| Deliverable: An accessible, error-checked data set with metadata |
B: 162. Wakish Small Contract |
|
03/31/2027 |
|
| Effective implementation management and timely contract administration |
C: 119. Manage Restoration Projects |
|
03/31/2027 |
|
| Deliverable |
D: 165. Environmental Compliance |
|
03/31/2027 |
|
| Deliverable |
E: 99. Conduct Field Education - Restoration - Salmonid Life Histories |
|
03/31/2027 |
|
| Develop or update (out-year) prioritized Habitat Project list: Upload to CBFish |
F: 114. Select habitat improvement actions and identify possible projects for next fiscal year |
|
10/31/2026 |
|
| Deliverable |
G: 160. Update Project Database |
|
03/31/2027 |
|
| Deliverable |
H: 161. Create informal summary reports and maps |
|
03/31/2027 |
|
| Deliverable |
I: 122. Input to various Tribal planning and policy efforts |
|
03/31/2027 |
|
| Produce accessible, error-checked datasets |
J: 157. Operate rotary screw traps for steelhead |
|
03/31/2027 |
|
| Produce accessible, error-checked datasets |
K: 157. Conduct steelhead and bull trout spawner surveys |
|
03/31/2027 |
|
| Produce accessible, error-checked datasets |
L: 157. Collect water temperature data |
|
03/31/2027 |
|
| Produce accessible, error-checked datasets |
M: 157. Collect discharge measurements |
|
03/31/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
N: 162. Analyze redd count data |
|
03/31/2027 |
|
| Deliverable: An accessible, error-checked data set with metadata |
O: 162. Analyze Steelhead Outmigrant Data |
|
03/31/2027 |
|
| Deliverable |
P: 186. Assist with the operation of diversions and screens on Ahtanum Creek |
|
03/31/2027 |
|
| Deliverable |
Q: 186. Assist with operation of diversions and screens on Toppenish Creek |
|
03/31/2027 |
|
| Deliverable |
R: 186. Maintain stock tanks/livestock fences/improved springs |
|
03/31/2027 |
|
| Maintained vegetation |
S: 198. Maintain vegetation |
|
03/31/2027 |
|
| Construction Management Complete |
T: 100. Pom Pom RM 40 Bridge and Channel Construction - Construction Management |
|
03/31/2027 |
|
| Completed channel construction |
U: 30. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2027 |
|
| Submit AsBuilts |
V: 85. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2027 |
|
| Deliverable |
W: 47. Pom Pom Revegetation |
|
03/31/2027 |
|
| Upload Summary of Work Completed Under The On-Call |
X: 174. On Call Services - Engineering Support |
|
03/31/2027 |
|
| Upload Plan to CBfish |
Y: 174. Satus Creek Riparian Reach Assessment |
|
03/31/2027 |
|
| Final Design |
Z: 175. Toppenish Wood Loading RM 45 - 51- Produce Designs |
|
03/31/2027 |
|
| Completed Progress (Annual) Report |
AA: 132. Produce Project Annual Report for FY23 April2024-March2025 |
|
03/16/2027 |
|
| Wetland Assessment and Environmental Permitting Services |
AB: 165. On Call Services - Wetland Assessment & Environmental Permitting |
|
03/31/2027 |
|
| Final Design for Ahtanum Creek at Lynch Lane |
AC: 175. Ahtanum at Lynch Lane Stream Restoration Design |
|
03/31/2027 |
|
| Deliverable: Satus Creek In-stream Projects Identified |
AD: 175. Satus Creek RM 10.3-11.1 Habitat Improvement |
|
03/31/2027 |
|
| Complete planting |
AE: 47. Satus RM 23 LWD |
|
03/31/2027 |
|
| Construct Engineered Log Jams |
AF: 29. Satus RM 23 LWD |
|
03/31/2027 |
|
| Install Lateral A Fish Screen |
AG: 208. Lateral A Fish Screen |
|
03/31/2027 |
|
| Increased Fish Passage |
AH: 184. Snake Creek Passage Enhancement - Culvert Replacement |
|
03/31/2027 |
|
| Improve Fish Passage and Decrease Juvenile Stranding |
AI: 208. Snake Creek Passage Enhancement Fish Screen and Roughened Channels |
|
03/31/2027 |
|
| Construct Starvation Flats Restoration Project |
AJ: 29. Starvation Flats Phase 3 |
|
03/31/2027 |
|
| Valley Grade Control Structure, Ditch Plugs, Native Plant Revegetation |
AK: 180. Starvation Flats Phase 3 |
|
03/31/2027 |
|
| Complete Restoration Project Construction |
AL: 29. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2027 |
|
| Complete construction of the restoration project |
AM: 180. Pom Pom RM 40 Bridge Construction and Channel Alignment |
|
03/31/2027 |
|