Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 97623: 2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE RESTORATION
Project Number:
Title:
Columbia Land Trust Estuarine Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia River Estuary Columbia Estuary 50.00%
Elochoman 5.00%
Grays 5.00%
Lower Columbia Columbia Lower 30.00%
Kalama 5.00%
Sandy 5.00%
Contract Number:
97623
Contract Title:
2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE RESTORATION
Contract Continuation:
Previous: Next:
95716: 2010-073-00 EXP COLUMBIA LAND TRUST ESTUARINE RESTORATION
Contract Status:
Issued
Contract Description:
The recovery of Columbia River salmonids requires that a sufficient amount and diversity of habitat opportunity is provided in the estuary to accommodate the full spectrum of stocks and life history types in the basin. To accomplish this, the primary objective of this contract is to increase the diversity, extent, and spatial distribution of habitats capable of supporting multiple salmon ESUs and life history types. With this contract Columbia Land Trust will increase the development, design and construction of on-the-ground habitat restoration actions in the Columbia River Estuary that benefit threatened and endangered salmonid species and help meet biological objectives required under the Columbia River System (CRS) Biological Opinion (BiOp).

The project types and actions developed within this contract are largely related to tidal reconnection actions that restore full or near full tidal influence to areas that have been historically disconnected from tidal and fluvial hydrologic processes by levees, roads, dredge material and railroad causeways.  These restoration actions intend to restore such natural habitat forming processes as tidal hydrology, sediment accretion, and the movement of macro-detritus that shape and maintain estuarine wetland habitats.

Specific restoration objectives are: 1) Restore connectivity between river and floodplain, as well as in-river habitats 2) Increase shallow water peripheral and side channel habitats toward historic levels. 3) Acquire additional properties for future restoration opportunities.

Columbia Land Trust will assist the Action Agencies in achieving their specific estuary land protection and restoration goals by working closely with landowners, local, state and federal agencies, providing risk capital through a revolving transaction fund, negotiation capacity, legal expertise and an ability to leverage significant sources of project funding.   Columbia Land Trust has identified and is developing numerous estuary habitat acquisition and restoration projects within priority areas that this project will support. Columbia Land Trust will coordinate with and utilize the Expert Regional Technical Group (ERTG) to evaluate restoration opportunities for their ecological value and overall contribution to the Columbia Estuary Ecosystem Restoration Program (CEERP)  


Account Type(s):
Expense
Contract Start Date:
10/01/2025
Contract End Date:
09/30/2026
Current Contract Value:
$1,800,000
Expenditures:
$120,165

* Expenditures data includes accruals and are based on data through 31-Oct-2025.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual Category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Daphne Day Bonneville Power Administration Yes Env. Compliance Lead deday@bpa.gov (503) 230-5263
Jason Karnezis Bonneville Power Administration Yes F&W Approver jpkarnezis@bpa.gov (503) 230-3098
JESSICA POWER Bonneville Power Administration No CO Assistant jdpower@bpa.gov (503) 230-4023
Meg Rutledge Columbia Land Trust No Supervisor mrutledge@columbialandtrust.org (360) 696-0131
Ian Sinks Columbia Land Trust Yes Contract Manager isinks@columbialandtrust.org (503) 799-9505
Austin Tomlinson Columbia Land Trust Yes Technical Contact atomlinson@columbialandtrust.org (503) 440-0084
Jocelyn Tutak Columbia Land Trust Yes Technical Contact jtutak@columbialandtrust.org (971) 258-1045
Allan Whiting Bonneville Power Administration Yes COR AHWhiting@bpa.gov (503) 230-3786
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Complete B: 165. Ensure All Environmental Compliance is Complete 09/30/2026
Effective implementation management and timely contract administration C: 119. Provide Management and Administration of Projects 09/30/2026
Completed Progress (Annual) Report D: 132. Submit ANNUAL Progress Report for the period Jan 2025 to Dec 2025 04/30/2026
Annual Report on Property Stewardship Funds E: 141. Other Reports for BPA 04/15/2026
Completed Progress (Annual) Report F: 132. Submit Data for LCEP 2025 RME Report 03/31/2026
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish G: 114. Meet with stakeholders when approached with new project 09/30/2026
Coordination Meetings with ERTG and technical contractor H: 191. Expert Regional Technical Group (ERTG) Participation 09/30/2026
Pre-Acquisition project work I: 172. Conduct All Necessary Due Diligence Related to Land Acquisitions 09/30/2026
60% Restoration Design J: 175. RAISTAKKA--DESIGN-- 60% Design 09/30/2026
60% Project Design K: 175. GRAYS RIVER CONFLUENCE -- 60% DESIGN 09/30/2026
Final Burke Slough Restoration Design L: 175. BURKE SLOUGH -- DESIGN -- FINAL DESIGN 09/30/2026
Chinook Floodplain Final Restoration Design M: 175. CHINOOK RIVER CONFLUENCE -- RESTORATION DESIGN 09/30/2026
Conceptual Design and Feasibility Analysis N: 175. MARSHLAND FLOODPLAIN - RESTORATION CONCEPTUAL DESIGN 09/30/2026
Final Germany Creek Confluence Restoration Design O: 175. GERMANY CREEK - FLOODPLAIN RESTORATION DESIGN 09/30/2026
Floodplain Restoration Work Completed P: 180. GERMANY CREEK CONFLUENCE - FLOODPLAIN RESTORATION 09/30/2026
Produce accessible, error-checked datasets Q: 157. RESTORATION DESIGN CHALLENGES Project 09/30/2026
Produce accessible, error-checked datasets R: 157. KERRY ISLAND - Collect POST-construction Year 10 AEMR Level 3 Data 09/30/2026
Produce accessible, error-checked datasets S: 157. WALLACUT - Collect POST-Construction Year 10 AEMR Level 3 data 09/30/2026

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 3 instances of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 3 instances of WE 175 Produce Design
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened)
  • 1 instance of WE 180 Enhance Floodplain/Remove, Modify, Breach Dike
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 4 instances of WE 175 Produce Design
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 175 Produce Design
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 114 Identify and Select Projects
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Wildlife
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 165 Ensure All Environmental Compliance is Complete
C 119 Provide Management and Administration of Projects
D 132 Submit ANNUAL Progress Report for the period Jan 2025 to Dec 2025
E 141 Other Reports for BPA
F 132 Submit Data for LCEP 2025 RME Report
G 114 Meet with stakeholders when approached with new project
H 191 Expert Regional Technical Group (ERTG) Participation
I 172 Conduct All Necessary Due Diligence Related to Land Acquisitions
J 175 RAISTAKKA--DESIGN-- 60% Design
K 175 GRAYS RIVER CONFLUENCE -- 60% DESIGN
L 175 BURKE SLOUGH -- DESIGN -- FINAL DESIGN
M 175 CHINOOK RIVER CONFLUENCE -- RESTORATION DESIGN
N 175 MARSHLAND FLOODPLAIN - RESTORATION CONCEPTUAL DESIGN
O 175 GERMANY CREEK - FLOODPLAIN RESTORATION DESIGN
P 180 GERMANY CREEK CONFLUENCE - FLOODPLAIN RESTORATION
Q 157 RESTORATION DESIGN CHALLENGES Project
R 157 KERRY ISLAND - Collect POST-construction Year 10 AEMR Level 3 Data
S 157 WALLACUT - Collect POST-Construction Year 10 AEMR Level 3 data