SOW Report
Contract 86820: 2010-077-00 EXP MILL CREEK PASSAGE: CONCRETE PANELS (FABRICATION)
Project Number:
Title:
Tucannon River Programmatic Habitat Project
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Tucannon 100.00%
Contract Number:
86820
Contract Title:
2010-077-00 EXP MILL CREEK PASSAGE: CONCRETE PANELS (FABRICATION)
Contract Continuation:
Previous: Next:
n/a
  • CR-358042: 2010-077-00 EXP MILL CREEK PASSAGE: CONCRETE PANELS (FABRICATION)
Contract Status:
Closed
Contract Description:
This contract provides funding support for pre-construction activities primarily associated with the pre-fabrication of concrete "roughness panels" to be used to improve fish passage conditions in the Mill Creek flood control channel. Project construction to install panels on-site will commence in 2021 and continue into 2025. Fabrication needs to begin by Jan due to the total number of panels (385) projected to be installed in the next two-year planning horizon (FY21/ 22), and the rate at which panels can be built (4/custom form per week; 8 max total) because the fabrication facility is outdoors and winter weather negatively affects production.

Existing conditions in Mill Creek present depth and velocity barriers for returning summer steelhead, bull trout, and spring chinook. The roughness panels will replace some existing concrete in the channel. The additional roughness elements will create a zone of lower-velocity water, providing depths and velocities more favorable to fish passage than current conditions.
Account Type(s):
Expense
Contract Start Date:
01/01/2021
Contract End Date:
06/30/2023
Current Contract Value:
$850,000
Expenditures:
$850,000

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Kris Buelow Snake River Salmon Recovery Board Yes Technical Contact kris@snakeriverboard.org (509) 392-3858
Brian Burns Tri-State Steelheaders Yes Contract Manager brian.burns@tristatesteelheaders.com (509) 529-3543
Jay Chong Bonneville Power Administration Yes Contracting Officer jxchong@bpa.gov (503) 230-4007
John Foltz Snake River Salmon Recovery Board No Supervisor john@snakeriverboard.org (509) 382-4115
David Karl Washington Department of Fish and Wildlife (WDFW) No Technical Contact karldbk@dfw.wa.gov (509) 527-4138
Peter Lofy Bonneville Power Administration Yes COR ptlofy@bpa.gov (503) 230-4193
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Morgan Morris Tri-State Steelheaders No Administrative Contact morgan@tristatesteelheaders.com (509) 529-3543
Jacquelyn Schei Bonneville Power Administration No Env. Compliance Lead jlschei@bpa.gov (503) 230-5893
Corrie Veenstra Bonneville Power Administration Yes Interested Party cxveenstra@bpa.gov (503) 230-3503


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration A: 119. Project implementation management and contract administration 06/30/2023 06/30/2023
Environmental and Cultural Resource compliance assistance and clearance documentation B: 165. Compliance Documentation and Clearance: passage restoration and enhancement project (Mill Creek) 07/02/2021 07/01/2021
Provide pre-construction project management activities; supervise the fabrication and build-out of concrete roughness panels C: 100. Integrated Construction Planning, Concrete Panel Fabrication and Implementation Oversight: Mill Creek 06/30/2023 06/30/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Project implementation management and contract administration
B 165 Compliance Documentation and Clearance: passage restoration and enhancement project (Mill Creek)
C 100 Integrated Construction Planning, Concrete Panel Fabrication and Implementation Oversight: Mill Creek
D 185 Periodic Status Reports for BPA
E 132 [No Annual Report Required]: Report encompassed in yearly Programmatic Habitat reporting for the Tucannon (#2010-077-00)