Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 84699: 2008-301-00 EXP HAB RESTORATION PLAN/DESIGN/IMPLEMENT WSR
Project Number:
Title:
Habitat Restoration Planning/Design/Implementation within boundaries of Warm Springs Reservation, lower Deschutes River, Oregon
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Deschutes 100.00%
Contract Number:
84699
Contract Title:
2008-301-00 EXP HAB RESTORATION PLAN/DESIGN/IMPLEMENT WSR
Contract Continuation:
Previous: Next:
81653: 2008-301-00 EXP HAB RESTORATION PLAN/DESIGN/IMPLEMENT WSR
  • 87255: 2008-301-00 EXP HAB RESTORATION PLAN/DESIGN/IMPLEMENT WSR
Contract Status:
Closed
Contract Description:
This contract will support ongoing aquatic habitat restoration work on the Warm Springs Reservation with in the Deschutes Basin.  During the contract period Tribal staff anticipate completing phase 1 of the Log Springs Meadow Restoration.  This project was designed under a previous contract in 2017 with fundraising and permitting occurring in 2018.  Over $800,000 have been secured through fundraising efforts that will be matched with the BPA funds provided through this contract to complete Phase 1 including the cultural resources monitoring required at this site.  

The objectives of the Log Spring Meadow Restoration Project are to:
1.  Reduce erosion derived sediment delivery in critical habitat downstream in Beaver Creek.  
2.  Restore meadow function and promote the reestablishment of culturally significant plants.  

In addition to implementing the Log Springs Project, Tribal staff will complete the environmental compliance necessary to implement the Shitike Creek Headworks Removal project in 2021.  Additional cost share fundraising will occur during the contract period to ensure this project will be full funded.  Compliance will include cultural surveys and approval through the Tribal NEPA process.  

The riparian protection fence network along with water developments will continue to be maintained protecting over 50 miles of critical anadromous fish habitat in the Warm Springs River Watershed.  

Project planning and prioritization will continue to occur using the scoring matrix developed to accompany the 2018 Aquatic Restoration Strategy for the Reservation lands.  This scoring matrix will be used to show the relative rank or score of current and future projects proposed on the Reservation using BPA funds.  These scoring outputs and project descriptions will be updated through the reporting work elements linked to this contract.  

Effectiveness monitoring will continue to occur through cost share with BPA and other project partner funding to track the effectiveness (both biological and physical) of past and future restoration actions.  Education and Outreach will continue with the Tribal public and local schools to communicate proposed future projects, project successes, and to keep youth informed about salmon, their life cycle and importance.    
Account Type(s):
Expense
Contract Start Date:
03/01/2020
Contract End Date:
02/28/2021
Current Contract Value:
$308,127
Expenditures:
$308,127

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Joshua Ashline Bonneville Power Administration Yes COR jdashline@bpa.gov (503) 230-3862
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Desmond Gelman Bonneville Power Administration No CO Assistant dxgelman@bpa.gov (503) 230-4960
Brad Houslet Confederated Tribes of Warm Springs Yes Supervisor brad.houslet@ctwsbnr.org (541) 553-2039
Leona Ike Confederated Tribes of Warm Springs No Administrative Contact leona.ike@wstribes.org (541) 553-3219
Dennis Johnson Confederated Tribes of Warm Springs No Administrative Contact dennis.johnson@wstribes.org (541) 553-3479
Deana Smith Confederated Tribes of Warm Springs No Interested Party deana.smith@ctwsbnr.org (541) 777-2844
Scott Turo Confederated Tribes of Warm Springs Yes Contract Manager scott.turo@ctwsbnr.org (541) 553-2025
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Manage contract and submit contract renewal request A: 119. Manage Restoration Program 01/11/2021 02/23/2021
Compliance Requirements Complete for Habitat Restoration Projects To Be Implemented B: 165. Obtain Environmental Compliance 02/28/2021
Education and Outreach Summary C: 99. Outreach with Tribal Public 02/28/2021 09/30/2020
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces D: 114. Prioritize and Select Future Projects for Planning, Design, and Implementation 02/28/2021 01/22/2021
Riparian Fence Report E: 26. Investigate trespass within riparian exclosures 02/28/2021 01/19/2021
Riparian Fence Maintenance F: 186. Maintain Riparian Fencing 02/28/2021 12/25/2020
Eleven Water Developments Maintained G: 186. Maintain Water Developments 02/28/2021 12/25/2020
Planning and Developments of Future Projects M: 115. Planning and Development for upcoming LWD Additions Project. 02/28/2021
Complete NWPCC proposal and review process N: 141. Other Reports for BPA 02/28/2021
Completed Annual Report O: 132. Produce Annual Report 3/1/2019 - 2/29/2020 01/22/2021 01/19/2021
Completed Annual Report P: 132. Produce Annual Report 3/1/2018 - 2/28/2019 01/22/2021 01/19/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 55 Erosion and Sedimentation Control
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 100 Construction Management
Lamprey, Pacific (Entosphenus tridentata)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Restoration Program
B 165 Obtain Environmental Compliance
C 99 Outreach with Tribal Public
D 114 Prioritize and Select Future Projects for Planning, Design, and Implementation
E 26 Investigate trespass within riparian exclosures
F 186 Maintain Riparian Fencing 04/01/2020
G 186 Maintain Water Developments 04/01/2021
H 100 Log Springs Meadow Phase I - Construction Management
I 55 Log Springs Meadow Restoration Phase I - Install Channel Plugs
J 181 Log Springs Meadow Restoration Phase I - Enhance and Restore Wetlands
K 47 Log Springs Meadow Restoration Phase I - Plant Vegetation
L 40 Log Springs Meadow Restoration Phase I – Fence Extension
M 115 Planning and Development for upcoming LWD Additions Project. 07/15/2020
N 141 Other Reports for BPA
O 132 Produce Annual Report 3/1/2019 - 2/29/2020
P 132 Produce Annual Report 3/1/2018 - 2/28/2019
Q 185 Periodic Status Reports for BPA