Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 98799: 1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Project Number:
Project Title:
Yakama Southern Territories Habitat Project (STHP)
BPA PM:
Project Stage:
Implementation
Project Area:
Province Subbasin %
Columbia Gorge Klickitat 100.00%
Contract Number:
98799
Contract Title:
1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Contract Continuation:
Previous: Next:
96622: 1997-056-00 EXP YAKAMA SOUTHERN TERRITORIES HABITAT PROJECT
Contract Status:
Issued
Contract Description:
SOUTHERN TERRITORIES HABITAT PROJECT

The overall goal of the Southern Territories Habitat Project (STHP) is to restore watershed processes to aid the recovery of salmonid stocks in the Mid-Columbia Region.  The Yakama Nation Fisheries Program and Yakima-Klickitat Fisheries Project (YKFP) work throughout the Yakama Reservation, usual-and-accustomed and ceded areas, managing harvest, habitat, and hatcheries, and conducting research, monitoring and evaluation around salmon, steelhead, lamprey, sturgeon, bridgelip suckers and other fish of tribal and ecological importance.  The long-term and landscape-scale view of resource management held by Yakama people—that everything is connected— is reflected in the approach to protecting and restoring healthy and resilient habitats and is succinctly stated as a “watershed” or “ridgetop to ridgetop” approach. The expanded geographic scope of this project is a reflection of the YN’s landscape level approach and a recognition that species of concern span administrative and watershed boundaries and thus recovery efforts benefit from a larger spatial scope.

STHP is sub-project within the YKFP.  The YKFP is a joint project of the Yakama Nation (lead entity) and the Washington State Department of Fish and Wildlife and is sponsored in large part by the Bonneville Power Administration with oversight and guidance from the Northwest Power and Conservation Council. The goal of the YKFP is to restore sustainable and harvestable populations of salmon, steelhead and other at-risk species that were historically present within Yakama Territories. In addition, to habitat protection and restoration work, YKFP pursues hatchery supplementation or reintroduction strategies to achieve the project goals.

PROJECT GOALS

To achieve the broad goal of restoring watershed processes to aid salmonid recovery, STHP utilizes a three prong approach:
- Assess watershed, habitat and fish conditions/status to inform the prioritization of restoration activities.
- Protect, restore, and enhance priority watershed and reaches.
- Provide educational opportunities and public outreach related to salmon, habitat, and water quality and watershed health.

Project Prioritization:

In 2021 the Klickitat Lead Entity Technical Committee collaboratively analyzed the most current biological and physical habitat data to prioritize areas and actions for habitat restoration at the watershed level. The Salmon Recovery Strategy Prioritization Framework determined tier A, B, and C priority areas and prioritized potential restoration projects within the Klickitat, White Salmon and Rock Ck basins. The Prioritization Framework and results can be found at: https://klickitatcounty.org/243/Salmon-Habitat-Recovery.

The Middle Tepee Creek LTPBR reach is located within the White Creek Subwatershed which is a high ranking Tier A subwatershed. The Tepee Creek LTPBR project will address high priority limiting habitat factors as defined by the prioritization framework, to benefit the limiting life stages for steelhead (rearing and spawning) by adding small diameter wood to increase channel roughness and increase pool frequency. Implementation will result in reducing channel downcutting, improved channel complexity, increasing pool frequency, floodplain reconnection, and sediment deposition and sorting.

The Brush Creek LTPBR reach is located within the White Creek Subwatershed which is a high ranking Tier A subwatershed. The Brush Creek LTPBR project will address high priority limiting habitat factors as defined by the prioritization framework, to benefit the limiting life stages for steelhead (rearing and spawning) by adding small diameter wood to increase channel roughness and increase pool frequency. Implementation will result in reducing channel downcutting, improved channel complexity, increasing pool frequency, floodplain reconnection, and sediment deposition and sorting.

Both the White Creek Wood Enrichment Phase 3 and Howard Lake Upper Klickitat Floodplain Restoration projects will be advanced during this contract by initiating permitting and sourcing and stockpiling wood.

Project Design:

Middle Tepee Creek LTPBR  - Anabranch Solutions, 2021, IGC 56662 REL 259

Brush Creek LTPBR - Anabranch Solutions, 2021, IGC 56662 REL 259


Project Construction:

Middle Tepee Creek LTPBR (year 3 implementation) - design (Anabranch Solutions, 2021) and permitting is complete.  Construction will be conducted by YN staff and subcontracted stewardship crew.

Brush Creek LTPBR (year 1 implementation) - design (Anabranch Solutions, 2021) and permitting is nearly complete (SEC 106 remaining).  Construction will be conducted by YN staff and subcontracted stewardship crew.
Account Type(s):
Expense
Contract Start Date:
04/01/2026
Contract End Date:
03/31/2027
Current Contract Value:
$1,128,052
Expenditures:

* Expenditures data includes accruals and are based on data through 31-Mar-2026.

BPA CO:
BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Coop
Accrual category:
Planning & Design
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Baumler Bonneville Power Administration Yes COR CEBaumler@bpa.gov (630) 461-5871
Catherine Clark Bonneville Power Administration No Env. Compliance Lead cmclark@bpa.gov (503) 230-4240
Patrick Hayden Yakama Confederated Tribes Yes Technical Contact phayden@ykfp.org (509) 945-2325
David Lindley Yakama Confederated Tribes Yes Contract Manager dlindley@ykfp.org (509) 369-3565
JESSICA POWER Bonneville Power Administration Yes CO Assistant jdpower@bpa.gov (503) 230-4023
Rubi Rodriquez (Admin Lead) Yakama Confederated Tribes Yes Administrative Contact rubi_rodriquez@yakama.com (509) 865-5121x6335
Bill Sharp Yakama Confederated Tribes Yes Supervisor Bill_Sharp@yakama.com (509) 865-5121x6355
Jesse Wilson Bonneville Power Administration Yes F&W Approver jcwilson@bpa.gov (503) 230-4506
Karen Wolfe Bonneville Power Administration Yes Contracting Officer ktwolfe@bpa.gov (503) 230-3448


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Effective implementation management and timely contract administration B: 119. BPA and SRFB Project Management and Administration 03/31/2027
Produce Environmental Compliance Documentation C: 165. Prepare Necessary Documentation for Various Environmental Compliance Needs 03/31/2027
Conduct Cultural Resources Survey and Reporting for Future Projects D: 165. Conduct Cultural Resource Surveys and Obtain Cultural Resources Clearance 03/31/2027
Conduct Salmon and Habitat Outreach and Education Activities E: 99. Project Outreach 03/31/2027
Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish F: 114. Select, Prioritize, and Begin to Develop Projects for Implementation Over the Next 2-3 Years 03/31/2027
Participate in Technical Advisory Groups G: 122. Assist Planning Activities - Technical Review 03/31/2027
Produce Permit Ready Design H: 175. Klickitat: Snyder Creek Restoration Design (RM 0.5-1.2) 03/31/2027
Complete Final Permitting for Upper Tepee Creek LTPBR. I: 175. Klickitat: Produce Final Permitting - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper Tepee Creek (RM 6.75-12.75) 03/31/2027
Final Design and Permitting Complete J: 175. Klickitat: Produce Final Design - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper White Creek (RM 10-15) 03/31/2027
Complete permitting and final design K: 175. Klickitat: Produce Final Design - White Creek LWD Phase 3 (RM 0.0 - 3.3) 03/31/2027
Produce 15% Design for Upper Klickitat Floodplain Reconnection and Habitat Complexity Project (RM 65-69) L: 175. Klickitat: Upper Klickitat Reconnection and Habitat Complexity Project (RM 65-69) 03/31/2027
Harvest and stage at least 350 trees for placement in 2027. M: 199. Klickitat: Harvest and Stage Trees - White Creek LWD Phase 3 (RM 0.0 - 3.3) 03/31/2027
Oversee and Coordinate Procurement and Harvest of Wood for Project N: 29. Klickitat: Source and Stage Materials - Howard Lake Road/Upper Klickitat Floodplain Enhancement 12/31/2026
Implement LTPBR on Middle Tepee Creek RM2.75-4.25 and RM 5.0-5.5 O: 29. Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures RM2.75-4.25 and RM 5.0-5.5 01/29/2027
Reconnection of existing side channels P: 30. Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures RM2.75-4.25 and RM 5.0-5.5 12/31/2026
Implement 1.75 River Miles of LTPBR structures on Brush Creek (RM 6.0-7.75) Q: 29. Klickitat: Brush Creek Low Tech - Install Low Tech Structures RM 6.0-7.75 02/26/2027
Reconnection of Existing Side Channels R: 30. Klickitat: Brush Creek Low Tech - Install Low Tech Structures RM 6.0-7.75 01/29/2027
Grow out containerized plants for use at STHP restoration sites. S: 47. Klickitat: Manage Native Nursery 03/31/2027
Conduct Vegetation Maintenance at Past Project Sites T: 198. Klickitat Watershed - Past Restoration Project Sites 11/15/2026
Produce accessible, error-checked datasets U: 157. Southern Territories: Streamflow Monitoring 03/31/2027
Deliverable: An accessible, error-checked data set with metadata V: 162. Klickitat: Summarize/Analyze Streamflow Monitoring Data 03/31/2027
Review Previous Designs and Update Plans, Cost Estimates and Bid Documents as Necessary W: 175. Rock Creek: Design Review Old Cabin and Blackwolf Sites 03/31/2027
Renew and administer 200 acre lease X: 92. Rock Creek: Lease 200 Acres of Land for Fisheries Conservation and Enhancement 03/31/2027
Research feasibility and secure lease for 480 acres for conservation values Y: 92. Rock Creek: Lease 480 acres of Land for Fisheries Conservation and Enhancement (Carried forward from REL 281) 03/31/2027
Conduct weed removal efforts on 2+ acres of land Z: 198. Rock Creek: Invasive Weed Control at Eight Riparian Restoration Sites 11/30/2026
Process previously collected fin samples for genotyping. AA: 115. Rock Creek: Genotyping of Juvenile Steelhead Fin Clips 03/31/2027
Produce accessible, error-checked datasets AB: 157. Rock Creek: Conduct Adult and Juvenile Steelhead PIT Tag Monitoring 03/31/2027
Produce accessible, error-checked datasets AC: 157. Rock Creek: Spawning Ground Surveys (redd counts) and Scale Collection 03/31/2027
Deliverable: An accessible, error-checked data set with metadata AD: 162. Rock Creek: Analyze Population Monitoring Information 03/31/2027
Produce accessible, error-checked datasets AE: 157. Rock Creek: Water Quality and Temperature 03/31/2027
Provide Technical Input to Development of Wind River, Dry Creek Confluence Design Documents AF: 122. Wind River - Dry Creek USFS Technical Support 03/31/2027
Completed Progress (Annual) Report AG: 132. STHP: Submit Progress Report for the period (1/1/2026 to 12/31/2026) 03/31/2027
Completed Progress (Annual) Report AH: 132. Rock Creek: Submit Progress Report for the period (1/1/2026 to 12/31/2026) 03/31/2027

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 115 Produce Inventory or Assessment
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 2 instances of WE 198 Maintain Vegetation
  • 1 instance of WE 199 Remove Vegetation
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 92 Lease Land
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 6 instances of WE 175 Produce Design
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 BPA and SRFB Project Management and Administration
C 165 Prepare Necessary Documentation for Various Environmental Compliance Needs
D 165 Conduct Cultural Resource Surveys and Obtain Cultural Resources Clearance
E 99 Project Outreach
F 114 Select, Prioritize, and Begin to Develop Projects for Implementation Over the Next 2-3 Years
G 122 Assist Planning Activities - Technical Review
H 175 Klickitat: Snyder Creek Restoration Design (RM 0.5-1.2) 01/28/2026
I 175 Klickitat: Produce Final Permitting - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper Tepee Creek (RM 6.75-12.75) 01/28/2026
J 175 Klickitat: Produce Final Design - Low-Tech Process-Based Restoration (PALs, BDA's) - Upper White Creek (RM 10-15) 01/28/2026
K 175 Klickitat: Produce Final Design - White Creek LWD Phase 3 (RM 0.0 - 3.3) 01/28/2026
L 175 Klickitat: Upper Klickitat Reconnection and Habitat Complexity Project (RM 65-69) 01/28/2026
M 199 Klickitat: Harvest and Stage Trees - White Creek LWD Phase 3 (RM 0.0 - 3.3)
N 29 Klickitat: Source and Stage Materials - Howard Lake Road/Upper Klickitat Floodplain Enhancement
O 29 Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures RM2.75-4.25 and RM 5.0-5.5
P 30 Klickitat: Middle Tepee Creek/Tepee Creek Extension Low Tech - Install Low Tech Structures RM2.75-4.25 and RM 5.0-5.5
Q 29 Klickitat: Brush Creek Low Tech - Install Low Tech Structures RM 6.0-7.75
R 30 Klickitat: Brush Creek Low Tech - Install Low Tech Structures RM 6.0-7.75
S 47 Klickitat: Manage Native Nursery
T 198 Klickitat Watershed - Past Restoration Project Sites
U 157 Southern Territories: Streamflow Monitoring
V 162 Klickitat: Summarize/Analyze Streamflow Monitoring Data
W 175 Rock Creek: Design Review Old Cabin and Blackwolf Sites 01/28/2026
X 92 Rock Creek: Lease 200 Acres of Land for Fisheries Conservation and Enhancement
Y 92 Rock Creek: Lease 480 acres of Land for Fisheries Conservation and Enhancement (Carried forward from REL 281)
Z 198 Rock Creek: Invasive Weed Control at Eight Riparian Restoration Sites
AA 115 Rock Creek: Genotyping of Juvenile Steelhead Fin Clips
AB 157 Rock Creek: Conduct Adult and Juvenile Steelhead PIT Tag Monitoring
AC 157 Rock Creek: Spawning Ground Surveys (redd counts) and Scale Collection
AD 162 Rock Creek: Analyze Population Monitoring Information
AE 157 Rock Creek: Water Quality and Temperature
AF 122 Wind River - Dry Creek USFS Technical Support
AG 132 STHP: Submit Progress Report for the period (1/1/2026 to 12/31/2026)
AH 132 Rock Creek: Submit Progress Report for the period (1/1/2026 to 12/31/2026)