| Province | Subbasin | % |
|---|---|---|
| Intermountain | Columbia Upper | 100.00% |
| Previous: | Next: |
|---|---|
| 96658: 1995-027-00 EXP LAKE ROOS STURGEON RECOVERY UPPER COL R SPOK TR |
* Expenditures data includes accruals and are based on data through 31-Mar-2026.
| Full Name | Organization | Write Permission | Contact Role | Work Phone | |
|---|---|---|---|---|---|
| Daniel Affonso | Bonneville Power Administration | Yes | Contracting Officer | dxaffonso@bpa.gov | (503) 230-5918 |
| Edward Gresh | Bonneville Power Administration | Yes | Env. Compliance Lead | esgresh@bpa.gov | (503) 230-5756 |
| Peter Lofy | Bonneville Power Administration | Yes | F&W Approver | ptlofy@bpa.gov | (503) 230-4193 |
| Carlos Matthew | Bonneville Power Administration | Yes | COR | cjmatthew@bpa.gov | (503) 230-3418 |
| Andy Miller | Spokane Tribe | Yes | Contract Manager | amiller@spokanetribe.com | (509) 244-7031 |
| Brent Nichols | Spokane Tribe | Yes | Supervisor | bnichols@spokanetribe.com | (509) 244-7031x200 |
| JESSICA POWER | Bonneville Power Administration | No | CO Assistant | jdpower@bpa.gov | (503) 230-4023 |
| Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
|---|---|---|---|---|
| Complete Environmental Compliance | A: 165. Complete BPA Environmental Compliance | 03/31/2027 | ||
| Release BY 2025 PIT Tagged and Scute Marked Juvenile Hatchery White Sturgeon | B: 158. PIT Tag and Scute Mark Hatchery White Sturgeon | 03/31/2027 | ||
| Release Hatchery White Sturgeon (BY 25) | C: 176. Rear & Release BY 2026 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River | 03/31/2027 | ||
| Distribute Data and Results amongst Project Participants and the UCWSRI | D: 161. Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative | 03/31/2027 | ||
| Produce accessible, error-checked datasets | E: 157. Conduct Juvenile White Sturgeon Monitoring | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | F: 162. Analysis of Juvenile Monitoring Data | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | G: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data | 03/31/2027 | ||
| Acoustic Telemetry Monitoring | H: 157. Monitor and Maintain the Lake Roosevelt Acoustic Array | 03/31/2027 | ||
| Acoustic Telemetry Analysis | I: 162. Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data | 03/31/2027 | ||
| Produce accessible, error-checked datasets | J: 157. Collect BY26 White Sturgeon Larvae for the Conservation Aquaculture Program | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | K: 162. Analysis of 2026 Larval Collection Data | 03/31/2027 | ||
| Produce accessible, error-checked datasets | L: 157. Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | M: 162. Analysis of Blood Sample Data to Determine Ploidy Rates | 03/31/2027 | ||
| Produce accessible, error-checked datasets | N: 157. Conduct Stock Assessment Survey in the Spokane River | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | O: 162. Analysis of Stock Assessment Data | 03/31/2027 | ||
| Produce accessible, error-checked datasets | P: 157. Monitor Walleye movements in the Transboundary Reach | 03/31/2027 | ||
| Deliverable: An accessible, error-checked data set with metadata | Q: 162. Analysis of Walleye Acoustic Telemetry Data | 03/31/2027 | ||
| Develop, Organize and Participate in Public Outreach Activities | R: 99. Lake Roosevelt White Sturgeon Recovery Project Public Outreach | 03/31/2027 | ||
| Upload Plan to CBfish | S: 174. Produce Annual Production Plan | 03/31/2027 | ||
| Effective implementation management and timely contract administration | T: 119. Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts | 03/31/2027 | ||
| Completed Progress (Annual) Report | U: 132. Submit 2025 (Annual) Progress Report for the Period (April 2025) to (March 2026) | 03/31/2027 |
| Primary Focal Species | Work Statement Elements |
|---|---|
| Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
| Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
|---|---|---|---|---|---|---|---|---|---|
| A | 165 | Complete BPA Environmental Compliance | |||||||
| B | 158 | PIT Tag and Scute Mark Hatchery White Sturgeon | 11/17/2025 | ||||||
| C | 176 | Rear & Release BY 2026 Hatchery Origin White Sturgeon into Lake Roosevelt/Upper Columbia River | 11/17/2025 | ||||||
| D | 161 | Provide Summary Data to Project Participants and the Upper Columbia White Sturgeon Initiative | |||||||
| E | 157 | Conduct Juvenile White Sturgeon Monitoring | 11/17/2025 | ||||||
| F | 162 | Analysis of Juvenile Monitoring Data | |||||||
| G | 162 | Analysis of Lake Roosevelt White Sturgeon Recovery Project Adult Sturgeon Data | |||||||
| H | 157 | Monitor and Maintain the Lake Roosevelt Acoustic Array | 11/17/2025 | ||||||
| I | 162 | Analysis of Lake Roosevelt White Sturgeon Recovery Project Telemetry Data | |||||||
| J | 157 | Collect BY26 White Sturgeon Larvae for the Conservation Aquaculture Program | 11/17/2025 | ||||||
| K | 162 | Analysis of 2026 Larval Collection Data | |||||||
| L | 157 | Determine Ploidy Rates (8N, 10N, and 12N) of Wild Caught Larvae Produced for the Conservation Aquaculture Program | 11/17/2025 | ||||||
| M | 162 | Analysis of Blood Sample Data to Determine Ploidy Rates | |||||||
| N | 157 | Conduct Stock Assessment Survey in the Spokane River | 11/17/2025 | ||||||
| O | 162 | Analysis of Stock Assessment Data | |||||||
| P | 157 | Monitor Walleye movements in the Transboundary Reach | 11/17/2025 | ||||||
| Q | 162 | Analysis of Walleye Acoustic Telemetry Data | |||||||
| R | 99 | Lake Roosevelt White Sturgeon Recovery Project Public Outreach | |||||||
| S | 174 | Produce Annual Production Plan | 11/17/2025 | ||||||
| T | 119 | Manage and Administer Lake Roosevelt White Sturgeon Recovery Project Contracts | |||||||
| U | 132 | Submit 2025 (Annual) Progress Report for the Period (April 2025) to (March 2026) | |||||||
| V | 185 | Periodic Status Reports for BPA |