| Effective implementation management and timely contract administration |
A: 119. Manage BPA Project |
|
12/31/2025 |
|
| All work complies with environmental regulations |
B: 165. Work with BPA on Environmental Compliance requirements. |
|
12/31/2025 |
|
| Hood River WG & SWCD support and coordination |
C: 191. Coordinate activities with the Hood River Soil and Water Conservation District / Hood River Watershed Group and partners. |
|
12/31/2025 |
|
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish |
D: 114. Identify and develop fish habitat improvement projects in the Hood River Watershed |
|
12/31/2025 |
|
| Produce accessible, error-checked datasets |
E: 157. EFID MOA - Measure Summer Base Flow in the EFID By-Pass Reach |
|
12/31/2025 |
|
| Water regulating valves installed and water savings realized |
F: 203. EFID MOA - Install restrictor valves and meters |
|
12/31/2025 |
12/20/2024 |
| Oanna/Yasui pipeline installed in fall 2024 and water savings realized in 2025 irrigation season |
G: 203. EFID MOA - East Fork Irrigation District Oanna/Yasui Implementation (continued from prior contracts) |
|
12/31/2025 |
09/30/2025 |
| SCADA system installed in _2024_ and water savings realized in _2025_ irrigation season |
H: 203. EFID MOA - East Fork Irrigation District Scada Implementation (carried forward from prior contract) |
|
12/31/2025 |
|
| Completed Annual Report |
I: 132. Prepare and submit annual progress report for the prior agreement period January 1, 2023 through March 31, 2023 |
|
06/01/2025 |
02/11/2025 |
| Provide Public Presentations and Recruit Landowners |
K: 99. CCR-50804 - Watershed and Habitat Restoration Outreach and Education |
|
12/31/2025 |
|
| Inspection of past habitat project complete |
L: 186. CCR-50804 Post-Project Inspection and Maintenance |
|
12/31/2025 |
09/30/2025 |
| Complete Annual Meeting with BPA Vegetation Management Lead |
M: 198. CCR-50804 - Big Eddy Vegetation Management on WFHR BPA ROW |
|
12/31/2025 |
|
| Designs produced |
N: 175. CCR-50804 - Powerdale RM 3 Design Development |
|
12/31/2025 |
|
| Provide Design to BPA |
O: 175. CCR-50804 East Fork Hood River Phase 2 Design - carried forward from prior agreement |
|
06/01/2025 |
06/01/2025 |
| Provide Completed Design to BPA |
P: 175. CCR-50804 East Fork Hood River Phase 3 Design - carried forward from prior agreement |
|
12/31/2025 |
|
| Final Designs Produced |
Q: 175. CCR-50804 EFID Regulating Reservoir Produce Design |
|
11/01/2025 |
|
| Submit 15% design to BPA. |
R: 175. CCR-50804 Lower Tony Creek Restoration Design & Cultural |
|
12/31/2025 |
|
| Vegetation maintenance implemented at past project sites |
S: 198. CCR-50804 - Vegetation Management |
|
12/31/2025 |
09/30/2025 |
| Gate valves installed and water savings realized |
T: 203. CCR-50804 EFID Mount Hood Flow Regulation - Gate Valve |
|
12/31/2025 |
|
| Construction Management Complete |
U: 100. CCR-51998 LEFP2 Implementation - Construction Management |
|
12/31/2025 |
|
| Improved fish habitat in 1.8 miles of East Fork Hood River |
V: 29. CCR-51998 LEFP2 Implementation - Install LWD |
|
12/31/2025 |
|
| Floodplain Enhanced |
W: 180. CCR-51998 LEFP2 Implementation - Reconnect/enhance floodplain |
|
12/31/2025 |
|
| Completed channel construction |
X: 30. CCR-51998 LEFP2 Implementation - Realign mainstem & Connect/Create side channels |
|
12/31/2025 |
|
| Vegetation enhanced |
Y: 47. CCR-51998 LEFP2 Implementation - Planting/Seeding riparian area |
|
12/31/2025 |
|