| Maintain fish production and rearing facilities |
B: 61. O&M for maintenance of facilities |
|
01/31/2027 |
|
| Transport eyed eggs from the Wenatchee and Methow basins to lower Columbia River facilities for rearing to pre-smolt stage |
C: 66. Transport BY26 Coho eyed-eggs from incubation facilities to rearing facilities |
|
01/31/2027 |
|
| Broodstock adults for the Methow and Wenatchee programs |
D: 66. Trap 2026 Coho broodstock at Dryden, Tumwater, Wells Dam (east and west ladders), Methow FH, Winthrop NFH, and Leavenworth NFH (backup site only) |
|
12/15/2026 |
|
| Trinity Pilot Project and preparation for contracting/construction |
E: 115. Trinity Site Development for spring Chinook & coho |
|
01/31/2027 |
|
| Effective implementation management and timely contract administration |
F: 119. Manage and Administer 2026-2027 Project for Mid-Columbia Coho Restoration & Upper Columbia Spring Chinook and Steelhead known as Upper Columbia Production Projects |
|
01/31/2027 |
|
| Completed Progress (Annual) Report |
G: 132. Finalize annual reporting of the FY26 period (2/1/26 through 1/31/27) |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
H: 157. Analyze genetic tissue samples for PBT analysis of parental groups |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
I: 157. Collect/Generate Field and Lab Data to determine 2026 emergence timing, growth and distribution |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
J: 157. Extract CWT from 2026 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
K: 157. Collect biological data from 2026 coho brood at spawning |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
L: 157. Conduct spawning ground surveys for the 2026 return year in the Methow Basin |
|
01/31/2027 |
|
| Produce accessible, error-checked datasets |
M: 157. Conduct spawning ground surveys for the 2026 return year in the Wenatchee Basin |
|
01/31/2027 |
|
| PIT tag 10,000 summer steelhead |
N: 158. PIT tag up to 10,000 BY25 steelhead pre-smolts in the Methow Basin for 2026 releases |
|
11/30/2026 |
|
| Methow and Wenatchee acclimated PIT tagged juveniles |
O: 158. Mark/Tag Animals - PIT-tag up to 80,000 BY25 coho pre-smolts |
|
01/31/2027 |
|
| CWT and PBT marking of MCCRP |
P: 158. Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 1,700,000 BY25 coho pre-smolts |
|
01/31/2027 |
|
| Coho database management for the MCCRP |
Q: 160. Enter data into and maintain local databases |
|
01/31/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
R: 162. Analyze and interpret M&E data from 2026 |
|
01/31/2027 |
|
| Produce environmental compliance documents |
S: 165. Revise/Update Environmental Compliance Documentation for all applicable work on Coho Reintroduction and UCSCSA final site list compliance for acclimation |
|
01/31/2027 |
|
| Upload Plan to CBfish |
T: 174. Hatchery Operations and Facility Plans |
|
01/31/2027 |
|
| Upload Plan to CBfish |
U: 174. Update Upper Columbia Spring Chinook & Steelhead Acclimation (UCSCSA) Plan as sites become identified as part of the implementation schedule |
|
01/31/2027 |
|
| Spawn approximately 750 coho brood adults for 2028 program releases in the Methow Basin |
V: 176. Spawn 2026 brood coho at Winthrop NFH |
|
12/30/2026 |
|
| Spawn coho adults at Leavenworth Fish Hatchery |
W: 176. Spawn 2026 brood coho at Leavenworth NFH |
|
12/25/2026 |
|
| Coho acclimation at Goat Wall pond |
X: 176. Acclimate/Release Coho BY2024: Methow: Goat Wall Pond |
|
05/30/2026 |
|
| Coho acclimation at Twisp Weir |
Y: 176. Acclimation/Release Coho BY2024: Methow: Twisp Weir |
|
05/01/2026 |
|
| Coho acclimation at the Chewuch AP |
Z: 176. Acclimation/Release Coho BY2024: Methow: Chewuch Acclimation Facility |
|
05/05/2026 |
|
| Coho acclimation at Mid Valley Pond |
AA: 176. Acclimation/Release Coho BY2024: Methow: Mid Valley Ponds |
|
06/01/2026 |
|
| Coho and steelhead acclimation at Early Winters Ponds |
AB: 176. Acclimation/Release Coho and Winthrop NFH steelhead BY2024: Methow: Early Winters |
|
01/31/2027 |
|
| coho acclimation at Lower Twisp Ponds |
AC: 176. Acclimation/Release Coho BY2024: Methow: Lower Twisp Ponds |
|
05/15/2026 |
|
| Acclimation/Release Coho BY2023: Methow: Eightmile Ranch |
AD: 176. Acclimation/Release Coho BY2024: Methow: Eightmile Ranch |
|
06/15/2026 |
|
| Coho acclimation at Leavenworth National Hatchery |
AE: 176. Release Coho BY2024: Wenatchee: Leavenworth NFH |
|
04/25/2026 |
|
| Acclimate coho at Coulter Pond |
AF: 176. Acclimation/Release Coho BY2024: Wenatchee: Coulter pond |
|
06/30/2026 |
|
| Acclimate coho at Butcher Pond |
AG: 176. Acclimation/Release Coho BY2024: Wenatchee: Butcher pond |
|
06/30/2026 |
|
| Acclimate and release coho from Rohlfing Pond |
AH: 176. Acclimation/Release Coho BY2024: Wenatchee: Rohlfing's pond |
|
06/30/2026 |
|
| Acclimation/Release Coho BY2024: Wenatchee: Beaver Creek Pond |
AI: 176. Acclimation/Release Coho BY2024: Wenatchee: Beaver Creek Pond |
|
06/30/2026 |
|
| Acclimation/Release Coho BY2024: Wenatchee; Powerline Pond |
AJ: 176. Acclimation/Release Coho BY2024: Wenatchee; Powerline Pond |
|
06/30/2026 |
|
| Coordination of Plan with Regional Stakeholders |
AK: 191. Coordination of Plan with Regional Stakeholders |
|
01/31/2027 |
|
| Upload Plan to CBfish |
AL: 174. Produce an Annual Operations Plan |
|
01/31/2027 |
|
| Completed building or facility |
AM: 201. Peshastin and Methow Field Office Maintenance and Repairs |
|
01/31/2027 |
|
| Completed Progress (Annual) Report |
AN: 132. Finalize annual reporting of the CY25 period (2/1/25 through 1/31/26) |
|
01/31/2027 |
|