| Effective implementation management and timely contract administration |
B: 119. Oversight of Project Activities |
|
10/31/2026 |
|
| Environmental consultation complete |
C: 165. Environmental Compliance Documentation for all contract actions |
|
10/31/2026 |
|
| Completed Progress (Annual) Report |
D: 132. Annual Progress Report (11-1-24 to 10-31-25) |
|
07/31/2026 |
|
| Implement the Walla Walla 2050 Watershed Strategy |
E: 191. Walla Walla Basin Watershed Coordination |
|
10/31/2026 |
|
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish |
F: 114. Identify and select projects for Walla Walla Basin |
|
10/31/2026 |
|
| Conduct outreach and education activities focused on youth, landowners, nontraditional partners, and other priority groups |
G: 99. Youth and adult project presentations & engagement |
|
10/31/2026 |
|
| Submit subwatershed assessment and action plan |
H: 115. Dry Creek and Lower Pine Creek Assessment |
|
10/31/2026 |
|
| Upload final design set |
I: 175. Couse Creek RM 7-7.5 Design |
|
10/31/2026 |
|
| Produce final 100% designs |
J: 175. North Fork Walla Walla River RM 6.5-7.7 Floodplain Restoration 100% Design |
|
10/31/2026 |
|
| Produce and submit 30% design set |
K: 175. North Fork Walla Walla River RM 7.7-8.8 Floodplain Restoration 30% Design |
|
10/31/2026 |
|
| Implement restoration activities in project area |
L: 29. Floodplain Restoration North Fork Walla River RM 5.2-6.5 Implementation |
|
10/31/2026 |
|
| Low-tech structures installed |
M: 29. Couse Creek RM 4 low-tech log structures |
|
10/31/2026 |
|
| Produce accessible, error-checked datasets |
N: 157. Collect Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoring |
|
10/31/2026 |
|
| Deliverable: An accessible, error-checked data set with metadata |
O: 162. Analyze Stream Flow Data for Fish Passage, Flow Restoration and Trend Monitoiring |
|
10/31/2026 |
|
| Deliverable: An accessible, error-checked data set with metadata |
P: 160. Maintain Stream Flow Database for Fish Passage, Flow Restoration and Trend Monitoiring |
|
10/31/2026 |
|
| Produce accessible, error-checked datasets |
Q: 157. Collect Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring |
|
10/31/2026 |
|
| Deliverable: An accessible, error-checked data set with metadata |
R: 162. Analyze Water Temperature Data for Fish Habitat Monitoring and Trend Monitoring |
|
10/31/2026 |
|
| Deliverable: An accessible, error-checked data set with metadata |
S: 160. Maintain Water Temperature Database for Fish Habitat Monitoring and Trend Monitoring |
|
10/31/2026 |
|
| Produce accessible, error-checked datasets |
T: 157. Conduct steelhead redd and juvenile snorkel surveys |
|
10/31/2026 |
|
| Deliverable: An accessible, error-checked data set with metadata |
U: 162. Analyze steelhead redd and juvenile snorkel data |
|
10/31/2026 |
|