Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 85229: 2008-603-00 EXP PAHSIMEROI RIVER HABITAT
Project Number:
Title:
Pahsimeroi River Habitat
BPA PM:
Stage:
Complete
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
85229
Contract Title:
2008-603-00 EXP PAHSIMEROI RIVER HABITAT
Contract Continuation:
Previous: Next:
83335: 2008-603-00 EXP PAHSIMEROI RIVER HABITAT
  • 87868: 2008-603-00 EXP PAHSIMEROI RIVER HABITAT
Contract Status:
Closed
Contract Description:
The Pahsimeroi River, a tributary to the mainstem Salmon River, contains Snake River Spring/Summer Chinook, Steelhead, cutthroat trout, westslope trout, bull trout, and interior red-band trout.  Work in this contract will address habitat restoration for these species, particularly Chinook and steelhead.

The NOAA Fisheries Spring/Summer Chinook and Steelhead Recovery Plan (2017) identifies limiting factors in the Pahsimeroi River for Spring/Summer Chinook as low stream flows, passage barriers/connectivity, degraded riparian conditions, degraded channel form and lack of complexity, and water quality. Limiting factors for Pahsimeroi River Steelhead populations include reduced flows during critical periods, migration barriers, elevated water temperatures, degraded riparian conditions, and entrainment.  

Habitat restoration and recovery needs for these species include increased stream flows in the mainstem Pahsimeroi and its tributaries. The Custer SWCD is addressing the need to improve flows by working with the Idaho Department of Water Resources and with individual water users to develop water conservation measures, modify existing barriers caused by diversion or culverts, improve riparian conditions by restoring riparian vegetation, and reducing entrainment by screening irrigation ditches to NOAA standards.

This contract will allow for the Custer SWCD to work on planning of projects and coordination with landowners and water users for work that has been identified as a priority by the Upper Pahsimeroi Working Group. Once projects are identified, the District will seek assistance from NRCS or private engineering firms to provide design and assist in implementation oversight on projects. IDFG will design and install any fish screen under a separate contract. (Screen installations are done via a separate BPA project for IDFG’s Screen Shop (2007-399-00).

Work in this contract cycle will focus more on outyear planning and less on project construction in order to queue up projects for 2021 and 2022.

Implementation work in this contract will focus on installing riparian fencing on a reach of the Pahsimeroi River to protect the riparian area and eliminate streamside impacts by livestock. Fencing will exclude livestock from the restored channel and riparian area to protect the project area and allow vegetative cover to establish.

Projects planned and implemented through this contract are reviewed and ranked for implementation by the Custer SWCD in conjunction with the Pahsimeroi Basin Subcommittee group, which includes the Idaho Department of Fish and Game, U. S. Bureau of Reclamation, Idaho Department of Water Resources, Natural Resources Conservation Service, Trout Unlimited, Idaho Office of Species Conservation, the Corps of Engineers, Custer and Lemhi counties, NOAA Fisheries, US Fish and Wildlife Service, BPA, and private landowners. This group meets monthly to plan and develop approaches to address restoration needs in the Pahsimeroi River and its tributaries.

Out-year planning work in this contract includes multiple opportunities for riparian fencing and diversion modifications or removals in the Pahsimeroi, Sulpher Creek and Patterson/Big Springs Creek as the Custer SWCD continue to work with landowners to develop these plans. Custer SWCD will continue to work with the Pahsimeroi Subcommittee to identify and prioritize these projects. This effort will be accomplished with Custer SWCD staff time under this contract. Any funding to complete repairs would be developed with BPA support in a subsequent contract.  
  
Account Type(s):
Expense
Contract Start Date:
05/01/2020
Contract End Date:
04/30/2021
Current Contract Value:
$58,518
Expenditures:
$58,518

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain or complete Environmental consultation documents and provide to BPA B: 165. Produce EC documents on identified projects 04/15/2021 04/09/2021
Effective implementation management and timely contract administration C: 119. Manage and administer projects installed under this project number and with BPA funds. 04/15/2021 04/15/2021
Completed Annual Report D: 132. Submit Progress Report for the period May 1, 2020 through April 30, 2021 04/30/2021 04/30/2021
Develop or update (out-year) prioritized Habitat Project list: upload to Pisces E: 114. Identify and select projects based on partnership coordination with Pahsimeroi Subcommittee 03/31/2021 03/31/2021
Install Riparian Fence on Patterson/Big Springs Fence F: 40. Install riparian fence 1000 feet of Jack Fence on Patterson/Big Springs Creek 04/29/2021 04/29/2021
Provide design alternatives and EC documents for BPA review in order to install habitat actions in the following year contract. G: 175. Produce design for instream habitat restoration on Muddy Springs 04/30/2021

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Produce EC documents on identified projects
C 119 Manage and administer projects installed under this project number and with BPA funds.
D 132 Submit Progress Report for the period May 1, 2020 through April 30, 2021
E 114 Identify and select projects based on partnership coordination with Pahsimeroi Subcommittee
F 40 Install riparian fence 1000 feet of Jack Fence on Patterson/Big Springs Creek 05/22/2020
G 175 Produce design for instream habitat restoration on Muddy Springs 04/08/2020