| Province | Subbasin | % |
|---|---|---|
| Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Daniel Affonso | Bonneville Power Administration | Yes | Contracting Officer | dxaffonso@bpa.gov | (503) 230-5918 |
| Troy Baker | Walla Walla Basin Watershed Council | Yes | Supervisor | troy.baker@wwbwc.org | (541) 938-2170x104 |
| Chad Baumler | Bonneville Power Administration | Yes | Interested Party | CEBaumler@bpa.gov | (630) 461-5871 |
| Wendy Harris | Walla Walla Basin Watershed Council | Yes | Contract Manager | wendy.harris@wwbwc.org | (541) 938-2170 |
| Eric Hoverson | Walla Walla Basin Watershed Council | Yes | Technical Contact | eric.hoverson@wwbwc.org | (541) 938-2170 |
| Jennifer Lord | Bonneville Power Administration | Yes | COR | jklord@bpa.gov | (503) 230-5192 |
| Lindsey Mills | Bonneville Power Administration | Yes | Env. Compliance Lead | LDMills@bpa.gov | (503) 230-4039 |
| JESSICA POWER | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
| John Skidmore | Bonneville Power Administration | Yes | F&W Approver | jtskidmore@bpa.gov | (503) 230-5494 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Effective implementation management and timely contract administration | A: 119. Oversight of Project Activities | 10/31/2024 | 10/31/2024 | |
| All Environmental Compliance Consultations and Documentation Requirements Completed | B: 165. Environmental Compliance Documentation for all Exp actions | 10/31/2024 | 10/31/2024 | |
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | C: 114. Identify and select projects for Walla Walla Basin | 07/15/2024 | 08/15/2024 | |
| Coordinate with basin partners. | D: 191. Walla Walla basin watershed coordination | 10/31/2024 | 10/31/2024 | |
| Provide Outreach & Education to the Walla Walla River Basin community emphasizing BPA funded projects and their importance to the basin. | E: 99. Youth and adult project presentations & engagement | 10/31/2024 | 10/31/2024 | |
| Strategic Action Plan | F: 174. Produce Walla Walla Basin Watershed Council Strategic Action Plan | 10/31/2024 | 10/30/2024 | |
| Final Report | G: 115. Dry Creek and Lower Pine Creek Assessment | 10/31/2024 | 10/30/2024 | |
| Final Report | H: 115. Big & Little Meadow Canyon Creeks Assessment | 10/31/2024 | 10/30/2024 | |
| Vegetation is planted | I: 47. Couse Creek RM 4 Riparian Planting | 10/31/2024 | 10/23/2024 | |
| Phase 2 structures installed | J: 29. Couse Creek RM 4, Phase 2 | 10/31/2024 | 10/23/2024 | |
| Final Design | K: 175. Couse Creek RM 8 Design and Permitting | 10/31/2024 | 10/31/2024 | |
| Achieve preferred quantity & quality tree survival | L: 47. Plant native vegetation in strategic areas of the NFWWR RM 3.6-4.4 | 10/31/2024 | 04/08/2024 | |
| Provide grazing protection for vegetation benefit | M: 40. Implement grazing enclosure for NFWWR RM 3.6-4.3 riparian recovery | 10/31/2024 | 06/28/2024 | |
| Produce 100% Final design NFWWR RM 4.3-5.2 | N: 175. North Fork Walla Walla River RM 4.3-5.2 Floodplain Restoration 100% Design | 10/31/2024 | 06/10/2024 | |
| Produce approved designs to the 30% level | O: 175. North Fork Walla Walla River RM 5.2-6.5 Floodplain Restoration 30% Design | 10/31/2024 | 10/29/2024 | |
| Produce accessible, error-checked datasets | P: 157. Collect Surface Flow Data for Fish Passage and Flow Restoration Effectiveness | 10/31/2024 | 10/31/2024 | |
| Maintain Surface Water Database | Q: 160. Maintain Surface Water Database for Water Monitoring | 10/31/2024 | 10/31/2024 | |
| Deliverable: An accessible, error-checked data set with metadata | R: 162. Analyze Surface Water Data for Fish Habitat Monitoring | 10/31/2024 | 10/31/2024 | |
| Produce accessible, error-checked datasets | S: 157. Collect Water Temperature Data for Fish Passage and Flow Restoration | 10/31/2024 | 10/31/2024 | |
| Maintain Water Temperature Database | T: 160. Maintain Water Temperature Database for Fish Habitat Monitoring | 10/31/2024 | 10/31/2024 | |
| Deliverable: An accessible, error-checked data set with metadata | U: 162. Analyze Water Temperature Data for Fish Habitat Monitoring | 10/31/2024 | 10/31/2024 | |
| Completed Annual Report | V: 132. Annual Progress Report (11-1-22 to 10-31-23) | 03/15/2024 | 03/12/2024 | |
| Vegetation Planting Complete | X: 47. Plant vegetation in strategic areas of RM 4.4-5.2 | 10/31/2024 | 04/08/2024 | |
| Completed channel construction | Y: 30. Re-establish and create side channel habitat in suitable areas | 10/31/2024 | 10/20/2024 | |
| Floodplain Restoration Complete | Z: 29. Floodplain Restoration North Fork Walla River RM 4.4-5.2 Implementation | 10/31/2024 | 10/20/2024 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (Oncorhynchus tshawytscha) - All Populations |
|
| Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
| Steelhead (Oncorhynchus mykiss) - All Populations |
|
| Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 119 | Oversight of Project Activities | |||||||
| B | 165 | Environmental Compliance Documentation for all Exp actions | |||||||
| C | 114 | Identify and select projects for Walla Walla Basin | |||||||
| D | 191 | Walla Walla basin watershed coordination | |||||||
| E | 99 | Youth and adult project presentations & engagement | |||||||
| F | 174 | Produce Walla Walla Basin Watershed Council Strategic Action Plan | 05/14/2024 | ||||||
| G | 115 | Dry Creek and Lower Pine Creek Assessment | 08/16/2023 | ||||||
| H | 115 | Big & Little Meadow Canyon Creeks Assessment | 08/16/2023 | ||||||
| I | 47 | Couse Creek RM 4 Riparian Planting | 05/23/2023 | ||||||
| J | 29 | Couse Creek RM 4, Phase 2 | 07/18/2024 | ||||||
| K | 175 | Couse Creek RM 8 Design and Permitting | 05/14/2024 | ||||||
| L | 47 | Plant native vegetation in strategic areas of the NFWWR RM 3.6-4.4 | 09/28/2023 | ||||||
| M | 40 | Implement grazing enclosure for NFWWR RM 3.6-4.3 riparian recovery | 09/28/2023 | ||||||
| N | 175 | North Fork Walla Walla River RM 4.3-5.2 Floodplain Restoration 100% Design | |||||||
| O | 175 | North Fork Walla Walla River RM 5.2-6.5 Floodplain Restoration 30% Design | |||||||
| P | 157 | Collect Surface Flow Data for Fish Passage and Flow Restoration Effectiveness | 07/18/2023 | ||||||
| Q | 160 | Maintain Surface Water Database for Water Monitoring | |||||||
| R | 162 | Analyze Surface Water Data for Fish Habitat Monitoring | |||||||
| S | 157 | Collect Water Temperature Data for Fish Passage and Flow Restoration | 07/18/2023 | ||||||
| T | 160 | Maintain Water Temperature Database for Fish Habitat Monitoring | |||||||
| U | 162 | Analyze Water Temperature Data for Fish Habitat Monitoring | |||||||
| V | 132 | Annual Progress Report (11-1-22 to 10-31-23) | |||||||
| W | 185 | Periodic Status Reports for BPA | |||||||
| X | 47 | Plant vegetation in strategic areas of RM 4.4-5.2 | 09/11/2024 | ||||||
| Y | 30 | Re-establish and create side channel habitat in suitable areas | 09/11/2024 | ||||||
| Z | 29 | Floodplain Restoration North Fork Walla River RM 4.4-5.2 Implementation | 09/11/2024 |