Ensure environmental compliance requirements are complete |
A: 165. Deschutes, Fifteenmile, Hood - Complete Environmental Compliance Requirements |
|
09/30/2023 |
|
Collect water temperature data |
B: 157. Deschutes River (DR): 2022-2023 Record tributary water temperatures for lamprey life-history |
|
09/30/2023 |
|
Manage and summarize water temperature data (2022-2023) to characterize lamprey habitats |
C: 162. DR: Manage and summarize water temperature data (2022-2023) to characterize lamprey habitats |
|
09/30/2023 |
|
Tag adult lamprey at Sherars Falls |
D: 158. 2023 Tag lamprey to estimate abundance at Sherars Falls |
|
09/30/2023 |
|
Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2023 |
E: 157. DR: Collect lamprey abundance and harvest data to estimate escapement at Sherars Falls 2023 |
|
09/30/2023 |
|
Estimate adult lamprey escapement for 2023 |
F: 162. 2023 Estimate Pacific lamprey escapement upstream of Sherars Falls |
|
09/30/2023 |
|
Deliverable: J. Operate PIT arrays in Warm Spring River and Shitike Creek |
G: 157. DR: Collect data from dual reader PIT sites on CTWSRO reservation |
|
09/30/2023 |
|
Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
H: 156. Study feasibility for a mark-recapture estimate of lamprey in Warm Springs River |
|
09/30/2023 |
|
Effective population size (Ne) and age at migration of larval lamprey in Warm Springs River |
I: 156. DR: Study feasibility of Ne and age of migration of larval lamprey in Warm Springs River |
|
09/30/2023 |
|
Record, store, summarize water temperature data collected in 2022-23 for limiting factors analysis |
J: 162. Fifteenmile (FM): Manage and summarize water temperature data (2022-2023) |
|
09/30/2023 |
|
Conduct mark-recapture and creel surveys to estimate escapement upstream of Cushing Falls |
K: 157. FM: 2023 Field activities to estimate Pacific lamprey escapement estimate upstream of Cushing Falls |
|
09/30/2023 |
|
Tag lamprey |
L: 158. FM: Tag lamprey at Cushing Falls for escapement estimates |
|
09/30/2023 |
|
Fifteenmile Creek adult Pacific lamprey escapement estimate for 2023 |
M: 162. FM: Calculate lamprey escapement upstream of Cushing Falls |
|
09/30/2023 |
|
Analysis of tissue samples from larval and adult lamprey in Fifteenmile Creek |
N: 162. FM: Analysis of tissue samples from larval and adult lamprey |
|
09/30/2023 |
|
Operation of HDX PIT Tag Arrays In Fifteenmile Creek Subbasin and select tributaries. |
O: 157. FM: Record PIT tagged lamprey in Fifteenmile Creek |
|
09/30/2023 |
|
Install, operate, maintain and collect data from HDX arrays in the Hood River Subbasin |
P: 157. Hood River (HR): Collect data from half-duplex site in Hood River |
|
09/30/2023 |
|
Determine current end of distribution for Pacific lamprey within the Hood River Subbasin |
Q: 157. Document presence/absence and end of distribution of lamprey in Hood River Subbasin |
|
09/30/2023 |
|
Hood River Basin Larval Density Surveys |
R: 157. HR: Collect larval lamprey density data within Hood River and its tributaries |
|
09/30/2023 |
|
Fifteenmile Basin Larval Density Surveys |
S: 157. FM: Collect larval lamprey density data within Fifteenmile and Eightmile creeks |
|
09/30/2023 |
|
Produce accessible, error-checked datasets |
T: 157. DR: Collect larval lamprey density data from the Deschutes River and its lamprey bearing tributaries |
|
09/30/2023 |
|
Analyze distribution & density data in the Deschutes, Fifteenmile, and Hood subbasins |
U: 162. DR, FM & HR: Analyze 2022 larval lamprey surveys (end of distribution and densities) |
|
09/30/2023 |
|
Enter HDX Tag information into CTWSRO database |
V: 159. DR, FM & HR: Enter HDX PIT tag information into CTWSRO database |
|
09/30/2023 |
|
Summarize HDX Data |
W: 162. DR, FM & HR: Summarize data collected from PIT tag Arrays |
|
09/30/2023 |
|
Participate in regional lamprey research and recovery forums |
X: 189. DR, FM & HR: Participate in regional planning and recovery actions for Pacific lamprey |
|
09/30/2023 |
|
All administrative tasks fulfilled with timely quality products |
Y: 119. Manage Project |
|
09/30/2023 |
|
Completed Annual Report |
Z: 132. Submit Progress Report for the period 1/1/2021 to 12/31/2021 |
|
09/30/2023 |
|
Completed Annual Report |
AA: 132. Submit Progress Report for the period 1/1/2022 - 12/31/2022 |
|
09/30/2023 |
|