| Province | Subbasin | % |
|---|---|---|
| Columbia Cascade | Entiat | 33.30% |
| Okanogan | 33.40% | |
| Wenatchee | 33.30% |
| Previous: | Next: |
|---|---|
| 73548 REL 151: 2023-001-00 EXP CCT UCHP METHOW HAB RESTORATION |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2025.
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Complete environmental compliance needs | B: 165. Produce Compliance Documentation | 10/31/2024 | 10/31/2024 | |
| Effective implementation management and timely contract administration | C: 119. Project Management | 10/31/2024 | 10/31/2024 | |
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish | D: 114. Project Identification and Selection Process & Coordination w/BPA | 06/10/2024 | 06/10/2024 | |
| Attend all Upper Columbia coordination meetings | E: 191. Methow Subbasin Coordination | 10/31/2024 | 09/16/2024 | |
| Complete the implementation of the Beaver Creek large and small wood project | G: 29. Beaver Creek Large and small wood | 10/31/2024 | 10/31/2024 | |
| Complete the implementation of the Peshastin Creek project | H: 29. Peshastin creek confluence project | 10/31/2024 | ||
| Complete final designs for the Chewuch Ramsey (Hummingbird) project | I: 175. Chewuch Ramsey (Hummingbird) | 10/31/2024 | ||
| Complete the draft final designs for the Lower Chewuch project | J: 175. Lower Chewuch LW and complexity | 10/31/2024 | ||
| Complete the draft final designs for the Upper Chewuch enhancement project | K: 175. Upper Chewuch floodplain enhancement | 10/31/2024 | ||
| Complete draft final designs for the Pope Entiat River project | L: 175. Pope Entiat River Restoration | 10/31/2024 | ||
| Complete draft final designs for the Little Wenatchee River restoration project | M: 175. Little Wenatchee River floodplain restoration | 10/31/2024 | ||
| Complete education and outreach in the Upper Columbia to support salmon recovery efforts | N: 99. Upper Columbia education and outreach | 10/31/2024 | ||
| Complete final designs for the Methow River HWY 20 project. | P: 175. Methow River HWY 20 | 10/31/2024 | ||
| Complete road and campsite decommisioning | Q: 33. Decommission Roads End Camp Ground on the Upper Twisp River | 08/15/2024 | ||
| Plant Riparian vegetation over .5 miles of decommissioned access road and campsites | R: 47. Decommission Roads End Camp Ground on the Upper Twisp River | 08/15/2024 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
| Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
| Trout, Bull (S. confluentus) (Threatened) |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 185 | Periodic Status Reports for BPA | |||||||
| B | 165 | Produce Compliance Documentation | |||||||
| C | 119 | Project Management | |||||||
| D | 114 | Project Identification and Selection Process & Coordination w/BPA | |||||||
| E | 191 | Methow Subbasin Coordination | |||||||
| F | 29 | Methow River Hwy 20 | |||||||
| G | 29 | Beaver Creek Large and small wood | 10/16/2024 | ||||||
| H | 29 | Peshastin creek confluence project | |||||||
| I | 175 | Chewuch Ramsey (Hummingbird) | |||||||
| J | 175 | Lower Chewuch LW and complexity | |||||||
| K | 175 | Upper Chewuch floodplain enhancement | |||||||
| L | 175 | Pope Entiat River Restoration | |||||||
| M | 175 | Little Wenatchee River floodplain restoration | |||||||
| N | 99 | Upper Columbia education and outreach | |||||||
| O | 132 | No report is required per COR | |||||||
| P | 175 | Methow River HWY 20 | |||||||
| Q | 33 | Decommission Roads End Camp Ground on the Upper Twisp River | 02/08/2024 | ||||||
| R | 47 | Decommission Roads End Camp Ground on the Upper Twisp River | 02/08/2024 |