Close Message
CBFish website will be offline for several hours starting at 5 PM today for maintenance. Thank you for your patience.
Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 80477: 2008-603-00 EXP PAHSIMEROI WATERSHED HABITAT (CUSTER SWCD)
Project Number:
Title:
Pahsimeroi River Habitat
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
80477
Contract Title:
2008-603-00 EXP PAHSIMEROI WATERSHED HABITAT (CUSTER SWCD)
Contract Continuation:
Previous: Next:
74491: 2008-603-00 EXP PAHSIMEROI RIVER HABITAT - CUSTER
  • 83335: 2008-603-00 EXP PAHSIMEROI RIVER HABITAT
Contract Status:
Closed
Contract Description:
The Pahsimeroi River, a tributary to the mainstem Salmon River, contains Snake River Spring/Summer Chinook, Steelhead, cutthroat trout, westslope trout, bull trout, and interior red-band trout.  Work in this contract will address habitat restoration for these species, particularly Chinook and steelhead.

The NOAA Fisheries Spring/Summer Chinook and Steelhead Recovery Plan (2017) identifies limiting factors in the Pahsimeroi River for Spring/Summer Chinook as low stream flows, passage barriers/connectivity, degraded riparian conditions, degraded channel form and lack of complexity, and water quality. Limiting factors for Pahsimeroi River Steelhead populations include reduced flows during critical periods, migration barriers, elevated water temperatures, degraded riparian conditions, and entrainment.  

Habitat restoration and recovery needs for these species include increased stream flows in the main-stem Pahsimeroi and its tributaries. The Custer SWCD is addressing the need to improve flows by working with the Idaho Department of Water Resources and with individual water users to develop water conservation measures, modify existing barriers caused by diversion or culverts, improve riparian conditions by restoring riparian vegetation, and reducing entrainment by screening irrigation ditches to NOAA standards.

The projects identified in this statement of work address these recovery needs by installing a pipeline and an irrigation diversion structure on the project area known as P-17. The pipeline is designed to make the existing irrigation system more efficient and to leave an additional 3.2-6 cfs in the Pahsimeroi River. A new irrigation diversion will also be installed on P-17 to address a partial passage barrier. NRCS will provide design and assist in implementation for the irrigation infrastructure. IDFG will design and install the fish screen under a separate contract. (Screen installations are done via a separate BPA project for IDFG’s Screen Shop (2007-399-00)).

Work in this contract will also include installing riparian fencing and a stock-water system to provide water away from the riparian area and eliminate streamside impacts by livestock. This reach is on IDL (state land) property, which is also part of a channel restoration project funded and implemented by IDFG’s Pahsimeroi contract (2008-603-00 contract 76913 Release 006). Fencing will exclude livestock from the restored channel and riparian area to protect the project area and allow vegetative cover to establish.

These projects have been developed and ranked for implementation by the Custer SWCD in conjunction with the Pahsimeroi Basin Subcommittee group, which includes the Idaho Department of Fish and Game, U. S. Bureau of Reclamation, Idaho Department of Water Resources, Natural Resources Conservation Service, Trout Unlimited, Idaho Office of Species Conservation, the Corps of Engineers, Custer and Lemhi counties, NOAA Fisheries, US Fish and Wildlife Service, and private landowners. This group meets monthly to plan and develop approaches to address restoration needs in the Pahsimeroi and its tributaries.

Out-year planning work in this contract includes multiple opportunities for riparian fencing in the Pahsimeroi and Patterson/Big Springs Creek as the Custer SWCD continue to work with landowners to develop these plans. Custer SWCD will continue to work with the Pahsimeroi Subcommittee to identify and prioritize these projects. This effort will be accomplished with Custer SWCD staff time under this contract. Any funding to complete repairs would be developed with BPA support in a subsequent contract.
  

Account Type(s):
Expense
Contract Start Date:
09/26/2018
Contract End Date:
09/25/2019
Current Contract Value:
$100,440
Expenditures:
$100,440

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Wayne Baker Custer Soil and Water Conservation District (SWCD) No Supervisor SHARED_cswcd@custertel.net (208) 879-4428
Daniel Bertram Idaho Governor's Office of Species Conservation No Interested Party daniel.bertram@osc.idaho.gov (208) 756-6322
Karma Bragg Custer Soil and Water Conservation District (SWCD) Yes Contract Manager cswcd@custertel.net (208) 879-4428
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Lisa Dexter Bonneville Power Administration No Interested Party lldexter@bpa.gov (503) 230-3893
Mike Edmondson Idaho Governor's Office of Species Conservation Yes Interested Party mike.edmondson@osc.idaho.gov (208) 334-2189
Amy Hines Idaho Governor's Office of Species Conservation Yes Contract Manager amy.hines@osc.idaho.gov (208) 332-1557
David Kaplowe Bonneville Power Administration Yes F&W Approver djkaplowe@bpa.gov (503) 230-5365
Jennifer Lord Bonneville Power Administration Yes COR jklord@bpa.gov (503) 230-5192
Christopher Roper Bonneville Power Administration No Interested Party cproper@bpa.gov (503) 230-3514
Tybee Sheidler Bonneville Power Administration No Interested Party tasheidler@bpa.gov (503) 230-3820
Robert Shull Bonneville Power Administration No Env. Compliance Lead rwshull@bpa.gov (503) 230-3962
Gregory Smith Bonneville Power Administration Yes Interested Party gmsmith@bpa.gov (503) 230-5049
Elham Zolmajd-Haghighi Bonneville Power Administration No Interested Party ezolmajd-haghighi@bpa.gov (503) 230-7414


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Obtain or complete Environmental consultation documents and provide to BPA B: 165. Produce EC documents on identified projects 08/30/2019 08/30/2019
Effective implementation management and timely contract administration C: 119. Manage and administer projects within this contract 09/25/2019 08/30/2019
Completed Annual Report D: 132. Submit Progress Report for the period September 26, 2016 thru September 25, 2018 11/30/2018 10/05/2018
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces E: 114. Identify and select projects based on partnership coordination with Pahsimeroi Subcommittee 09/25/2019 09/20/2019
Produce Design and/or Specifications F: 175. Produce Design: NRCS design assistance and technical support 09/25/2019 08/30/2019
Complete pump installation. G: 203. Install pumps in new wells on J&K P property to complete a switch from surface water to ground water. 09/25/2019
Purchase and install approximately 5820 feet of 15" pipe from the Point of Diversion to the place of use. H: 203. P-17: Purchase and install 15" PVC pipe from the point of diversion to the existing on farm system of the Bar4M Ranch. 09/25/2019
Install fish friendly diversion structure, remove and re-habilitate existing structure. I: 84. Install new fish friendly diversion and remove barrier on P17 for the Bar4M Ranch. 09/25/2019
Install Riparian Fence on Pahsimeroi on State Land near P17 J: 40. Install riparian fence along the Pahsimeroi on the State Lands/IDL property 04/26/2019 03/29/2019
Install Stockwater system on State Land K: 34. Use existing well to provide stock-water to State Lands/IDL property 09/25/2019 11/30/2018

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 203 Install Water Conservation Measure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 09/26/2018
B 165 Produce EC documents on identified projects 09/26/2018
C 119 Manage and administer projects within this contract 09/26/2018
D 132 Submit Progress Report for the period September 26, 2016 thru September 25, 2018 09/26/2018
E 114 Identify and select projects based on partnership coordination with Pahsimeroi Subcommittee 09/26/2018
F 175 Produce Design: NRCS design assistance and technical support 04/18/2019
G 203 Install pumps in new wells on J&K P property to complete a switch from surface water to ground water. 01/03/2019
H 203 P-17: Purchase and install 15" PVC pipe from the point of diversion to the existing on farm system of the Bar4M Ranch.
I 84 Install new fish friendly diversion and remove barrier on P17 for the Bar4M Ranch.
J 40 Install riparian fence along the Pahsimeroi on the State Lands/IDL property 09/25/2018
K 34 Use existing well to provide stock-water to State Lands/IDL property 09/25/2018