| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 25.00% |
| Methow | 25.00% | |
| Okanogan | 25.00% | |
| Wenatchee | 25.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Provide all necessary information to EC lead | B: 165. Obtain Required Permits, Authorizations, and Documentation for the Lower Clear Creek Restoration Design Project | 09/27/2022 | 09/27/2022 | |
| Effective implementation management and timely contract administration | D: 119. Manage BPA Contracting Requirements | 09/27/2022 | 09/27/2022 | |
| Basis of Design report | E: 115. Existing Conditions Assessment | 09/27/2022 | 09/27/2022 | |
| Finalized 30% design | F: 175. Develop 30% Preliminary Restoration Design | 09/27/2022 | ||
| Submit final memorandum of key design elements | G: 175. Develop Pre-Conceptual Design for WCID Infrastructure | 09/27/2022 | 09/27/2022 | |
| Developed plan for water rights conveyance | H: 154. Develop Water Rights Conveyance Strategy | 09/27/2022 | 09/27/2022 | |
| Stakeholder coordination summary memorandum | I: 191. CCNRD Coordination with Stakeholders and BPA | 09/27/2022 | 09/27/2022 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 165 | Obtain Required Permits, Authorizations, and Documentation for the Lower Clear Creek Restoration Design Project | |||||||
| C | 132 | No Report to BPA Required Per COR -- Summary to UCSRB | |||||||
| D | 119 | Manage BPA Contracting Requirements | |||||||
| E | 115 | Existing Conditions Assessment | |||||||
| F | 175 | Develop 30% Preliminary Restoration Design | |||||||
| G | 175 | Develop Pre-Conceptual Design for WCID Infrastructure | |||||||
| H | 154 | Develop Water Rights Conveyance Strategy | |||||||
| I | 191 | CCNRD Coordination with Stakeholders and BPA |