Contract 79023: 1992-026-01 EXP WALLOWA BAKER PHASE II - 2018
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
79023
Contract Title:
1992-026-01 EXP WALLOWA BAKER PHASE II - 2018
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
The stream course and drainage patterns in the Wallowa River-Baker Phase 2 project area have been severely altered as a result of agricultural practices and road construction. Riparian forests have been converted to agricultural fields. Instream habitat and habitat complexity have been diminished by in-channel maintenance. Few pools are present and vertical, eroding banks limit floodplain interaction and hyporheic exchange. The project includes placing 30.2 acres in a 15-year conservation easement and addressing limiting factors for ESA listed spring Chinook salmon, summer steelhead, and bull trout by eliminating salmonid stranding and entrapment in the spring creek/irrigation ditch, improving riparian habitat and channel condition, floodplain and instream habitat creation, increasing habitat complexity, reducing sediment delivery, and contributing towards improved flow and water temperature regimes. Funding will be used for 1) constructing 7 mainstem habitat structures to improve habitat, increase habitat diversity, and provide streambank stabilization; 2) materials for a fish screen and bypass structure; 3) materials for a solar water system; 4) materials for an irrigation pipe; 5) site restoration; 6) plants; and 7) a barbed wire fence. ODFW will design and install a fish diversion and bypass structure and install project plants.
Account Type(s):
Expense
Contract Start Date:
05/01/2018
Contract End Date:
06/30/2020
Current Contract Value:
$14,230
Expenditures:
$14,230

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 69 Install Fish Screen
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 69 Install Fish Screen

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance For Wallowa-Baker Phase 2 Habiat Restoration 07/01/2018
B 29 Install Seven Mainstem Wallowa River Habitat Structures 03/21/2018
C 34 Off-Site Livestock Water for Wallowa River-Baker Phase 2 Project 03/21/2018
D 34 Install Pipeline to Water Field 03/21/2018
E 40 Install Barbed Wire Fence 03/21/2018
F 47 Purchase & Obtain Trees & Shrubs to Plant on Wallowa River-Baker Phase 2 Habitat Project 03/21/2018
G 69 Install Fish Screen and Diversion Device 03/21/2018
H 119 Manager and Administer Wallowa-Baker Phase 2 Project 07/01/2018
I 132 Wallowa Baker Phase II Completion Report -May 2018 - June 2020 07/01/2018
J 185 Quarterly Status Reports 07/01/2018