Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 81779: 1992-026-01 EXP UGR HWI WOODLEE RESTORATION 2019-20
Project Number:
Title:
Grande Ronde Model Watershed
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
81779
Contract Title:
1992-026-01 EXP UGR HWI WOODLEE RESTORATION 2019-20
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
Introduction

The Woodlee Restoration Project is located on the Upper Grande Ronde River, tributaries to the Snake River.  The project is located on 1.25 miles of the upper Grande Ronde River (RM 198-199). The project is located within Upper Grande Ronde River (1706010401); Meadowbrook Creek (170601040103) watersheds. The Upper Grande Ronde River is spawning and rearing habitat for Snake River Basin summer steelhead, Snake RiverBasin spring chinook salmon, bull trout and redband trout.  Historic beaver trapping, mining, roading and the Woodlee Campground created a confined channel, with limited floodplain interaction and diminished deciduous vegetation.

The Woodlee reach of the upper Grande Ronde River and its meadow habitats are not in proper functioning ecological condition (hydrologic, geomorphic, vegetative composition), due to historic management that included beaver trapping, mining, roading and the Woodlee Campground.

The project would prioritize LWD placement to add roughness, increase floodplain interaction and habitat complexity, promote out of channel flooding and activate 1.25 miles of side channels.  It is expected that the project will promote longer periods of hydrologic production, decreased stream temperatures, increased low velocity habitat, increased fish cover and increased riparian deciduous vegetation.  The project would place wood within 1.25 miles of the upper Grande Ronde River and 1.25 miles of side channels, plant 4,000 deciduous seedlings and 10,000 cuttings.  Project partners include: Grande Ronde Model Watershed, Bonneville Power Administration, and the US Forest Service.

Issues

Floodplain form and function:  The Woodlee reach has limited water capture and retention capacities due to past anthropogenic influences.  These deficiencies have lowered ground tables.  This has resulted in lower riparian vegetation survival and vigor, a decreased ability to store water and buffer water temperature, less connection to the floodplain to moderate in-channel velocity, and lower quality salmon habitat.  Lack of floodplain form and function has resulted in:

*  Decrease in water storage and meadow/wetland habitats resulting in drier site and mesic-site species encroachment. Drier sites are less conducive to riparian deciduous woody vegetation species (Populous and Salix) that are important food and habitat for beaver populations.

*  Potential increase of in-stream water temperatures from decrease in groundwater recharge, which can be problematic for salmonids.

*  Increase of in-channel velocity where the channel has downcut, and doesn't spread water out onto the floodplain during high flows.  The process of downcutting causes vertical erosion, which increases fine sediment levels and decreases habitat complexity.

*  Decrease in the amount of zero velocity habitat, which provide juvenile salmonids protection, temperature buffering, food sources and feeding areas, and resting areas.

Side channel habitat and activation:  There are 1.25 miles of old channel scrolls within the floodplain that are rarely activated, due to many of the issues identified above.

*  Channel incision and lack of woody debris have isolated 1.25 miles of side channel scrolls from the existing channel.  These channels only flow during high flow events.
Fish habitat complexity:  The Woodlee Reach's fish habitat complexity (cover, pool quality/quantity, and zero velocity habitat) is limited.

• Channel incision and lack of instream woody material has affected the quantity and quality of spawning, rearing, and overwintering habitat in the Woodlee Reach.
Objectives


Specific Actions

Restore Hydrologic Function - Increase hydration of a laterally confined channel to improve groundwater retention through channel spanning log jam construction.

Activate 1.25 Miles of Side Channel Scrolls - Encourage and create perennial side channels through channel spanning log jam construction.

Improve Fish Habitat - Restore habitat complexity. Existing LWD structures will be modified and additional whole trees will be placed.  These structures will encourage scour pool habitat, and fish cover.


Benefits

Approximately, 1.25 miles of side channels will be activated through constructing woody debris jams in strategic locations to raise water levels that would engage existing side channel scrolls.

* Floodplain engagement will increase through constructing woody debris jams in strategic locations to raise water levels.

* Deciduous riparian vegetation would increase through planting and increased survival/natural recruitment through raised water tables.

* Habitat complexity and pool quality will improve through woody debris jam construction.

Account Type(s):
Expense
Contract Start Date:
04/01/2019
Contract End Date:
06/30/2020
Current Contract Value:
$126,150
Expenditures:
$126,150

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Iaa
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Sarah Brandy US Forest Service (USFS) No Technical Contact sarah.brandy@usda.gov (541) 962-8590
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Tracy Hauser Bonneville Power Administration Yes COR tlhauser@bpa.gov (503) 230-4296
Aric Johnson US Forest Service (USFS) No Supervisor ajjohnson@fs.fed.us (541) 962-8517
Travis Kessler Bonneville Power Administration No Env. Compliance Lead tdkessler@bpa.gov (503) 230-5468
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Joe Platz US Department of Agriculture (USDA) Yes Contract Manager joe.platz@usda.gov (541) 962-8571
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Jesse Steele Grande Ronde Model Watershed Foundation No Interested Party jesse@grmw.org (541) 663-0570
Connar Stone Grande Ronde Model Watershed Foundation No Interested Party connar@grmw.org (541) 663-0570
Alexandra Towne Grande Ronde Model Watershed Foundation Yes Interested Party alex@grmw.org (541) 663-0570


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Completed A: 165. Environmental Compliance 06/01/2020 06/01/2020
Large Wood Structure Construction/Placement B: 29. Woodlee Large Wood Placement 06/01/2020 11/29/2019
Plant seedlings and cuttings C: 47. Plant seedlings and cuttings 06/01/2020 06/01/2020
Effective implementation management and timely contract administration D: 119. Project/Contract Administration 06/30/2020 06/30/2020
Upload Completion Report E: 132. Upper Grande Ronde HWI Woodlee Restoration Completion Report 06/15/2020 02/05/2020

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 04/01/2019
B 29 Woodlee Large Wood Placement
C 47 Plant seedlings and cuttings 07/15/2019
D 119 Project/Contract Administration 04/01/2019
E 132 Upper Grande Ronde HWI Woodlee Restoration Completion Report 04/01/2019
F 185 Quarterly Status Reports 04/01/2019