 08/15/2017
G 176 Rear BY 2017 Springfield sockeye production group 08/15/2017
H 158 Mark BY 2017 Springfield sockeye production group 08/15/2017
I 174 Salmon River Annual Operating Plan 08/15/2017
J 132 Submit Progress Report for the period (OCT 2016) to (SEP 2017) 10/01/2017
K 119 Submit FY19 funding package to BPA 10/01/2017
L 185 Periodic Status Reports for BPA 10/01/2017
M 171 Construct Pole Barn to store hatchery equipment 01/22/2018