Contract 96661: 1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Project Number:
Title:
Walla Walla River Basin Fish Habitat Enhancement
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Walla Walla 100.00%
Contract Number:
96661
Contract Title:
1996-046-01 EXP WALLA WALLA BASIN FISH HABITAT ENHANCEMENT
Contract Continuation:
Previous: Next:
73982 REL 218: 1996-046-01 EXP WALLA WALLA FISH HABITAT PROJECTS
Contract Status:
Issued
Contract Description:
The CTUIR Walla Walla River Basin Fish Habitat Enhancement Project, initiated in 1996, is an ongoing effort to monitor, protect, enhance, and restore the natural form and function of rivers, floodplains, and native fish habitat. Restoration project location and selection criteria is derived from various managerial guidance documents and based upon identification and addressing factors limiting salmonid production including the Middle Columbia River Steelhead Recovery Plan (NMFS 2009), Bull Trout Recovery Plan (USFWS 2015), Walla Walla Subbasin Plan (NPCC 2004), Umatilla River Vision (Jones et al. 2008), Lower Walla Walla River Geomorphic Assessment and Action Plan (CTUIR 2014), Lower Mill Creek Final Habitat and Passage Assessment and Strategic Action Plan (CTUIR 2017), Upper Touchet River Geomorphic Assessment and Restoration Prioritization (CCCD 2020), and Upper Walla Walla River Assessment and Action Plan (CTUIR 2024). The Project is responsible for improving physical habitat conditions for ESA-Listed salmonid species.  

Major tasks to be completed by the project in this funding cycle include:    

1) Walúula Floodplain Restoration Design: Continue cross-agency cooperation and advance restoration designs (from 30-60%) for floodplain connectivity, in-stream and off-channel habitat restoration for fish and wildlife species at the confluence of the Walla Walla and Columbia Rivers. Conceptual design (15%) was completed under the previous contract, 73982 Rel 218.

2) Walla Walla RM 32.5: Complete restoration designs (60% to final) for floodplain connection and in-stream habitat enhancement for approximately 0.6 miles of the Walla Walla River near RM 32.5. 30% design was completed under the previous contract, 73982 Rel 218.

3) Túuši Wána Floodplain Restoration Design: Complete restoration designs for floodplain connection and in-stream habitat enhancement for approximately 3 miles of the Touchet River between river miles 14-17.

4) Nursery Bridge Phase II Fish Passage and Irrigation Consolidation Designs: Complete fish passage designs for the Nursery Bridge Phase II project area including both the grade control structure and Eastside irrigation point of diversion.

5) South Touchet River Large Wood Enhancement Design: Complete restoration designs for a large wood enhancement and floodplain restoration project on approximately 6.6 miles of the South Touchet River and tributaries within the Tátwin Wildlife Area.

6) Upper Mill Creek Assessment and Strategic Action Plan: Collaborate with WDFW and comanagers to complete inventory and assessment for the Upper Mill Creek basin and associated tributaries to identify and prioritize future projects.

7) Túuši Wána Floodplain Restoration Phase I: Construct floodplain enhancement at the first phase of the Tuusi Wana Floodplain Restoration project, consisting of the upstream-most 0.7 miles of the project area.

8) Enhance riparian vegetative components at restoration project sites: Plant new vegetation and maintain previously planted areas.
Account Type(s):
Expense
Contract Start Date:
04/01/2025
Contract End Date:
03/31/2026
Current Contract Value:
$1,142,797
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2025.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Coop
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. Habitat Project Implementation Management and Contract Administration 03/31/2026
Environmental compliance complete C: 165. Environmental Compliance Clearance for ecological restoration and habitat enhancement projects 03/31/2026
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish D: 114. Identify and select habitat projects that benefit salmonids 03/31/2026
Provide technical review E: 122. Provide technical support on related resource topics 03/31/2026
Completed outreach and education F: 99. Public outreach and education 03/31/2026
Vegetation maintenance complete G: 198. Maintain Vegetation at Past Projects 03/31/2026
Photopoint monitoring complete H: 186. Implementation Monitoring and Adaptive Management of Past Project Sites 03/31/2026
Produce 60% designs and BODR I: 175. Walúula Floodplain Restoration Design 03/31/2026
Final design and basis of design report complete J: 175. Walla Walla River RM 32.5 Floodplain Restoration and In-stream Enhancement Design 03/31/2026
Produce and upload final design and basis of design report K: 175. Tuusi Wana Floodplain Restoration Design 06/30/2025
Produce final design and basis of design report L: 175. South Touchet River Large Wood Enhancement Design 03/31/2026
Upload final design set M: 175. Nursery Bridge Phase II Grade Control Structure Design 03/31/2026
Upload final design set N: 175. Nursery Bridge Phase II Irrigation Consolidation Design 03/31/2026
30% Draft Assessment Complete O: 115. Upper Mill Creek Assessment 03/31/2026
Construction Management Complete P: 100. Túuši Wána Floodplain Restoration Phase I Construction Management 01/15/2026
Install large wood structures Q: 29. Túuši Wána Floodplain Restoration Phase I Large Wood Enhancement 03/31/2026
Complete floodplain enhancement R: 181. Túuši Wána Floodplain Restoration Phase I Floodplain Excavation 03/31/2026
Complete revegetation of disturbed areas and upland agricultural conversion areas S: 47. Túuši Wána Floodplain Restoration Phase I Revegetation 03/31/2026
Compile information for Progress (Annual) Report T: 132. Progress Report (2-year): Calendar-year 2025 and 2026 (01/01/2025 - 12/31/2026) 03/31/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 5 instances of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 6 instances of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 198 Maintain Vegetation
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 6 instances of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 Habitat Project Implementation Management and Contract Administration
C 165 Environmental Compliance Clearance for ecological restoration and habitat enhancement projects
D 114 Identify and select habitat projects that benefit salmonids
E 122 Provide technical support on related resource topics
F 99 Public outreach and education
G 198 Maintain Vegetation at Past Projects
H 186 Implementation Monitoring and Adaptive Management of Past Project Sites
I 175 Walúula Floodplain Restoration Design
J 175 Walla Walla River RM 32.5 Floodplain Restoration and In-stream Enhancement Design
K 175 Tuusi Wana Floodplain Restoration Design
L 175 South Touchet River Large Wood Enhancement Design
M 175 Nursery Bridge Phase II Grade Control Structure Design
N 175 Nursery Bridge Phase II Irrigation Consolidation Design
O 115 Upper Mill Creek Assessment
P 100 Túuši Wána Floodplain Restoration Phase I Construction Management
Q 29 Túuši Wána Floodplain Restoration Phase I Large Wood Enhancement
R 181 Túuši Wána Floodplain Restoration Phase I Floodplain Excavation
S 47 Túuši Wána Floodplain Restoration Phase I Revegetation
T 132 Progress Report (2-year): Calendar-year 2025 and 2026 (01/01/2025 - 12/31/2026)