Contract 91619: 2009-003-00 EXP YN - UC HABITAT RESTORATION
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
91619
Contract Title:
2009-003-00 EXP YN - UC HABITAT RESTORATION
Contract Continuation:
Previous: Next:
89361: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION
Contract Status:
Issued
Contract Description:
This contract will fund the Yakama Nation Fisheries Upper Columbia Habitat Restoration Project to seek, design and implement fish habitat restoration projects throughout the Methow, Entiat, and Wenatchee subbasins for the Calendar Year 2023 performance period.  Administrative tasks related to this SOW, such as reporting and inventory management, are provided under BPA Contract 56662 REL 265.

This contract details salmon habitat restoration work being designed or implemented in the Upper Columbia Spring Chinook Salmon and Steelhead recovery area under the guidance of the Upper Columbia Spring Chinook Salmon and Steelhead Recovery Plan and the 2021 Habitat Restoration Prioritization.  Yakama Nation Fisheries uses project and ecological concern prioritizations contained within the 2021 Habitat Restoration Prioritization and within Habitat and Geomorphic Reach Assessments reviewed by the Upper Columbia Regional Technical Team to determine which project action types and locations to pursue.  At the project level, Yakama Nation Fisheries subcontracts with technical consultants to develop salmon habitat restoration actions that best address prioritized ecological concerns limiting salmon and steelhead productivity and abundance.  

Work Element actions in 2023 include:

DESIGN PROJECTS (2023 ENGINEERING AND DESIGN PROJECTS)

Methow Subbasin:
Lower Twisp Assessment Unit - Newby Narrows Phase 2
Methow River-Fawn Creek Assessment Unit - Methow Basin EWD Instream Flow Project
Wolf Creek Assessment Unit - Wolf Creek USFS
Chewuch River-Doe Creek Assessment Unit - Chewuch Old Yeller (USFS Lands)
Chewuch River-Pearrygin Creek Assessment Unit - Chewuch Root Canal

Wenatchee Subbasin:
Lower Nason Creek Assessment Unit - Nason Creek N1 DOT Project
Lower Chiwawa River Assessment Unit - Chiwawa Outlet Restoration and Lower Chiwawa USFS
Wenatchee River-Nahahum Canyon Assessment Unit - Lower Wenatchee River Reach 3 Restoration

Entiat Subbasin:
Entiat River-Lake Creek Assessment Unit - Entiat Stillwaters Fox Creek and Signal Peak
Mad River Assessment Unit - Mad River (USFS) Projects, Mad River Outlet, MRO Instream Flow Project

RESTORATION ACTIONS (2023 CONSTRUCTION ACTIONS)

Methow Subbasin:
Middle Twisp Assessment Unit - Scaffold Camp Side Channel Restoration

Entiat Subbasin:
Entiat River-Lake Creek Assessment Unit - Entiat Silver Falls Restoration

Wenatchee Subbasin:
Lower Nason Creek Assessment Unit - Upper Nason Creek Restoration

For all three subbasins, this contract also details a scope of work for continuing to partner with the United States Forest Service to implement salmon recovery actions on USFS managed lands.  Through a cooperative agreement with the USFS, the Yakama Nation provides some cost reimbursement coverage to the USFS for federal staff costs on conducting NEPA and environmental compliance review on Yakama Nation sponsored projects.

Future salmon habitat restoration design and implementation work is contemplated to be added to this contract under upcoming Contract Change Requests.  
Account Type(s):
Expense
Contract Start Date:
01/01/2023
Contract End Date:
12/31/2023
Current Contract Value:
$3,518,517
Expenditures:
$2,814,814

* Expenditures data includes accruals and are based on data through 31-Mar-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract’s location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes No Interested Party adas@yakamafish-nsn.gov (509) 945-0754
Brenda Aguirre Bonneville Power Administration Yes Env. Compliance Lead baguirre@bpa.gov (503) 230-5928
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Victoria Bohlen Bonneville Power Administration Yes COR vlbohlen@bpa.gov (503) 230-3506
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Joseph Connor Bonneville Power Administration Yes F&W Approver jwconnor@bpa.gov (503) 230-3172
Annet Dillman Yakama Confederated Tribes Yes Administrative Contact dila@yakamafish-nsn.gov (509) 865-2255
Madeleine Eckmann Yakama Confederated Tribes Yes Technical Contact eckm@yakamafish-nsn.gov (509) 449-2091
Tamera Hoptowit Yakama Confederated Tribes No Administrative Contact Hopta@yakamafish-nsn.gov (509) 865-5121x6354
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
James Hudson Yakama Confederated Tribes Yes Technical Contact hudj@yakamafish-nsn.gov (509) 907-0538
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Jessica Power Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Brandon Rogers Yakama Confederated Tribes Yes Supervisor rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Contract Manager h.smith@methownet.com (509) 449-2750
Elizabeth Witkowski Yakama Confederated Tribes Yes Technical Contact wite@yakamafish-nsn.gov (509) 881-7091
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Complete
Effective implementation management and timely contract administration B: 119. Perform project management and administrative duties 12/31/2023 12/31/2023
USFS Environmental Compliance on Yakama Nation Fisheries Projects D: 165. FY23 USFS NEPA 2017-164 12/31/2023 12/31/2023
Permit Level and Final Designs and Report for the Newby Narrows Project Area E: 175. Newby Narrows Phase 2 Design 2015-153 12/31/2023
Permit level Construction Plan for the Old Yeller Project Area of the Chewuch River F: 175. Chewuch Old Yeller (USFS) Designs 2019-208 12/31/2023
Conceptual Designs and Report for the Wolf Creek USFS Project G: 175. Wolf Creek USFS Conceptual Design 2021-213 12/31/2023
Confidential Water Rights Evaluation H: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 12/31/2023
Alternative Water Delivery Feasibility Assessment and Designs I: 175. Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 12/31/2023
Nason Creek N1 DOT Permit and Construction Level Designs J: 175. Nason Creek N1 DOT Design 2018-198 12/31/2023
Permit Level and Construction Level Restoration Plans for the Chiwawa River Outlet Project Area K: 175. Chiwawa Outlet Design 2019-205 12/31/2023 12/31/2023
Conceptual and Permit Level Designs and Reports for the Lower Chiwawa USFS Project L: 175. Lower Chiwawa USFS Design 2021-214 12/31/2023 12/31/2023
Lower Wenatchee Reach 3 Permitting and Final Construction Plans M: 175. Lower Wenatchee River Reach 3 Design 2017-186 12/31/2023
Permit and Final Designs for the Mad River (USFS) Project Area N: 175. Mad River USFS Design 2017-172 12/31/2023 12/31/2023
Conceptual Designs and Report for the Mad River Outlet Project Area O: 175. Mad River Outlet Design 2021-215 12/01/2023
Confidential Water Rights Evaluation P: 154. Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217 12/01/2023
Alternative Water Delivery Feasibility Assessment Q: 175. Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217 12/01/2023
Conceptual Designs and Report for the Stillwaters Fox Creek and Signal Peak Project Areas R: 175. Entiat Stillwaters/Fox Design 2019-210 12/31/2023
Construction Management Complete S: 100. Scaffold Camp Oversight 2015-146 12/31/2023 12/31/2023
Side Channel Restoration and Large Wood Habitat added into 0.4 miles of the Twisp River. T: 30. Scaffold Camp Construction 2015-146 12/31/2023 12/31/2023
Construction Management Complete U: 100. Entiat Silver Falls Restoration Oversight 2019-210 12/31/2023 12/31/2023
Large wood habitat elements added into 1 mile of the Entiat River V: 29. Entiat Silver Falls Restoration Construction 2019-210 12/31/2023 12/31/2023
Construction Management Complete W: 100. Upper Nason Creek Oversight 2020-207 12/31/2023 12/31/2023
Large wood habitat elements added into 2 miles of Nason Creek X: 29. Upper Nason Creek Construction 2020-207 12/31/2023 12/31/2023

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 12 instances of WE 175 Produce Design
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 3 instances of WE 100 Construction Management
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 11 instances of WE 175 Produce Design
  • 2 instances of WE 154 Develop and Negotiate Water Right Transaction
  • 3 instances of WE 100 Construction Management
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Perform project management and administrative duties
C 132 (No annual report required for this contract)
D 165 FY23 USFS NEPA 2017-164
E 175 Newby Narrows Phase 2 Design 2015-153 03/07/2023
F 175 Chewuch Old Yeller (USFS) Designs 2019-208 05/03/2023
G 175 Wolf Creek USFS Conceptual Design 2021-213 05/03/2023
H 154 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152
I 175 Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 07/05/2023
J 175 Nason Creek N1 DOT Design 2018-198
K 175 Chiwawa Outlet Design 2019-205 03/08/2023
L 175 Lower Chiwawa USFS Design 2021-214 04/12/2023
M 175 Lower Wenatchee River Reach 3 Design 2017-186
N 175 Mad River USFS Design 2017-172 05/03/2023
O 175 Mad River Outlet Design 2021-215
P 154 Entiat Basin MRO Instream Flow Project - Water Rights Consulting 2022-217
Q 175 Entiat Basin MRO Instream Flow Project - Eng. Feasibility Assessment 2022-217
R 175 Entiat Stillwaters/Fox Design 2019-210
S 100 Scaffold Camp Oversight 2015-146
T 30 Scaffold Camp Construction 2015-146 04/26/2023
U 100 Entiat Silver Falls Restoration Oversight 2019-210
V 29 Entiat Silver Falls Restoration Construction 2019-210 04/10/2023
W 100 Upper Nason Creek Oversight 2020-207
X 29 Upper Nason Creek Construction 2020-207 05/18/2023